March 2, 2016
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (REPORT 05000275/2015006 AND 05000323/2015006)
Dear Mr. Halpin:
On February 16, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Diablo Canyon Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Diablo Canyon Power Plant, Units 1 and 2, began the most recent quarter in the Regulatory Response Column (Column 2) of the NRCs Reactor Oversight Process (ROP) Action Matrix because of one White finding in the Emergency Preparedness Cornerstone. On December 15, 2015, the NRC completed a supplemental inspection pursuant to Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, at the Diablo Canyon Power Plant. Based on the results of this inspection, the NRC closed the White Emergency Preparedness finding and updated its assessment of Diablo Canyon Power Plant, Units 1 and 2, as documented in Inspection Report and Follow-up Assessment Letter 05000275/2015503 and 05000323/2015503 (ML15362A615). This updated assessment transitioned Diablo Canyon Power Plant, Units 1 and 2, to the Licensee Response Column (Column 1) of the NRCs ROP Action Matrix as of December 28, 2015. Therefore, beginning in the first quarter 2016, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Diablo Canyon Power Plant, Units 1 and 2, and the information gathered will aid staff in development of the Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Jeremy Groom at 817-200-1148 with any questions you have regarding this letter.
Sincerely,
/RA/
Troy W. Pruett, Director Division or Reactor Projects
Docket Nos. 50-275, 50-323 License Nos. DPR-80, DPR-82
Enclosure:
Diablo Canyon Inspection/Activity Plan
.
SUNSI Review By:
JRG ADAMS:
Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword NRC-002 OFFICE BC:DRP/A D:DRS D:DRP D D:DRP NAME JGroom AVegel RLantz TPruett SIGNATURE
/RA/
/RA/
/RA/
/RA/
DATE 2/24/16 2/24/16 2/26/16 2/29/16
Letter to Edward Halpin from Troy Pruett, dated March 2, 2016
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (REPORT 05000275/2015001 AND 05000323/2015001)
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Binesh.Tharakan@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Matthew.Kirk@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Siva.Lingam@nrc.gov)
Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Raj.Iyengar@nrc.gov)
Director, DIRS, NRR (Scott.Morris@nrc.gov)
Deputy Director, DIRS, NRR (Clay.Johnson@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, DPR (Lawrence.Kokajko@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov
Page 1 of 2 02/29/2016 15:44:01 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Diablo Canyon Inspection / Activity Plan 04/01/2016 - 12/31/2017 EXAM
- INITIAL EXAM
1 2ND INITIAL EXAM DC U1 (09/2016)
X02599 09/19/2016 09/23/2016
2ND INITIAL EXAM DC U2 (09/2016)
X02600 09/19/2016 09/23/2016
2ND INITIAL EXAM DC U1 (09/2016)
X02599 10/03/2016 10/07/2016
2ND INITIAL EXAM DC U2 (09/2016)
X02600 10/03/2016 10/07/2016 EXAMS
- INITIAL OPERATOR EXAM
1 INITIAL EXAM DIABLO CANYON UNIT 1 (04/2016)
X02569 04/18/2016 04/26/2016
INITIAL EXAM DIABLO CANYON UNIT 2 (04/2016)
X02570 04/18/2016 04/26/2016 RS 12 PI
- RADIATION SAFETY
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/09/2016 05/13/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/09/2016 05/13/2016 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 05/09/2016 05/13/2016 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 05/09/2016 05/13/2016 71111.08
- INSERVICE INSPECTION 2R19
2 IP Inservice Inspection Activities - PWR 7111108P 05/09/2016 05/20/2016 TSB 52B
- BIENNIAL PI&R INSPECTION
1, 2 IP Problem Identification and Resolution 71152B 06/27/2016 07/01/2016 1, 2 IP Problem Identification and Resolution 71152B 07/11/2016 07/15/2016 EB1-07T
- DC TRIENNIAL HEAT SINK PERFORMANCE
1, 2 IP Heat Sink Performance 7111107T 08/01/2016 08/05/2016 RS 5678
- RADIATION SAFETY - TEAM
1, 2 IP Radiation Monitoring Instrumentation 71124.05 08/08/2016 08/12/2016 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/08/2016 08/12/2016 1, 2 IP Radiological Environmental Monitoring Program 71124.07 08/08/2016 08/12/2016 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/08/2016 08/12/2016 ISFSI
- LOADING INSPECTION (ONE WEEK IN MONTH)
1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/01/2016 09/30/2016 EB2-05XT
- TRIENNIAL FIRE PROTECTION INSPECTION
1, 2 IP Fire Protection - NFPA 805 (Triennial)
7111105X 10/03/2016 10/07/2016 1, 2 IP Fire Protection - NFPA 805 (Triennial)
7111105X 10/17/2016 10/21/2016 EP-2
- EP PERFORMANCE INDICATORS
1 IP Drill/Exercise Performance 71151-EP01 10/31/2016 11/04/2016
IP ERO Readiness 71151-EP02 10/31/2016 11/04/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 02/29/2016 15:44:01 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Diablo Canyon Inspection / Activity Plan 04/01/2016 - 12/31/2017 EP-2
- EP PERFORMANCE INDICATORS
1 IP Alert & Notification System Reliability 71151-EP03 10/31/2016 11/04/2016 EP-3
- BIENNIAL EP EXERCISE INSPECTION
1 IP Exercise Evaluation 7111401 10/31/2016 11/04/2016
IP Emergency Action Level and Emergency Plan Changes 7111404 10/31/2016 11/04/2016 INSP-BRQ
- BIENNIAL REQUAL INSPECTION
1, 2 IP Licensed Operator Requalification Program 7111111B 04/03/2017 04/07/2017 RS 13 PI
- RADIATION SAFETY
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/08/2017 05/12/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/08/2017 05/12/2017 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 05/08/2017 05/12/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 05/08/2017 05/12/2017 71111.08
- INSERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 05/08/2017 05/19/2017 EB1-17T
- DC PERMANENT PLANT MODS & 50.59
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 06/12/2017 06/30/2017 RS 24
- RADIATION SAFETY
1, 2 IP Occupational ALARA Planning and Controls 71124.02 07/31/2017 08/04/2017 1, 2 IP Occupational Dose Assessment 71124.04 07/31/2017 08/04/2017 EP-1
- BIENNIAL EP PROGRAM INSPECTION
1, 2 IP Alert and Notification System Testing 7111402 08/28/2017 09/01/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 08/28/2017 09/01/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 08/28/2017 09/01/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/28/2017 09/01/2017 EP-2
- EP PERFORMANCE INDICATOR VERIFICATION
1, 2 IP Drill/Exercise Performance 71151-EP01 08/28/2017 09/01/2017 1, 2 IP ERO Readiness 71151-EP02 08/28/2017 09/01/2017 1, 2 IP Alert & Notification System Reliability 71151-EP03 08/28/2017 09/01/2017 This report does not include INPO and OUTAGE activities.