IR 05000275/2020005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2020005 and 05000323/2020005)
ML20240A320
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/01/2020
From: Jeffrey Josey
NRC/RGN-IV/DRP/RPB-A
To: Welsch J
Pacific Gas & Electric Co
References
IR 2020005
Download: ML20240A320 (7)


Text

September 1, 2020

SUBJECT:

UPDATED INSPECTION PLAN FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (REPORT 05000275/2020005 AND 05000323/2020005)

Dear Mr. Welsch:

The enclosed inspection plan lists the inspections scheduled through June 30, 2022, for Diablo Canyon Power Plant, Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC)

provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP), including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the May 28, 2020, memorandum, Inspection Guidance During Transition From COVID-19 Mandatory Telework (Agencywide Documents Access and Management System (ADAMS)

Accession Number ML20141L766). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance, but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.

Additionally, during this period the NRC will schedule an additional inspection per a revised version of Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ADAMS Accession Number ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1148 with any questions you have regarding this letter.

Sincerely, Digitally signed by Jeffrey Jeffrey Josey Josey Date: 2020.08.31 07:56:26-05'00'

Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82 Enclosure:

Inspection Plan cc w/ encl: Distribution via LISTSERV

ML20240A320 SUNSI Review Non-Sensitive Publicly Available

Sensitive Non-Publicly Available OFFICE SPE:DRP/A C:DRP/A NAME HFreeman JJosey SIGNATURE /RA/ /RA/

DATE 08/24/2020 08/25/2020

IP 22 Inspection Activity Plan Report 07200026 - Diablo Canyon (ISFSI)

07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Diablo Canyon ISFSI Routine Inspection (1 week in December) 2 1 11/15/2020 12/31/2020 IP 60857 001004 Review of 10 CFR 72.48 Evaluations 1 11/16/2020 12/31/2020 IP 60855 001001 Operation Of An ISFSI This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.

8/27/2020 8:14:51 AM

IP 22 Inspection Activity Plan Report Diablo Canyon 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Diablo Canyon Biennial PI&R Inspection 4 1, 2 07/19/2020 08/29/2020 IP 71152B 000747 Problem Identification and Resolution RS58 Radiation Safety - DC 4 1, 2 08/24/2020 08/28/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 08/24/2020 08/28/2020 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation MC&A - Material Control & Accounting - DC 1 1, 2 08/24/2020 08/28/2020 IP 71130.11 000742 Material Control and Accounting (MC&A)

EP Program Insp - DC 1 1, 2 09/14/2020 09/18/2020 IP 71114.02 000717 Alert and Notification System Testing 1, 2 09/14/2020 09/18/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 09/14/2020 09/18/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 09/14/2020 09/18/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 09/14/2020 09/18/2020 IP 71151 001397 Performance Indicator Verification Inservice Inspection 1RF22 - DC 1 1 10/05/2020 10/16/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RS13PI Radiation Safety 2 1, 2 10/19/2020 10/23/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/19/2020 10/23/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Security Protective Strategy .05 w/Exercise - DC 2 1, 2 11/16/2020 11/20/2020 IP 71130.05 000737 Protective Strategy Evaluation Security Access Control .02 - DC 1 1, 2 11/30/2020 12/04/2020 IP 71130.02 000734 Access Control 1, 2 11/30/2020 12/04/2020 IP 71130.09 001656 Security Plan Changes 1, 2 11/30/2020 12/04/2020 IP 71151 001338 Performance Indicator Verification Security Equipment .04 and Training .07 - DC 2 1, 2 11/30/2020 12/03/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 11/30/2020 12/03/2020 IP 71130.07 000739 Security Training This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.

8/27/2020 8:14:51 AM

IP 22 Inspection Activity Plan Report Diablo Canyon 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count DC 2021 INITIAL EXAM 8 1, 2 12/07/2020 12/11/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 01/24/2021 01/30/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

1, 2 01/31/2021 02/06/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Fire Protection Inspection - DC 3 1, 2 01/25/2021 01/29/2021 IP 71111.21N.05 001646 DO NOT USE: Fire Protection Team Inspection (FPTI)

1, 2 02/08/2021 02/12/2021 IP 71111.21N.05 001646 DO NOT USE: Fire Protection Team Inspection (FPTI)

Cyber Security Inspection - DC 4 1, 2 02/22/2021 02/26/2021 IP 71130.10P 000741 Cyber Security 1, 2 03/08/2021 03/12/2021 IP 71130.10P 000741 Cyber Security RP 2,4 2 1, 2 03/01/2021 03/05/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/01/2021 03/05/2021 IP 71124.04 000728 Occupational Dose Assessment DC 2021 BRQ 3 1, 2 03/14/2021 03/20/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance TI 2515/194 - DC 1 1, 2 04/05/2021 04/09/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

Inservice Inspection 2RF22 - DC 1 2 04/26/2021 05/07/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,2,PI 2 1, 2 05/03/2021 05/07/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 05/03/2021 05/07/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Security FFD .08 1 1, 2 06/21/2021 06/25/2021 IP 71130.08 000740 Fitness For Duty Program In-Office EP Exercise Scenario Rvw 71114.08 - DC 4 1, 2 07/01/2021 08/16/2021 IP 71114.08 000723 Exercise Evaluation  Scenario Review This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.

8/27/2020 8:14:51 AM

IP 22 Inspection Activity Plan Report Diablo Canyon 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Design Bases Assurance (Program) 21N - Diablo Canyon 3 1, 2 07/26/2021 08/13/2021 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

EP Exercise & PI Inspection - DC 4 1, 2 09/13/2021 09/17/2021 IP 71114.01 000716 Exercise Evaluation 1, 2 09/13/2021 09/17/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 09/13/2021 09/17/2021 IP 71151 001397 Performance Indicator Verification RP 6,7 2 1, 2 09/20/2021 09/24/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 09/20/2021 09/24/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program Security Access Authorization .01 and Access Control .02 w/PIV 2 1, 2 10/04/2021 10/08/2021 IP 71130.01 000733 Access Authorization 1, 2 10/04/2021 10/08/2021 IP 71130.02 000734 Access Control 1, 2 10/04/2021 10/08/2021 IP 71130.09 001656 Security Plan Changes 1, 2 10/04/2021 10/08/2021 IP 71151 001338 Performance Indicator Verification Diablo Canyon 1, 2 - Heat Sink Performance (Triennial) 2 1, 2 10/18/2021 10/22/2021 IP 71111.07T 000700 Heat Sink Performance Inservice Inspection 1RF23 - DC 1 1 03/28/2022 04/08/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,2,PI 2 1, 2 04/04/2022 04/08/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/04/2022 04/08/2022 IP 71124.02 000726 Occupational ALARA Planning and Controls DC 2022 INITIAL EXAM 4 1, 2 06/05/2022 06/11/2022 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.

8/27/2020 8:14:51 AM