|
---|
Category:Inspection Plan
MONTHYEARML23249A2782023-09-0606 September 2023 Inservice Inspection Request for Information IR 05000275/20230052023-08-22022 August 2023 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023005 and 05000323/2023005) - Mid Cycle Letter IR 05000275/20220062023-03-0101 March 2023 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022006 and 05000323/2022006) ML23005A1732023-01-0909 January 2023 Notification of Commercial Grade Dedication Inspection IR 05000275/20220052022-08-23023 August 2022 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022005 and 05000323/2022005) ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22068A2312022-03-17017 March 2022 Notification of NRC Design Bases Assurance Inspection (Team) 05000275/2022011 and 05000323/2022011 and Initial Request for Information IR 05000275/20210062022-03-0202 March 2022 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2021006 and 05000323/2021006) ML22019A0412021-12-29029 December 2021 RFI ML21230A3902021-09-0101 September 2021 DC Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21229A2242021-08-17017 August 2021 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection (05000275/2021004 and 05000323/2021004) and Request for Information ML21130A3642021-06-21021 June 2021 DC 2021401 Information Request ML21069A2102021-03-12012 March 2021 Notification of Inspection (NRC Inspection Report 05000275/2021002, 05000323/2021002) and Request for Information IR 05000275/20200062021-03-0303 March 2021 DC 2020 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 & 2 (Report 05000275/2020006 & 05000323/2020006) ML21061A3302021-02-25025 February 2021 Request for Information: Diablo Canyon Power Plant, Dated January 6, 2021; IR 05000275/323/2021-001 Occupational Radiation Safety Inspection - 2, 4 ML20301A2212020-10-27027 October 2020 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000275/2021010 and 05000323/2021010) and Request for Information IR 05000275/20200052020-09-0101 September 2020 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2020005 and 05000323/2020005) ML20280A5432020-06-0303 June 2020 DC 2020 PIR Request for Information ML20055E1082020-03-0303 March 2020 DC 2019006 Annual Assessment Letter IR 05000275/20190052019-08-30030 August 2019 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2, Report 05000275/2019005 and 05000323/2019005 IR 05000275/20180062019-03-0404 March 2019 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018006 and 05000323/2018006) ML19043A9452019-02-20020 February 2019 Notification of Inspection (NRC Inspection Report 05000275/2019002, 05000323/2019002 and Request for Information IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) IR 05000275/20170062018-03-0101 March 2018 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2017006 and 05000323/2017006) IR 05000275/20170052017-08-28028 August 2017 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2017005 and 05000323/2017005) ML17243A3022017-08-28028 August 2017 Updated Non-Public Security Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 IR 05000275/20160062017-03-0101 March 2017 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016006 and 05000323/2016006) ML17037D1232017-02-0606 February 2017 Notification of Inspection (NRC Inspection Report 05000275/2017002; 05000323/2017002) and Request for Information ML16239A2532016-08-31031 August 2016 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016005 and 05000323/2016005) IR 05000275/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016005 and 05000323/2016005) IR 05000275/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2016401 and 05000323/201640) IR 05000275/20150062016-03-0202 March 2016 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2015006 and 05000323/2015006) IR 05000275/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2015401 and 05000323/2015401) IR 05000275/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2015005 and 05000323/2015005) IR 05000275/20140012015-03-0404 March 2015 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2, (Report 05000275/2014001 and 05000323/2014001) IR 05000275/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2014402 and 05000323/2014402) IR 05000275/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2014006 and 05000323/2014006) IR 05000275/20130012014-03-0404 March 2014 IR 05000275-13-001 & 05000323-13-001, 02/12/2014, Diablo Canyon, Unit 1 & 2, Annual Assessment Inspection Plan ML13246A2882013-09-0303 September 2013 Midcycle Assessment Letter 2013 ML13206A1892013-07-25025 July 2013 IR 05000275-13-004, and 05000323-13-004, Diablo Canyon Power - Notification of NRC Triennial Heat Sink Performance Inspection IR 05000275/20128012013-03-0404 March 2013 Annual Assessment Letter for Diablo Canyon Power Plant Units 1 & 2 (IR 05000275-12-801 and 05000323-12-801) ML13032A3142013-02-0101 February 2013 IR 05000275-13-007, 05000323-13-007, on 05/20/2013, Diablo Canyon - Notification of NRC Component Design Bases Inspection and Initial RAI IR 05000275/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant (05000275/2012006, 05000323/2012006) IR 05000275/20120012012-03-0505 March 2012 Annual Assessment Letter for Diablo Canyon Power Plant - Units 1 and 2 (Report 05000275/2012001 and 05000323/2012001) ML1124401692011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant - Units 1 and 2 ML1029503242010-10-21021 October 2010 Notification of NRC Triennial Heat Exchanger Inspection 05000275-10-005 & 05000323-10-005 ML1024403362010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant IR 05000275/20100012010-03-0303 March 2010 Annual Assessment Letter - Diablo Canyon Power Plant (NRC IR 05000275-10-001 and 05000323-10-001 ML0924001372009-09-0101 September 2009 Midcycle Assessment IR 05000275/20090012009-03-0404 March 2009 Annual Assessment Letter and Inspection Plan 2008 (NRC Inspection Reports 05000275-09-001 and 05000323-09-001) 2023-09-06
[Table view] Category:Letter
MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] |
Text
September 1, 2020
SUBJECT:
UPDATED INSPECTION PLAN FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (REPORT 05000275/2020005 AND 05000323/2020005)
Dear Mr. Welsch:
The enclosed inspection plan lists the inspections scheduled through June 30, 2022, for Diablo Canyon Power Plant, Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC)
provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP), including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the May 28, 2020, memorandum, Inspection Guidance During Transition From COVID-19 Mandatory Telework (Agencywide Documents Access and Management System (ADAMS)
Accession Number ML20141L766). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance, but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.
Additionally, during this period the NRC will schedule an additional inspection per a revised version of Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ADAMS Accession Number ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1148 with any questions you have regarding this letter.
Sincerely, Digitally signed by Jeffrey Jeffrey Josey Josey Date: 2020.08.31 07:56:26-05'00'
Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82 Enclosure:
Inspection Plan cc w/ encl: Distribution via LISTSERV
ML20240A320 SUNSI Review Non-Sensitive Publicly Available
Sensitive Non-Publicly Available OFFICE SPE:DRP/A C:DRP/A NAME HFreeman JJosey SIGNATURE /RA/ /RA/
DATE 08/24/2020 08/25/2020
IP 22 Inspection Activity Plan Report 07200026 - Diablo Canyon (ISFSI)
07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Diablo Canyon ISFSI Routine Inspection (1 week in December) 2 1 11/15/2020 12/31/2020 IP 60857 001004 Review of 10 CFR 72.48 Evaluations 1 11/16/2020 12/31/2020 IP 60855 001001 Operation Of An ISFSI This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.
8/27/2020 8:14:51 AM
IP 22 Inspection Activity Plan Report Diablo Canyon 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Diablo Canyon Biennial PI&R Inspection 4 1, 2 07/19/2020 08/29/2020 IP 71152B 000747 Problem Identification and Resolution RS58 Radiation Safety - DC 4 1, 2 08/24/2020 08/28/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 08/24/2020 08/28/2020 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation MC&A - Material Control & Accounting - DC 1 1, 2 08/24/2020 08/28/2020 IP 71130.11 000742 Material Control and Accounting (MC&A)
EP Program Insp - DC 1 1, 2 09/14/2020 09/18/2020 IP 71114.02 000717 Alert and Notification System Testing 1, 2 09/14/2020 09/18/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 09/14/2020 09/18/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 09/14/2020 09/18/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 09/14/2020 09/18/2020 IP 71151 001397 Performance Indicator Verification Inservice Inspection 1RF22 - DC 1 1 10/05/2020 10/16/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RS13PI Radiation Safety 2 1, 2 10/19/2020 10/23/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/19/2020 10/23/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Security Protective Strategy .05 w/Exercise - DC 2 1, 2 11/16/2020 11/20/2020 IP 71130.05 000737 Protective Strategy Evaluation Security Access Control .02 - DC 1 1, 2 11/30/2020 12/04/2020 IP 71130.02 000734 Access Control 1, 2 11/30/2020 12/04/2020 IP 71130.09 001656 Security Plan Changes 1, 2 11/30/2020 12/04/2020 IP 71151 001338 Performance Indicator Verification Security Equipment .04 and Training .07 - DC 2 1, 2 11/30/2020 12/03/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 11/30/2020 12/03/2020 IP 71130.07 000739 Security Training This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.
8/27/2020 8:14:51 AM
IP 22 Inspection Activity Plan Report Diablo Canyon 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count DC 2021 INITIAL EXAM 8 1, 2 12/07/2020 12/11/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 01/24/2021 01/30/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
1, 2 01/31/2021 02/06/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
Fire Protection Inspection - DC 3 1, 2 01/25/2021 01/29/2021 IP 71111.21N.05 001646 DO NOT USE: Fire Protection Team Inspection (FPTI)
1, 2 02/08/2021 02/12/2021 IP 71111.21N.05 001646 DO NOT USE: Fire Protection Team Inspection (FPTI)
Cyber Security Inspection - DC 4 1, 2 02/22/2021 02/26/2021 IP 71130.10P 000741 Cyber Security 1, 2 03/08/2021 03/12/2021 IP 71130.10P 000741 Cyber Security RP 2,4 2 1, 2 03/01/2021 03/05/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/01/2021 03/05/2021 IP 71124.04 000728 Occupational Dose Assessment DC 2021 BRQ 3 1, 2 03/14/2021 03/20/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance TI 2515/194 - DC 1 1, 2 04/05/2021 04/09/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
Inservice Inspection 2RF22 - DC 1 2 04/26/2021 05/07/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP 1,2,PI 2 1, 2 05/03/2021 05/07/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 05/03/2021 05/07/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Security FFD .08 1 1, 2 06/21/2021 06/25/2021 IP 71130.08 000740 Fitness For Duty Program In-Office EP Exercise Scenario Rvw 71114.08 - DC 4 1, 2 07/01/2021 08/16/2021 IP 71114.08 000723 Exercise Evaluation Scenario Review This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.
8/27/2020 8:14:51 AM
IP 22 Inspection Activity Plan Report Diablo Canyon 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Design Bases Assurance (Program) 21N - Diablo Canyon 3 1, 2 07/26/2021 08/13/2021 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
EP Exercise & PI Inspection - DC 4 1, 2 09/13/2021 09/17/2021 IP 71114.01 000716 Exercise Evaluation 1, 2 09/13/2021 09/17/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 09/13/2021 09/17/2021 IP 71151 001397 Performance Indicator Verification RP 6,7 2 1, 2 09/20/2021 09/24/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 09/20/2021 09/24/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program Security Access Authorization .01 and Access Control .02 w/PIV 2 1, 2 10/04/2021 10/08/2021 IP 71130.01 000733 Access Authorization 1, 2 10/04/2021 10/08/2021 IP 71130.02 000734 Access Control 1, 2 10/04/2021 10/08/2021 IP 71130.09 001656 Security Plan Changes 1, 2 10/04/2021 10/08/2021 IP 71151 001338 Performance Indicator Verification Diablo Canyon 1, 2 - Heat Sink Performance (Triennial) 2 1, 2 10/18/2021 10/22/2021 IP 71111.07T 000700 Heat Sink Performance Inservice Inspection 1RF23 - DC 1 1 03/28/2022 04/08/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP 1,2,PI 2 1, 2 04/04/2022 04/08/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/04/2022 04/08/2022 IP 71124.02 000726 Occupational ALARA Planning and Controls DC 2022 INITIAL EXAM 4 1, 2 06/05/2022 06/11/2022 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.
8/27/2020 8:14:51 AM