March 1, 2017
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (REPORT 05000275/2016006 AND 05000323/2016006)
Dear Mr. Halpin:
On February 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Diablo Canyon Power Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Diablo Canyon Power Plant, Unit 1, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all Unit 1 related inspection findings had very low safety significance (i.e., Green), and all Unit 1 PIs were within the expected range (i.e., Green). However, the NRC determined the performance at Diablo Canyon Power Plant, Unit 2, during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRCs ROP Action Matrix.
This conclusion was based on a single, Unit 2-related inspection finding having low-to-moderate safety significance (i.e., White) in the Mitigating Systems Cornerstone originating in the third quarter of 2016, and all PIs within the expected range (i.e., Green). The NRC previously communicated the final significance determination associated with this finding, and the transition of Diablo Canyon Power Plant, Unit 2, to the Regulatory Response Column, in a letter to you dated December 28, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16363A429).
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 In a letter dated January 26, 2017, (ADAMS Accession No. ML17026A485), PG&E appealed the NRCs characterization of the aforementioned finding as having low-to-moderate safety significance (White). The NRC reviewed your appeal in accordance with NRC Inspection Manual Chapter 0609.02, Process for Appealing NRC Characterization of Inspection Findings (Significance Determination Process (SDP) Appeal Process). By letter dated February 28, 2017, (ADAMS Accession No. ML17059D758), the NRC concluded that PG&Es appeal did not have sufficient merit for review by the appeal process specified in IMC 0609.02.
Accordingly, the NRC concluded the single inspection finding of low-to-moderate safety significance (White) and related performance assessment documented in our December 28, 2016, letter that placed Diablo Canyon, Unit 2 in the Regulatory Response Column of the NRCs Action Matrix remains valid.
Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs. The objectives of the supplemental inspection are: (1) to assure that the root causes and contributing causes of significant performance issues are understood, (2) to independently assess and assure that the extent of condition and extent of cause of significant performance issues are identified, (3) to assure that corrective actions taken to address and preclude repetition of significant performance issues are prompt and effective, and (4) to assure that corrective plans direct prompt actions to effectively address and preclude repetition of significant performance issues. This inspection will be scheduled after you notify the NRC of your readiness for inspection.
The enclosed inspection plan lists the inspections scheduled through December 31, 2018.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/
Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at Diablo Canyon Power Plant, Units 1 and 2, to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Jeremy Groom at (817) 200-1148 with any questions you have regarding this letter.
Sincerely,
/RA R. Lantz for/
Troy W. Pruett, Director Division of Reactor Projects Docket Nos. 05000275, 05000323 License Nos. DPR-80, DPR-82 Enclosure:
Diablo Canyon Inspection/Activity Plan
SUNSI Review:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: RDA/dll Yes No Publicly Available Sensitive NRC-002 OFFICE C: DRP/A D:DRS D:DRP NAME JGroom AVegel TPruett SIGNATURE
/RA/
/RA JClark for/
/RA RLantz for/
DATE 2/28/17 3/1/17 3/1/17
Diablo Canyon Inspection / Activity Plan 01/01/2017 - 12/31/2018 Unit Number Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title Page 1 of 2 02/23/2017 11:46:07
BRQ
- BRQ INSPECTION 1, 2 04/03/2017 04/07/2017 IP 7111111B Licensed Operator Requalification Program
- RADIATION SAFETY 1, 2 05/08/2017 05/12/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/08/2017 05/12/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 05/08/2017 05/12/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences
- INSERVICE INSPECTION
05/08/2017 05/19/2017 IP 7111108P Inservice Inspection Activities - PWR
EB1-17T
- DC 50.59 CHANGES, TESTS, AND EXPERIMENTS 1, 2 06/19/2017 06/23/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
- RADIATION SAFETY 1, 2 07/31/2017 08/04/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 07/31/2017 08/04/2017 IP 71124.04 Occupational Dose Assessment
EXAM
- INITIAL EXAM
12/11/2017 12/15/2017 X02595 INITIAL EXAM DC U1 (10/2017)
12/11/2017 12/15/2017 X02596 INITIAL EXAM DC U2 (10/2017)
01/22/2018 02/05/2018 X02595 INITIAL EXAM DC U1 (10/2017)
01/22/2018 02/05/2018 X02596 INITIAL EXAM DC U2 (10/2017)
- BIENNIAL EP PROGRAM INSPECTION 1, 2 10/30/2017 11/03/2017 IP 7111402 Alert and Notification System Testing 1, 2 10/30/2017 11/03/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 10/30/2017 11/03/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 10/30/2017 11/03/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
- EP PERFORMANCE INDICATOR VERIFICATION 1, 2 10/30/2017 11/03/2017 IP 71151-EP01 Drill/Exercise Performance 1, 2 10/30/2017 11/03/2017 IP 71151-EP02 ERO Readiness 1, 2 10/30/2017 11/03/2017 IP 71151-EP03 Alert & Notification System Reliability
TI-191
- MITIGATING STRATEGIES/SFP INST FOR BDBEE 1, 2 11/13/2017 11/17/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012
RS 12PI
- RAD SAFETY 1, 2 02/12/2018 02/16/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/12/2018 02/16/2018 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Diablo Canyon Inspection / Activity Plan 01/01/2017 - 12/31/2018 Unit Number Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title Page 2 of 2 02/23/2017 11:46:07
RS 12PI
- RAD SAFETY 1, 2 02/12/2018 02/16/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 02/12/2018 02/16/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences
EB1-21N
- DC DESIGN BASES INSPECTION PROGRAMS 1, 2 06/11/2018 06/29/2018 IP 7111121N Component Design Bases Inspection (Programs)
- RAD SAFETY 1, 2 07/09/2018 07/13/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 07/09/2018 07/13/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/09/2018 07/13/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/09/2018 07/13/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
EB2-05XT
- TRIENNIAL FIRE PROTECTION INSPECTION 1, 2 10/15/2018 10/19/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)
1, 2 10/29/2018 11/02/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)
- EP EXERCISE INSPECTION 1, 2 10/22/2018 10/26/2018 IP 7111401 Exercise Evaluation 1, 2 10/22/2018 10/26/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 10/22/2018 10/26/2018 IP 71151-EP01 Drill/Exercise Performance 1, 2 10/22/2018 10/26/2018 IP 71151-EP02 ERO Readiness 1, 2 10/22/2018 10/26/2018 IP 71151-EP03 Alert & Notification System Reliability IP71114.07 is not required to be performed this inspection cycle.
Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.