(Pnp) - Summary of Telephone Conference Call Held on March 17, 2009, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association (NFPA) Standard 805 ...
ML090960148
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/17/2009
From: Mahesh Chawla
Plant Licensing Branch III
To:
Entergy Operations
Chawla M, NRR/DORL, 415-8371
References
Download: ML090960148 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 April 17, 2009 LICENSEE: Entergy Operations, Inc.

FACILITIES: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MARCH 17, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the U.S. Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee stated that all the tasks are on track and at present there are no significant barriers and no scope additions. Based on NRC staff recommendation, licensee added the "Start Date" column for all the tasks. The licensee is also going to add peer review as a milestone for Fire Probabilistic Risk Assessments and Internal Events. The licensee will submit an updated table prior to the status call next month. Enclosure 2 provides the list of all attendees.

Background

On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS)

Accession Number ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25, 2008 (ADAMS Accession Number ML083370155) made a commitment to conduct monthly teleconference with the NRC staff to discuss progress on the Palisades Nuclear Plant NFPA 805 transition activities.

Lll\Ave1/11J--

Mahesh Chawla, Project Manager Projects Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1. Table - Palisades NFPA 805 Project Milestones
2. Table - List of Attendees cc w/encls: Distribution via ListServ

3/1712009 Palisades NFPA 80S Project Milestones NEITask No.~

TIde Mihtstone Oa19' Status' Start Date Transltion of Nuclear Safety Performance Criteria Task 1: 04/1 0109 See Comments -

(NEI 04-02 Table B-2)

Fundamental Fire Protection Program S. Design Task 2: 07113109 On Track -

Elements TasK 3: Radioactive Release Transition 07/31109 See Comments 05:'07109 Nuclear Safety Ai1alysis Transition rask 4: 09130109 On Track -

I(NEI 04-02 Table B-3)

ST 4.1.1 Off-Site Power Cable Selection and Anal~s is 04101/09 See Comments -

ST 4.12 Other Power cabre Selection and Ai1alysis 03/15/09 Complete -

8T 41.3 SUbsequent Cable/Instrument Identification & Analysis TBD Added Scope starred Task 6. Internal Events PRA 02117.'10 On TracK -

ST6.2.1 Prepare LERF Model 07131/09 On Track -

ST6.2.2 Update Flooding Anaiysis 07/31/09 On Track -

ST63 Thermal HydrauliC Ai1alYSls for t'ASO/HRA 11116109 See Comments Task 7 Fire PRA 12/22/09 On Track -

ST 7.6.4 R3 Internal Events Model 04/01/09 On Track -

ST7.7 Quantification Risk Screening OE'/15/09 On Track starred ST78 Scoping for Fire Modeing 0711:5/09 Not Started 04/22/09 ST79i10 Circuit Failure 1\'lode Likelihood AJ1al}oSis 07/15/09 Not startec 0506!0~i 5T 7 12 Post Fire HRA 07/1 C,/OS! On Track started ST713 Seismic Fire Interaction Assessment 07/31109 Not StJI1ed 05/06109 5T 7.14 Fire RIsk OuanfJlicalion 09/15/09 Not Started 07/31/09 5T 7.15 Uncertainty and Sens ItiVityAi1alysis 09/15,109 On Track starred Task 8 NFPA 805 cnanpe Evaluations 02/01110 On Track starred ST8.1 Change Evaluations 12/01JD9 On Track starred 5T 82 Non-Compliance Risk Evaluations 12:'01 l09 Not Started 09110109 Palisades tvfapping of Post Transition Procedures &

Task 9: 01/08110 Not sianeo 11/02/09 Document ReVISIOns Task 10: Translbon Report 0311 gll 0 Not Started 08:'31/09

'raskn: License An1endment Request iLAR) 03119/10 Not Started t 0/20,109 r,lotes

~ The oogH'aJ milestone dateB oer sch-ed"'Jle PLP .g05 51~3 W'IFC Sd"edlie 12NO"/iJ6 and (He $ubjec;~ 10 change l1"e curreru scneou-e :"6:5 53* 7Q Schedule 02'r..'.A,ROYl 681fS were ... <l11*ja1ed to be on or before these dates. 'JJ11esSo ,:,thel'W'-s~ rotec l 'Cfl Track" means thal the ~a~k current aercent aqe cornp1ett!'dIS ~ the ecoected ccenp.eton pe"rcel'!t aJxl the eJ;::;lected C~lp:etoo date fer ~"'e task is proiecred to be met.

Start dates prov-oeo are estimates and 1)1,s}' vart con1ioqent ,-,p:-npredecessor comoieHon -3f1d av -aial;tle rez-:.urce$ at tt)..l t orie. E', er, If thiS start Comments:

Task 1. TM draft B-2 Table has cesn provided anc is currently under ce~'iew at "'alisaces and Is takjng longer thai, ongi nally anticipated Task J MHeslone date moved \0 07,'31109 in on enorno have FAQ 0£I.{)O:,6 time to dimosllon !Jefore tile work on thist3~ IS corlpl lIed to nl1niml=e re',,"o/1<.

~: Cables have been identified wtllch Jre not in the s ts data\lase and/or 00 not have the room and fire area infom1.1tiop identified These are Ileing evaluated Preiimii1a r'i dlS)oSltlcn indicates;hese open cauls iSSJeswill have MInimal to no .rnoact on the overall project WMe these cabtes are Ileir,g e',aluated. work continues 111 Darallel on the PR~ model as'3.lming wors case callie locations bared on some raceway generalizat,Ons.

Task 6.3 MlleslOne ,jate extended as the current MSO scope isiq)Q\~1'" but add/tiaral Issues may anss. Mall1tainJOg open and tie 10 Peer ReVIew Enclosure 1

TELEPHONE CONFERENCE CALL ON NFPA 805 TRANSITION PROGRESS BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC.

LIST OF PARTICIPANTS MARCH 17,2009 PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Mahesh Chawla Proiect Manaaer HEADQUARTERS Alex Klein Branch Chief Paul Lain Senior Fire Protection Enaineer

.lohn Ell Senior Hesident In REGION 3 Alan Dahbur Electrical Enaineer ENTERGY Laurie Lahti Licensina Manaaer PALISADES NUCLEAR PLANT Alan Blind Actina Enaineerina Director Tom Swiecicki Fire Protection (FP) Enaineer Brian Brogan Probabilistic Safety Assessment (PSA)

Enaineer Frank Yanik PSA Enaineer Bob VanWaaner Proarams Enaineerina Manaaer Roger Stobert Contractor Enclosure 2

April 17, 2009 LICENSEE: Entergy Operations, Inc.

FACILITIES: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MARCH 17, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representative of Entergy Nuclear Operations, Inc. (ENO) and the U.S. Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee stated that all the tasks are on track and at present there are no significant barriers and no scope additions. Based on NRC staff recommendation, licensee added the "Start Date" column for all the tasks. The licensee is also going to add peer review as a milestone for Fire Probabilistic Risk Assessments and Internal Events. The licensee will submit an updated table prior to the status call next month. Enclosure 2 provides the list of all attendees.

Background

On December 9,2008 (Agencywide Documents Access and Management System (ADAMS)

Accession Number ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25, 2008 (ADAMS Accession Number ML083370155) made a commitment to conduct monthly teleconference with the NRC staff to discuss progress on the Palisades Nuclear Plant NFPA 805 transition activities.

I RAJ Mahesh Chawla, Project Manager Projects Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1. Table - Palisades NFPA 805 Project Milestones
2. Table - List of Attendees cc w/encls: Distribution via ListServ Distribution:

PUBLIC LPL3-1 r/f RidsAcrsAcnw_MailCTR Resource RidsNrrDorLpl3-1 Resource RidsNrrPMPalisades RidsNrrLABTully Resource RidsOgrRp Resource C. Tucci, NRR A. Klein, NRR P. Lain, NRR S. Campbell, EDO Rill Rgn3MailCenter Resource M. Vaaler, NRR T. Taylor, Rill J. Geissner, Rill J. Ellegood, Rill H. Barrett, NRR ADAMS Accession No'.. ML090960148 NRR-106 OFFICE LPL3-1/PM LPL3*1/LA DRNAFPB/BC LPL3-1/BC NAME MChawia BTuily AKlein /PLain for LJames fTWengert for DATE 04/16109 04/16/09 04/16/09 04/17109 OFFICIAL RECORD COpy