UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 15, 2009 LICENSEE: Entergy Operations, Inc.

FACILITIES: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON APRIL 23, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee stated that all the tasks are on track and at present there are no significant barriers and no scope additions. Enclosure 2 provides the list of all attendees.

Background

On December 9,2008 (Agencywide Documents Access and Management System (ADAMS)

Accession Number ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25, 2008 (ADAMS Accession Number ML083370155) made a commitment to conduct monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.

Sincerely, Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via ListServ

412312009 Palisades NFPA 805 Project Milestones NEt Task Milestone Start Title Status' No. Date' Date rransmon of Nuclear Safety Performance Cnterta See Task 1: OS/29/09 liNEI 04-02 Table 8*2) Comments Fundamental Fire Protection Program & Design Task 2: 07/13109 On Track Elements Task 3: RadioactiveRelease Transition 07/31109 Not Started 05/07109 Nuclear Safety Analysis Transition Task 4: 09':30109 On Track -

'NEI 04*02 Table 6-3i See ST 4.11 Off-Site Pov.'er Cable Selection and ,-\nal'lSls C7/15lO9 Comments ST 4.1 2 Other Power Cable selecnon and Analysis 03115109 Complete ST 4.13 Subsequent Cable/lnstrument lnoentnlcation & ,""nalysis 09111109 On Track Non-Power oceraronai Modes Transition See Task 5: 09/29109 (NEI 04*02 Tal)le F-ll Comments Task 6 tnterna Events PRA 02/17110 On Track ST 6.2 t Preoars LERF Model 07131.'09 On Track ST 6.2 2 update Flooding Analysis 07131109 On Track I

STI3,3 Thermal HydraUlic Analysis for MSO/HRA 11':16/09 On Track ST64 Intemal Events PRA Peer Review 10/30/09 Not Started 10,/26109 Task 7: Fire PRA 12122109 On Track See ST 7.6.4 R3 Internal Events Model C5/0HD9 Comments See .

ST 7.7 Quantification Risk Screening 08121/09 Comments ST 7.8 Scoping for Fire Modeling 07115109 On Track started ST 79110 CirCUIT Failure Mode Likelihood ,:"nalysis 07/15109 Not Started 05106i09 ST 7.12 Post Fire HRA 07115109 On Track ST 713 Seismic Fire Interaction Assessment 07/31/09 On Track sranec ST 7.14 Fire Risk ouannncauoo 09/15/09 Not Started 07131109 ST 7.15 Uncertainly and Sensitivity .4,naly'sis 09/15/09 On Track ST 7.17 Fire PRA Peer Review 01/22110 Not Started 01118{1O Task 8: NFP.:" B05 ChanQe Evaluations 02/01/10 On Track ST B.l Change Evaluations 12/01/09 On Track

$T B.2 Non-ComplianceRisk Evaluanons 12/01/09 Not StJrted 09110m9 Pajisades Mappmgof Post Translticn Procedures s Task 9: 01/0B/l0 Not Started 11102109 Document Revisons Task 10 Transition Reoort 03/18/10 Not Started 08l31l09 Task 11 License Amendment Request (L4,R) 0311 9/10 Not Started 10!20m9

iQ!!!:

"TMQ,P9IrJI Tlin~orf *;1Jloei per 6;hi1Ule F~P 9C'~ ~1'~' 'A':F~  :*cr:!<jt.:"t '2~~CV:le ,lr,j lYe iJtlJE~110 <:!'1Jn;~ nf cs-re-: i::r':!<1UtE-leO~ S,~*5- y 13,,::IR,OS\ Gill:'" ~t v31lt;.,lttd:o t-e '4  :;~ terore l1e6e alJ1eiJnl!U Ot!'!'I!r'W16E' 101fC

J *'01'1 TrJ;Cl' '111far!o trJt t,e ':J:6,lCJ'ifo*"t ~':;inta9f canp~:rj ,& -.: -r-e~'q:etted c:.rn p:'-ellor pE1"Cl:nl 31d t"!e ,npect!d o::mpl.t110'1 e.:ate for lne :aik '$

prO~C:f'~ 10 be Mel J sta-t Ijal.et erovroel )IE' es:rr. J:ei aI',,", r~3:~< IJ;.lI)' con~n9i'!l1 -Jpor"~QE>Cti&or comple'l101 1,'0 .lY~lll.l.tlIE- re&CfJrCEof a~ ~!'!,:Jt tmf :;'ien it nil &t.art C:J:f '"

Jdti,l~te:, &E ::Q!T;i~lJOr Oite tl &01e)lpeelt1d:c. te rt'f"t Jr\en 'ndiC3tl!'::1 ,~tr~l~f Comme~ts:

Task 1~ 'The maR.B-2 Tebte reY1~ and co'Tmen,1OOnh'lUH which is ~~ing i.o'lQ'=( than cr'QiraYy ricipat'!d.

ST 4.1.1: W'r'V/iRi h tY~g;r"'.:i1 idPnltfted scooe ha,5 ~e@ll flna}"iZlfo, p'it:Ciog the fnforTN~iCf'\ i~ the databese i'!l CeJrtg e:o:toE<')ttEd d>J. to resource t,mito1~on5.

Task 5' Q\¥n~rs ~*ti:ew 1'5 icem.1ying addit"Cra'ccmponer.l~ 10 be \no:;upOf"ated lto trof> cabie 5e'ectoo ar-d enalys-s.

51 1.6.4: The first """i"" oft"" R3 PRA Medel,. ccropete Enclosure 1

TELEPHONE CONFERENCE CALL ON NFPA 805 TRANSITION PROGRESS BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC.

LIST OF PARTICIPANTS APRIL 23, 2009 PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC)

I Mahesh Chawla Project Manager HEADQUARTERS Alex Klein Branch Chief Harold Barrett Senior Fire Protection Engineer John Ellegood Senior Resident Engineer REGION 3 Alan Dahbur Electrical Engineer ENTERGY Terry Davis Acting Licensing Manager PALISADES NUCLEAR PLANT Barbara Dotson Licensing Specialist Alan Blind Acting Engineering Director Tom Swiecicki Fire Protection (FP) Engineer I Frank Yanik Probabilistic Safety Assessment (PSA)

Senior Engineer Bob VanWagner Programs Engineering Manager Chaur Nan Yeh Entergy Corporate PRA Supervisor Roger Stobert Nexus Engineering - Contractor Enclosure 2

May 15, 2009 LICENSEE: Entergy Operations, Inc.

FACILITIES: Palisades Nuclear Plant SUB"IECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON APRIL 23, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee stated that all the tasks are on track and at present there are no significant barriers and no scope additions. Enclosure 2 provides the list of all attendees.

Background

On December 9,2008 (Agencywide Documents Access and Management System (ADAMS)

Accession Number ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25,2008 (ADAMS Accession Number ML083370155) made a commitment to conduct monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.

Sincerely, IRAJ Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via ListServ Distribution:

PUBLIC LPL3-1 rlf RidsRgn3MailCenter A. Klein, NRR J. Geissner, Rill RidsNrrDorLpl3-1 Resource RidsOgcRp Resource M. Vaaler, NRR T. Taylor, Rill RidsNrrPMPalisades Resource S. Campbell, EDO Rill P. Lain, NRR H. Barrett, NRR RidsNrrLABTully Resource JEliegood, Rill RidsAcrsAcnw_MailCTR ADAMS Accession No'.. ML091250497 OFFICE LPL3-1/PM LPL3-1/LA DRNAFPB/BC LPL3-1/BC NAME MChawla BTuily AKlein LJames IP. Tam for DATE 05/15/09 05/08/09 05/15/09 05/15/09 OFFICIAL RECORD COpy