LICENSEE:

FACILITY:

SUBJECT:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 28, 2013 ENTERGY NUCLEAR OPERATIONS, INC.

PALISADES NUCLEAR PLANT

SUMMARY

OF OCTOBER 9, 2013, PRE-APPLICATION TELECONFERENCE MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC., TO DISCUSS A FORTHCOMING PALISADES EQUIVALENT MARGIN ANALYSIS SUBMITTAL (TAC NO. MF2744)

On October 9, 2013, a Category 1 public teleconference meeting was heid between the U.S.

Nuclear Regulatory Commission (NRC) and representatives of Entergy Nuclear Operations, Inc.

(ENO), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.

The purpose of the meeting was to discuss a forthcoming Equivalent Margin Analysis (EMA) submittal at Palisades Nuclear Plant (PNP). A list of attendees is provided as Enclosure 1.

Prior to the meeting, the licensee had submitted the slides for their presentation entitled "NRC and Palisades Pre-Submittar Conference, Appendix G Equivalent Margin Analysis Submittal" dated October 9, 2013 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML13262A449). During the meeting, the licensee's presentation provided an overview of the EMA project at Palisades. The licensee discussed with the NRC staff, the overview of the Palisades plant EMA, the current condition of the reactor vessel, and Palisades'

  • commitment to meet the three year timeline required for the project.

The licensee plans to submit the license amendment request by November 2013. The NRC staff provided the licensee necessary information required for the acceptance review and the goal of minimizing the need for requesting additional information. The licensee adequately responded to the staff's questions and provided the necessary information and clarifications.

There were members of the public who joined the meeting via teleconference, however; members of the public did not ask any questions or provide comment. Please direct any inquiries to me at 301-415-8371, or Mahesh.Chawla@nrc.gov.

Docket No. 50-255

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

LIST OF ATTENDEES OCTOBER 9, 2013, PRE-APPLICATION MEETING WITH ENO TO DISCUSS EQUIVALENT MARGIN ANALYSIS FOR PALISADES NUCLEAR PLANT NAME ORGANIZATION TITLE NUCLEAR REGULATORY COMMISSION STAFF Mahesh Chawla NRR/DORL Project Manager Joel Jenkins NRR/DE/EVIB Materials Engineer Simon Sheng NRR/DE/EVIB Senior Materials Engineer Jeff Poehler NRR/DE/EVIB Senior Materials Engineer Carolyn Fairbanks NRR/DE/EVIB Senior Materials Engineer Mel Holmberg REGION 3 Senior Inspector DORL - Division of Operator Reactor Licensing DE - Division of Engineering EVIB-Vessels and Internals Integrity Branch ENTERGY REPRESENTATIVES Jeff Erickson Entergy Palisades Licensing Engineer Dan Depuydt Entergy Palisades Design Engineer Keith Smith Entergy Palisades Project Manager Lindsay Rose Entergy Palisades Communications Specialist Elliot Long Westinghouse Principal Engineer Charlie Meyer Westinghouse Senior Project Manager Chuck Tomes Dominion Engineering Consultant MEMBERS OF PUBLIC Wayne Polomcak Van Buren County Sheriff's Sergeant Office Alain Svilpe Van Buren County Sheriff's Lieutenant Office Tim Hardin Electric Power Research Institute Senior Project Manager Lindsey Smith Michigan Radio Reporter

\\

Enclosure

Meeting Notice: ML13261A228 OFFICE LPL3-1/PM NAME MChawla DATE 10/28/13 RidsNrrLAMHenderson Resource RidsOgcMaiiCenter Resource RidsRgn3MaiiCenter Resource NSanfilippo, EDO Region 3 s