Summary of Public Teleconference Call with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Relocate Surveillance Frequencies to Licensee Control
ML18268A280
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/26/2018
From: Kimberly Green
Plant Licensing Branch III
To:
Entergy Nuclear Operations
Green, K 415-1627
References
EPID L-2018-LRM-0057
Download: ML18268A280 (4)


Text

LICENSEES:

Entergy Nuclear Operations, Inc.

FACILITIES:

Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF SEPTEMBER 20, 2018, PUBLIC TELECONFERENCE CALL WITH ENTERGY NUCLEAR OPERATIONS, INC., REGARDING UPCOMING LICENSE AMENDMENT REQUEST TO RELOCATE SURVEILLANCE FREQUENCIES TO LICENSEE CONTROL (EPID L-2018-LRM-0057)

On September 20, 2018, a Category 1 public teleconference call was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc. (ENO, the licensee). The purpose of the call was to discuss a proposed license amendment request (LAR) to relocate surveillance requirement (SR) frequencies from the technical specifications (TSs) to licensee control for the Palisades Nuclear Plant (PNP).

The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML18255A013. The meeting notice is also posted on the NRC public website. The licensee's presentation is available at ADAMS Accession No. ML18257A102.

Entergy stated that it plans to submit an LAR to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative Sb," which-will allow specific PNP TS SR frequencies to be relocated to a surveillance frequency control program. The new SFCP will be added to TS Section 5, "Administrative Controls." The LAR will be consistent with the TSTF-425 model application and will consist of a cover letter and seven attachments. The submittal will include four tables that compare the TSTF-425 to the PNP TSs. Entergy described a few of the PNP variations from TSTF-425.

Entergy briefly discussed its probabilistic risk assessment (PRA) adequacy. According to Entergy, the PNP PRA is compliant with Regulatory Guide 1.200, Revision 2, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," and American Society for Mechanical Engineers/American Nuclear Society PRA standard RA-Sa-2009, "Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications." It also meets NEI 04-10, "Risk-Informed Technical Specifications Initiative Sb, Risk-Informed Method for Control of Surveillance Frequencies," requirements for a risk-informed TS frequency change program.

Palisades currently has an internal events PRA model, which was revised and issued in 2017, an internal flooding PRA model, and an internal fire PRA model. Entergy summarized a 2010 peer review of its internal events PRA. The 14 internal events findings that remain open after peer and closure reviews will be presented in the LAR along with a discussion of any potential impact on the LAR. Entergy stated that none of the resolutions to the findings and observations were considered to be "upgrades." Entergy indicated that one plant change, related to instrument air, that has not yet been implemented may potentially impact the PNP PRA.

Entergy also stated that signicant medications related to the implementation of National Fire Protection Association (NFPA) 805, "Performance-Based Standard for Fire Pro-tection for Light Water Reactor Electric Generating Plants," will be installed during the refueling outage (RFO) scheduled for this fall, and others will be installed during a later RFO. In response to an NRC staff question, Entergy stated that the staff will be able to discern which modifications are credited in the PRA and which are not. The NRC staff also questioned if the fire PRA will reflect the as-built/as-installed configuration. Entergy replied affirmatively, and that it has performed a sensitivity study to show the impact of medications that have not yet been implemented. The NRC staff suggested that a statement in the LAR about how Entergy treated external events would be beneficial.

Entergy plans to submit the LAR by the end of September 2018, and will request approval by September 30, 2019, with a 90-day implementation period.

The public was invited to listen to the call and was given an opportunity to communicate with the NRC after the business portion, but before the call was ended. Members of the public were present on the call; however, no comments were made to the NRC staff.

No regulatory decisions or commitments were made during the meeting. No public meeting feedback forms were received.

A list of meeting attendees is enclosed.

Please direct any inquiries to me at 301-415-1627, or Kimberly.Green@nrc.gov.

Docket No. 50-255

Enclosure:

List of Attendees cc: Listserv t<~~

Kimberly J. Green, Senior Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

LIST OF ATTENDEES SEPTEMBER 20, 2018, PUBLIC TELECONFERENCE CALL WITH ENTERGY NUCLEAR OPERATIONS, INC.

PALISADES NUCLEAR PLANT NAME ORGANIZATION Kim Green NRC/NRR/DORL Joel Wiebe NRC/NRR/DORL Mihaela Biro NRC/NRR/DRA Adrienne Brown NRC/NRR/DRA Terrence Brimfield NRC/NRR/DSS Vijay Goel NRG/Region Ill Paul LaFlamme NRG/Region Ill Julie Boettcher NRG/Region Ill Jim Miksa Entergy/Palisades Jeff Erickson Entergy/Palisades Jeff Hardy Entergy/Palisades Bob White Entergy/Palisades Steve Mongeau Entergy/Palisades Jana Bergman Curtiss-Wright Enclosure

Package:ML18268A316 Meeting Notice ML18255A013 Slides ML18257A102 s ummary ML18268A280 OFFICE N RR/D0RL/LPL3/PM NAME KGreen DATE 9/26/18 NRR/D0RL/LPL3/LA NRR/D0RL/LPL3 JRohrer DWrona 9/26/18 9/26/18