Other: ML060890398, ML060950574, ML073511698, ML081200606, ML081790538, ML090980515, ML092080216, ML092440479, ML100190011, NRC 2009-0113, Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4705/4706), NRC 2011-0010, Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
|
MONTHYEARML0515202022005-06-0202 June 2005 6/2/05, Turkey Point, RAI, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0515201832005-06-0202 June 2005 Request for Additional Information, Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. Project stage: RAI ML0515202272005-06-0303 June 2005 6/3/05, Seabrook, RAI, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0603703962006-02-0808 February 2006 RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0603704382006-02-0808 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-basis Accidents at Pressurized-water Reactors Project stage: RAI ML0603801332006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0603704912006-02-0909 February 2006 RAI - Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0608903982006-04-11011 April 2006 Requested Extension of Completion Schedule for NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Other ML0609505742006-04-13013 April 2006 Approval of GSI-191/GL 2004-02 Extension Request Project stage: Other NRC 2007-0085, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2007-11-16016 November 2007 Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request L-2007-155, Request for Extension of Completion Date of the Generic Letter 2004-02 Actions2007-12-0707 December 2007 Request for Extension of Completion Date of the Generic Letter 2004-02 Actions Project stage: Request ML0735116982007-12-20020 December 2007 GSI-191/GL 2004-02 Extension Request Approval (Tac No. MC4705/4706) Project stage: Other L-2008-030, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-02-27027 February 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request L-2008-033, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.2008-02-28028 February 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Request L-2008-073, NRC Generic Letter 2004-02 Request for an Extension to the Completion Date for Ex-Vessel Downstream Effects Evaluations2008-04-14014 April 2008 NRC Generic Letter 2004-02 Request for an Extension to the Completion Date for Ex-Vessel Downstream Effects Evaluations Project stage: Request ML0812006062008-04-29029 April 2008 Approval of Extension Request for GL 2004-02 Project stage: Other NRC 2008-0038, Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-06-0909 June 2008 Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request L-2008-137, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.2008-06-30030 June 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Request L-2008-138, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.2008-06-30030 June 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Request ML0817905382008-07-0101 July 2008 Generic Safety Issue 191/Generic Letter 2004-02, Additional Extension Request Approval Project stage: Other ML0826106902008-09-17017 September 2008 Request for Additional Information Related to GL 2004-02 Project stage: RAI ML0826107052008-09-17017 September 2008 Request for Additional Information (RAI) Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors Project stage: RAI ML0834400782008-12-19019 December 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Request for Additional Information Project stage: RAI ML0833806712008-12-22022 December 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Request for Additional Information (TAC Mc 4725) Project stage: RAI ML0833001732009-01-0707 January 2009 GSI-191/GL 2004-02 Request for Additional Information Project stage: RAI ML0836589782009-01-16016 January 2009 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Request for Additional Information Project stage: RAI ML0835800232009-01-22022 January 2009 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Request for Additional Information Project stage: RAI L-2009-063, Response to NRC Request for Additional Information Regarding the Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2009-03-19019 March 2009 Response to NRC Request for Additional Information Regarding the Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Response to RAI L-2009-062, Response to NRC Request for Additional Information Regarding the Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.2009-03-19019 March 2009 Response to NRC Request for Additional Information Regarding the Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Response to RAI NRC 2009-0033, Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2009-04-0707 April 2009 Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI ML0909805152009-04-0808 April 2009 SONGS - GSI-191 Chemical Effects Project stage: Other L-2009-084, Response to Nrc'S Request for Additional Information2009-04-22022 April 2009 Response to Nrc'S Request for Additional Information Project stage: Request NRC 2009-0053, Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706)2009-06-12012 June 2009 Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706) Project stage: Request NRC 2009-0059, Response to Request for Additional Information GSI-I91/GL 2004-02 Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2009-06-29029 June 2009 Response to Request for Additional Information GSI-I91/GL 2004-02 Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI ML0920802162009-07-27027 July 2009 Notice of Forthcoming Conference Call with Florida Power and Light Concerning Turkey Point Generic Letter 2004-02 Response Project stage: Other L-2009-180, Responses to Nrc'S Request for Additional Information on Generic Letter 2004-02 Supplemental Responses, Dated 02/27/2008 and 06/30/20082009-07-30030 July 2009 Responses to Nrc'S Request for Additional Information on Generic Letter 2004-02 Supplemental Responses, Dated 02/27/2008 and 06/30/2008 Project stage: Supplement NRC 2009-0077, Response to Request for Additional Information GSI-191/GL 2004-02 (TACs MC4705/4706) Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2009-07-31031 July 2009 Response to Request for Additional Information GSI-191/GL 2004-02 (TACs MC4705/4706) Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI ML0924404792009-09-11011 September 2009 Summary of Conference Call with Florida Power & Light, to Discuss Generic Letter 2004-02, Potential Impact of Debris Blackage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactor, Responses Project stage: Other NRC 2009-0113, Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4705/4706)2009-10-27027 October 2009 Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4705/4706) Project stage: Other ML1001900112010-01-19019 January 2010 Notice of Conference Call with Florida Power & Light Concerning Turkey Point Generic Letter 2004-02 Response Project stage: Other ML1003512132010-02-18018 February 2010 Request for Additional Information Regarding GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML1009700022010-04-0909 April 2010 Request for Additional Information, Regarding GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI NRC 2010-0046, Supplemental Response for Extension Request for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation Durian Design Basis Accidents at Pressurized-Water Reactors2010-06-11011 June 2010 Supplemental Response for Extension Request for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation Durian Design Basis Accidents at Pressurized-Water Reactors Project stage: Supplement ML1019405202010-07-14014 July 2010 Notice of Conference Call with Florida Power and Light Company to Discuss Draft Responses to NRC Requests for Additional Information for Generic Letter 2004-02 Project stage: Draft RAI ML1007407182010-07-28028 July 2010 February 3, 2010, Turkey Point, Unit 3 & 4, Summary of Meeting with Florida Power & Light, on Generic Letter 2004-02 Project stage: Meeting L-2010-205, Responses to Nrc'S Request for Additional Information Dated Feb. 18, 2010 Re Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2010-09-17017 September 2010 Responses to Nrc'S Request for Additional Information Dated Feb. 18, 2010 Re Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML1009903062010-09-22022 September 2010 Request for Additional Information Regarding GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML1025902742010-12-17017 December 2010 Summary of Teleconference Meeting with Florida Power & Light Company, on Generic Letter 2004-02 Project stage: Meeting NRC 2011-0010, Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2011-02-0404 February 2011 Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML1103502052011-02-0404 February 2011 Forthcoming Public Teleconference with NextEra Energy Seabrook, LLC, to Discuss Planned Testing for Seabrook Specific Erosion Project stage: Request 2009-01-07
[Table View] |
|
---|
Category:Letter
MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 ML23208A2262023-08-28028 August 2023 Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval ML23171B1062023-06-21021 June 2023 Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 ML23114A1222023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications 2024-02-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 ML23136A2802023-05-0505 May 2023 SLRA Second Annual Update RAI Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23033A0292023-01-31031 January 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 ML23003A8022023-01-0303 January 2023 Notification of NRC Baseline Inspection and Request for Information ML22354A1612022-12-20020 December 2022 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22266A0872022-09-23023 September 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22172A1192022-06-27027 June 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-505 Provide Risk Informed Extended Complete Times - RITSTF Initiative 4B ML22130A5712022-05-12012 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22041B0752022-02-10010 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000266/2022002 ML21362A6812021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final ML21362A6822021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final Email ML21362A6712021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final Email ML21362A6702021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final ML21287A0852021-10-14014 October 2021 SLRA Safety RAI Set 11 Final Email ML21286A6032021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final Email ML21286A6042021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final ML21287A0862021-09-29029 September 2021 SLRA Safety RAI Set 11 Final ML21273A0222021-09-29029 September 2021 SLRA Safety RAI Set 9 Final ML21253A1672021-09-10010 September 2021 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000266/2022010 05000301/2022010 ML21242A2282021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 ML21242A2292021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 Email ML21242A2472021-08-26026 August 2021 SLRA Safety RAIs Set 8 Final ML21242A2232021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 Email ML21242A2222021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 ML21242A2192021-08-20020 August 2021 SLRA Safety RAI Set 7 Final Email ML21242A2202021-08-20020 August 2021 SLRA Safety RAI Set 7 Final ML21242A2132021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft Email ML21242A2142021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft ML21242A2032021-08-12012 August 2021 Srla Safety RAIs Set 5 Final ML21242A2382021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final Email ML21242A2392021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final ML21242A2042021-08-12012 August 2021 SLRA Safety RAIs Set 5 Final Email ML21242A0152021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final ML21242A0122021-08-0909 August 2021 SLRA Draft Safety RAIs Set 6 ML21242A1992021-08-0505 August 2021 Srla Draft Safety RAIs Set 5 ML21242A2002021-08-0505 August 2021 SLRA Draft Safety RAIs Set 5 Email ML21285A1212021-08-0505 August 2021 SLRA Public Meeting Discussion Questions August 5 2021 ML21238A2332021-08-0404 August 2021 SLRA Safety RAI Set 4 Final ML21238A2322021-08-0404 August 2021 SLRA Safety RAI Set 4 Final Email ML21237A0062021-08-0202 August 2021 SLRA Draft Safety RAIs Set 4 ML21214A0842021-07-27027 July 2021 SLRA Safety RAIs Set 3 Final ML21208A1892021-07-27027 July 2021 SLRA Safety RAIs Set 2 Final ML21172A2382021-07-21021 July 2021 (Pbn) Subsequent License Renewal Application (SLRA) Draft Requests for Additional Information (Rais) Safety - Set 2 ML21214A0722021-07-20020 July 2021 Subsequent License Renewal Application Draft Safety RAIs Set 3 ML21161A1192021-06-10010 June 2021 RAIs Set 1 Final Aging Management of Irradiated Concrete and Steel Reactor Vessel Supports Final ML21134A0582021-05-14014 May 2021 Final Request for Additional Information and Requests for Confirmation of Information - Point Beach SLRA Environmental Review (EPID No. L-2020-SLE-0002) - Email 2024-01-30
[Table view] |
Text
\-~"'~ Rf G U(
,," "'1'
.,"'~" ".C?:P... UNITED STATES
- ! ('l
~
~
~
- 0 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 V"." ~
"'<? ~O January 7, 2009
Mr. Larry Meyer Site Vice President FPLE Point Beach 6610 Nuclear Road Two Rivers, WI 54241 SUB~IECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - GSI-191/GL 2004-02 REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC4705/4706)
Dear Mr. Meyer:
By letters dated February 29,2008 and June 9,2008 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML080630613 and ML081620337), FPL Energy (the licensee) submitted a supplemental response to Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors," for the Point Beach Nuclear Plant.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittals.
The process involved detailed review by a team of approximately 10 subject matter experts, with a focus on the review areas described in the NRC's "Content Guide for Generic Letter 2004-02 Supplemental Responses" (ADAMS Accession No. ML073110389). Based on these reviews, the staff has determined that additional information is needed in order to conclude there is reasonable assurance that GL 2004-02 has been satisfactorily addressed for the Point Beach Nuclear Plant. The enclosed document describes these requests for additional information (RAls).
The NRC requests that the licensee respond to these RAls within 90 days of the date of this letter. However, the NRC would like to receive only one response letter for all RAls with exceptions stated below. If the licensee concludes that more than 90 days are required to respond to the RAls, the licensee should request additional time, including a basis for why the extension is needed.
If the licensee concludes, based on its review of the RAls, that additional corrective actions are needed for GL 2004-02, the licensee should request additional time to complete such corrective actions as needed. Criteria for such extension requests are contained in SECY-06-0078 (ADAMS Accession No. ML053620174), and examples of previous requests and approvals can be found on the NRC's sump performance website, located at:
http://www.nrc.gov/reactors/operating/ops-experience/pwr-sump-performance.html.
Any extension request should also include results of contingency planning that will result in near term identification and implementation of any and all modifications needed to fully address GL 2004-02. The NRC strongly suggests that the licensee discuss such plans with the staff before formally transmitting an extension request.
The exceptions to the above response time line are RAls 4-12 and RAI 20 in the enclosure.
Because the final head loss and vortexing evaluation has not yet been transmitted to the NRC, the head loss and vortexing-related topics in RAls 4-12 should be addressed in a supplemental response that provides the evaluation results. The supplemental response for RAls 4-12 should be submitted no later than the June 30, 2009.
L. Meyer -2 The I\lRC staff considers in-vessel downstream effects, discussed in RAI 20, to not be fully addressed at the Point Beach Nuclear Plant, as well as at other pressurized-water reactors.
The licensee's submittal refers to draft WCAP-16793-NP, "Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid." At this time, the NRC staff has not issued a final safety evaluation (SE) for WCAP-16793.
The licensee may demonstrate that in-vessel downstream effects issues are resolved for the Point Beach Nuclear Plant, by showing that the licensee's plant conditions are bounded by the final WCAP-16793 and the corresponding final NRC staff SE, and by addressing the conditions and limitations in the final SE. The licensee may also resolve RAI 20 by demonstrating, without reference to WCAP-16793 or the NRC staff SE, that in-vessel downstream effects have been addressed at the Point Beach Nuclear Plant. The specific issues raised in RAI 20 should be addressed regardless of the approach the licensee chooses to take.
The licensee should report how it has addressed the in-vessel downstream effects issue and the associated RAI referenced above within 90 days of issuance of the final NRC staff SE on WCAP-16793. The NRC staff is currently developing a Regulatory Issue Summary to inform licensees of the staff's expectations and plans regarding resolution of this remaining aspect of Generic Safety Issue 191, "Assessment of Debris Accumulation on PWR Sump Performance."
If you have any questions, please contact me at (301) 415-1424.
<~i~,~~~¥r-).. .r:
(~f'~
~'/~~stin Poole, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
As stated cc w/encl: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION (RAJ)
REGARDING SUPPLEMENTAL Responses TO GENERIC LETTER (GL) 2004*02
- 1. Please provide the insulation material(s) for the reactor vessel. Please state whether the debris quantities generated by breaks at reactor vessel nozzles that reach the strainer are bounded by the debris that transports from other breaks that have already been evaluated. If the debris quantities from previously breaks are not bounding, please evaluate the effects of the reactor vessel nozzle break on strainer head loss.
- 2. Please provide the information concerning the debris characteristics analysis that was requested in the U.S. Nuclear Regulatory Commission (NRC) staff revised content guide.
- 3. Please provide the information concerning the debris transport analysis that was requested in the NRC staff revised content guide.
Because the licensee's final head loss and vortexing evaluation has not yet been transmitted to the NRC, the following head loss and vortexing-related topics (numbers 4 - 12 below) should be addressed in a supplemental response, no later than June 30, 2009.
- 4. Please provide the following head loss and vortexing testing-related information.
- a. Information requested by the NRC staff's revised content guide that was not previously submitted due to the testing being incomplete, or that changed during subsequent testing
- b. Flow rates in the flume
- c. Scaling factors
- d. Debris amounts added to the testing apparatus, and debris size distributions for added fibrous debris
- e. Debris preparation and introduction methods which ensure prototypical debris transport and bed formation
- 5. At the beginning of recirculation for a small-break loss-of-coolant accident (SBLOCA),
the strainer stacks are submerged by about two inches. The supplemental response stated that buoyant debris would not be present following a loss-of-coolant accident (LOCA) (based on the first tests performed at Alden Research Laboratory (ARL)) and that, therefore, air ingestion through the debris on the strainer screens would not occur.
However, NRC staff present at the ARL testing noted that the debris was added after being mixed together and then mixed with water. This test may have not been a prototypical test to determine whether buoyant debris can occur. The phenomenon of buoyant debris should be addressed.
- 6. The supplemental response did not consider the potential effects of water from the break or from spray drainage falling near the strainer. Especially during the period of relatively small submergence, and possibly at times for which there are other sump pool levels, the falling water could entrain air near the strainer resulting in the air being drawn through the strainer and into the emergency core cooling system pump suction header.
This potential post-LOCA phenomenon should be considered and addressed.
- 7. The supplemental response stated in one place that observations for vortexing will be accomplished during the head loss testing for the future. In another area, the
L. Meyer -2 supplemental response stated that the assessment of vortexing was based on empirical observations rather than a calculation (presumably during testing which had already been conducted). These two statements appear to be contradictory. The final vortexing assessment should provide the test conditions under which the observations occurred and discuss how these conditions are either prototypical or conservative with respect to expected plant conditions.
- 8. The clean strainer head loss (CSHL) value provided in the submittal was stated to be for hot sump conditions. A value for CSHL for the postulated minimum sump temperature should be provided.
- 9. The licensee assumed that all debris generated by a LOCA transports to the sump.
However, no size distributions for the various debris types expected to arrive at the strainer was provided. Size distribution is an important factor in debris bed formation and is therefore required to perform and document a valid head loss test. Size distributions for debris expected to arrive at the strainer should be provided.
- 10. Based on recent testing, it was reported that a debris interceptor would be installed that will prevent 75 percent of the debris from reaching the strainer. The amount of debris passing the interceptor should have been, or should be, evaluated considering the potential water levels above the interceptor, debris sizes, debris types, etc. The debris used in testing should match the characteristics of the debris that is expected to pass the interceptors. Therefore, the validity of the 75 percent efficiency value for the debris interceptor should be addressed and also stated to be reflected in debris quantities used in strainer testing, if applicable.
- 11. The supplemental response did not provide an adequate response to the revised content guide question on the ability of the strainer to accommodate the maximum debris load.
The supplemental response stated that debris beyond that collecting on the strainer would collect in the free volume in the lower level of the containment. The intent of the question is to ensure that the strainer either has a large enough area to prevent circumscribed bed formation, or that the formation of a circumscribed bed will not result in excessive head loss. Alternatively, a properly conducted test could show that a circumscribed bed will not result even from the maximum potential debris load. Please re-address this content qulde question, given the above guidance.
- 12. The supplemental response indicated in several places that a thin bed would not likely form on the complex Performance Contracting Incorporated (PCI) strainer. Based on several tests of PCI strainers that have resulted in a relatively thin filtering bed, and the licensee's potentially challenging debris loads in terms of thin bed formation, the staff believes that the thin bed should be evaluated for the new Point Beach strainer configuration. Please justify the conclusion that such a bed would not form.
- 13. The submittal references 38 inches as the maximum allowable head loss. Based on recent test results described to the NRC in a phone call with the Point Beach licensee, it appears that this value may be too low. Please state the final maximum allowable head loss and reflect this value in net positive suction head calculations and structural evaluations.
- 14. Please list the quantity and debris characteristics of unqualified coating debris in containment.
L. Meyer -3
- 15. The supplemental response indicated that the quantity of coatings debris from steel structures is represented by the surface area of a 10 diameter (D) "half sphere." This approach is not consistent with the NRC safety evaluation (SE) dated December 6, 2004, on Nuclear Energy Institute (NEI) 04-07 "Pressurize Water Reactor Sump Performance Methodology," which calls for all of the coatings within a 100 201 of a pipe break to fail. Please provide the surface area of the coated steel structures in the 100 zone of influence (201). Is this surface area bounded by the surface area of a 100 half sphere?
- 16. The supplemental response indicated that the quantity of coatings debris from concrete structures is represented by the surface area of a 40 "sphere." This approach is not consistent with the NRC SE on NEI 04-07, which calls for the surface area of all coated concrete surfaces within a representative 201. Please provide the surface area of the coated concrete surfaces in a 40 201 around the limiting pipe break. Is this surface area bounded by the surface area of a 40 sphere?
- 17. Considering your responses to the foregoing two RAls, please provide the total quantities of qualified coatings in the respective 20ls for concrete and steel surfaces, as well as the total quantities of degraded qualified coatings and unqualified coatings in containment. Are the quantities from your initial GL 2004-02 response (ML052500302) still accurate?
- 18. Please describe the debris characteristics and transport percentage (size, shape, density, and thickness) of the qualified, degraded qualified and unqualified coating debris.
- 19. Please provide the information requested under item (m) in the Revised Content Guide for GL 2004-02 Supplemental Response dated November 2007.
- 20. The NRC staff considers in-vessel downstream effects to not be fully addressed at Point Beach Nuclear Plant (PBNP). The licensee's supplemental response refers to draft WCAP-16793-NP, "Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid." The NRC staff has not issued a final SE for WCAP-16793-NP. The licensee may demonstrate that in-vessel downstream effects issues are resolved for PBNP by showing that the licensee's plant conditions are bounded by the final WCAP-16793-NP and the corresponding final NRC staff SE, and by addressing the conditions and limitations in the final SE. The licensee may alternatively resolve this item by demonstrating, without reference to WCAP-16793-NP or the staff SE, that in-vessel downstream effects have been addressed at PBNP. In any event, the licensee should report how it has addressed the in-vessel downstream effects issue within 90 days of issuance of the final NRC staff SE on WCAP-16793-NP. The NRC staff is developing a Regulatory Issue Summary to inform the industry of the staffs expectations and plans regarding resolution of this remaining aspect of GSI-191.
- 21. The maximum aluminum concentration in the containment sump has been revised from a former calculation. The updated calculations show that less than 20 parts per million (ppm) will be the maximum aluminum concentration. Please provide the calculations used to determine final aluminum concentration, highlighting the differences in the revised calculations that show why a less than 20 ppm aluminum concentration is more
L. Meyer - 4 representative of the post-LOCA sump environment. Please identify any important assumptions (e.g., pH) that significantly affect the calculation.
- 22. Please provide a table that shows how the mass of precipitate formed varies as a function of sump pH and sump volume.
- 23. Please discuss why dissolution of concrete surfaces will not contribute significantly to the precipitate loading in the sump.
- 24. Aluminum coatings are present on the reactor vessel as well as other components inside the containment. The supplemental response states that these coatings are formulated to withstand high temperatures and would therefore not be expected to fail during a LOCA. Operating experience at several US plants indicates that high-temperature aluminum coatings can disbond under normal operating conditions. These coatings are unqualified coatings and as such are expected to fail in pigment sized particles (including coatings outside of the lOI). The aluminum would be separated, at least partially, from the silicone resin. These fine particles could then be readily exposed to either containment spray or sump fluid and would be available to contribute to chemical effects. For any aluminum coatings that are not covered with insulation materials that would remain intact and hold the coatings in place, please provide justification for not including the aluminum mass in the chemical effects evaluation.
L. Meyer -2 The NRC staff considers in-vessel downstream effects, discussed in RAI 20, to not be fully addressed at the Point Beach Nuclear Plant, as well as at other pressurized-water reactors.
The licensee's submittal refers to draft WCAP-16793-NP, "Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid." At this time, the NRC staff has not issued a final safety evaluation (SE) for WCAP-16793.
The licensee may demonstrate that in-vessel downstream effects issues are resolved for the Point Beach Nuclear Plant, by showing that the licensee's plant conditions are bounded by the final WCAP-16793 and the corresponding final NRC staff SE, and by addressing the conditions and limitations in the final SE. The licensee may also resolve RAI 20 by demonstrating, without reference to WCAP-16793 or the NRC staff SE, that in-vessel downstream effects have been addressed at the Point Beach Nuclear Plant. The specific issues raised in RAI 20 should be addressed regardless of the approach the licensee chooses to take.
The licensee should report how it has addressed the in-vessel downstream effects issue and the associated RAI referenced above within 90 days of issuance of the final NRC staff SE on WCAP-16793. The NRC staff is currently developing a Regulatory Issue Summary to inform licensees of the staff's expectations and plans regarding resolution of this remaining aspect of Generic Safety Issue 191, "Assessment of Debris Accumulation on PWR Sump Performance."
If you have any questions, please contact me at (301) 415-1424.
Sincerely, lRAI Justin Poole, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
As stated cc w/encl: Distribution via ListServ DISTRIBUTION:
PUBLIC LPL3-1 R1F RidsNrrDorlLpl3-1 RidsNRRPMPointBeach Resource RidsNrrLATHarris Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsRgn3MailCenter Resource RidsNrrDorlDpr Resource DHarrision, NRR AHiser, NRR RidsNrrDssSsibADAMS KManoly, NRR ADAMS Accession No'.. ML083300173 OFFICE LPL3-1/PM LPL3-1/PM LPL3-1/LA DSS/SSIB/BC DCI/CSGB/BC LPL3-1/BC NAME JCushing JPoole THarris MScott AHiser LJames DATE 12/15/08 01/07/09 12/01/08 12/11/08 12/19/08 01/07/08 OFFICIAL RECORD COpy