ML110750197

From kanterella
Jump to navigation Jump to search

2011 Summary of Public Teleconference with NextEra to Discuss Erosion Testing to Be Performed in Support of Debris Interceptor Analysis
ML110750197
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/30/2011
From: Geoffrey Miller
Plant Licensing Branch 1
To:
Miller G, NRR/DORL/LPL1-2, 415-2481
References
TAC MC4716
Download: ML110750197 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 30. 2011 LICENSEE:

NextEra Energy Seabrook, LLC (NextEra)

FACILITY:

Seabrook Station, Unit No. 1 (Seabrook)

SUBJECT:

SUMMARY

OF FEBRUARY 18, 2011, PUBLIC TELECONFERENCE WITH NEXTERA TO DISCUSS EROSION TESTING TO BE PERFORMED IN SUPPORT OF DEBRIS INTERCEPTOR ANALYSIS (TAC NO. MC4716)

On February 18, 2011, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of NextEra at the NRC Headquarters, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss NextEra's planned, Seabrook-specific, erosion testing being performed to support debris interceptor analysis. This analysis is in support of the licensee's efforts with respect to Generic Safety Issue 191, "Assessment of Debris Accumulation on PWR [Pressurized Water Reactor]

Sump Performance." The information presented by NextEra was made available prior to the meeting in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML110480290. A list of attendees is included in the Enclosure.

The meeting was opened with a discussion of differences in the testing to be performed. The changes were being made to more accurately simulate the expected conditions at Seabrook.

Following this discussion, the NRC staff had some questions regarding the velocity of the water assumed and how it was applied to the debris mass. The NRC staff did not identify any major flaws with the testing as presented.

Following the discussion, the meeting was opened to members of the public. No questions were received.

Please direct any inquiries to me at 301-415-2~:7:~~gov.

G. Edward Miller, Project Manager Plant licensing Branch 1-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

list of Attendees cc w/encl: Distribution via listserv

Sign In Sheet Discussion of Seabrook Erosion Testing DATE: February 18, 2011 Name Organization Phone Number/E-maii Address (Optional)

Steve Smith NRRJDSS 301-415-3190 Jim Trapp OEDO 301-415-1136 Ed Miller NRRJDORL 301-415-2481 Via Phone Tim Sande Alion Megan Stachowiak Alion Gil Zigler Alion Paul Willoughby NextEra Rich Faix NextEra J. Brown l\\lextEra

Package: ML110750226 Meeting Notice: ML110350205 Meeting Summary: ML110750197 Package Containing E-mail, Willoughby, to Miller: ML110480290 "via email LPL 1-2/LA LPL1-2/BC OFFICE LPL1-2/PM GEMiIler ABaxter..

HChernoff NAME 129/11 3/29/2011 3/30/11