Summary of Teleconference Meeting with Florida Power & Light Company, on Generic Letter 2004-02
ML102590274
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/17/2010
From: Jason Paige
Plant Licensing Branch II
To:
Florida Power & Light Co
Paige, Jason C, NRR/DORL,301-415-5888
Shared Package
ML102590300 List:
References
TAC MC4725, GL-04-002, TAC MC4726
Download: ML102590274 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 17, 2010 LICENSEE: Florida Power & Light Company FACILITY: Turkey Point Nuclear Plant, Units 3 and 4

SUBJECT:

SUMMARY

OF JULY 26, 2010, TELECONFERENCE WITH FLORIDA POWER

& LIGHT COMPANY, ON GENERIC LEDER 2004-02 (TAC NOS. MC4725 AND MC4726)

On August 6, 2009 (Agencywide Document and Management System (ADAMS) Accession No. ML092440479), Florida Power & Light Company (FPL, the licensee) and the Nuclear Regulatory Commission (NRC) held a public teleconference regarding Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors." More specifically, the purpose of the conference call was to discuss FPL's March 19, 2009 (ADAMS Accession Nos. ML090920410 and ML090930452), responses to the NRC's requests for additional information (RAls). From this conference call, the NRC identified additional items that FPL would have to address. Also, the NRC generated additional RAls, which were transmitted to the licensee via email on August 25, 2009 (ADAMS Accession No. ML100351459). The licensee provided draft responses to these open items and additional RAls on December 4, 2009.

On February 3,2010, FPL and the NRC held a public teleconference to discuss the licensee's December 4, 2009, draft responses regarding GL 2004-02 for Turkey Point, Units 3 and 4. As a result of the teleconference, the licensee was to revise and incorporate the comments to the Unit 3 responses, address the additional clarifying RAls on the licensee's response for RAI 11.s from the August 25,2009, RAls for Unit 4, and address the NRC staff's feedback on the licensee's July 30, 2009 (ADAMS Accession No. ML092260601), submittal, "Response in Support of Turkey Point Unit 3 Extension Request - Alternative Approach for Demonstrating Turkey Point Unit 3 Compliance with Generic Letter (GL) 2004-02 Using Turkey Point Unit 4 Integrated Test Data."

On July 26, 2010, FPL and the NRC held a public teleconference at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland to discuss the licensee's draft Unit 3 responses, the response to Unit 4 RAI 11.s, and the licensee's draft responses to the NRC staff's comments on the July 30, 2009, submittal. A list of attendees is enclosed.

The first discussion was on draft RAI response 11.s for Unit 4. The staff stated that the licensee should provide a minimum sump level in its response to RAI 11.s.2 to avoid an inadvertent inconsistency with RAI response 11.s.3. The staff stated that the latest licensee responses for RAI 11.s address the staff's request.

The next discussion topic was on the July 30,2009, submittal, which was described as the crosswalk document between Unit 3 and Unit 4 during the meeting. Regarding section 2.4 of the crosswalk document, the staff stated that the licensee has not adequately shown that uniform flow bounds actual flow, including assuming uniform approach velocity at each strainer

-2 surface as a computational fluid dynamics boundary condition. The NRC also stated that the licensee has not shown that the chosen break is limiting for transport because of flow conditions and debris addition points for the test. Also, the licensee has not demonstrated that the test turbulence bounds the plant turbulence. Lastly, a justification for defining averaging planes for flow was not provided, nor does the staff have confidence in averaging together different flow paths without weighting the flow paths.

For Section 2.2 of the crosswalk document, the NRC provided feedback that the licensee should discuss the performance differences between uniform flow and non-uniform strainers. For Section 2.5.3, the licensee needs to discuss the impact of the Unit 3 non-chemical test by concluding that it was more conservative than the Unit 4 test (assuming that is the case). The NRC staff stated that this approach might be acceptable assuming that the Unit 4 testing is found acceptable. For Section 2.5.2, the NRC staff stated that the licensee should provide a summary-level description of how the vortexing calculation was done, especially the basis for the numbers and multiplication factors provided on page 16 of 25 of the latest "crosswalk" submmittal.

Regarding the unresolved items generated from the February 3, 2010, public teleconference for Unit 3, the NRC staff found the draft RAI responses 3, 4, 19, and 25 through 30 acceptable for final submittal. For RAI response 24, the NRC staff stated that the licensee should add that there is no standing water in the refueling cavity since the drains are on the floor. Also, the licensee should justify why miscellaneous materials (e.g., tags and labels) would not cause drain blockage.

At the conclusion of the call, the licensee stated it will inform the NRC staff of its plans, including submittal dates, for either revising the draft responses or submitting the formal responses.

Members of the public were not in attendance. Therefore, public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-J=~::V'

)l on C. Paige, Project Manager pV;nt Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES JULY 26,2010, TELECONFERENCE WITH FLORIDA POWER & LIGHT GENERIC LEDER 2004-02 U.S. NUCLEAR REGULATORY COMMISSION M. Scott S. Smith J. Lehning W.Jessup FLORIDA POWER & LIGHT B. Cross E. Lozito E. McLean B. Patterson O. Hanek R. Everett ALDEN LABS L. Haber AREVA M. Plante Enclosure

PK G ML102590300 Mee f In!=! N' Otlce ML101940520 Meef In!=! S ummarv ML102590274 OFFICE DORULPL2-2/PM DORULPL2-2/LA DSS/SSIB/BC DORULPL2-2/BC (A) DORULPL2-2/PM NAME JPaige BClayton MScott DBroaddus (FSaba for) JPaige DATE 9/20/10 9/17/10 9/27/2010 12/17/10 12/17/10