MONTHYEARML0515202022005-06-0202 June 2005 6/2/05, Turkey Point, RAI, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0603704382006-02-0808 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-basis Accidents at Pressurized-water Reactors Project stage: RAI ML0609505742006-04-13013 April 2006 Approval of GSI-191/GL 2004-02 Extension Request Project stage: Other ML0734503382007-12-0707 December 2007 Request for Extension of Completion Date of the Generic Letter 2004-02 Actions Project stage: Request ML0807104292008-02-28028 February 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request L-2008-073, NRC Generic Letter 2004-02 Request for an Extension to the Completion Date for Ex-Vessel Downstream Effects Evaluations2008-04-14014 April 2008 NRC Generic Letter 2004-02 Request for an Extension to the Completion Date for Ex-Vessel Downstream Effects Evaluations Project stage: Request ML0810702522008-04-14014 April 2008 NRC Generic Letter 2004-02 Request for an Extension to the Completion Date for Ex-Vessel Downstream Effects Evaluations Project stage: Request ML0812006062008-04-29029 April 2008 Approval of Extension Request for GL 2004-02 Project stage: Other ML0819603862008-06-30030 June 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0826107052008-09-17017 September 2008 Request for Additional Information (RAI) Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors Project stage: RAI ML0834400782008-12-19019 December 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Request for Additional Information Project stage: RAI ML0833806712008-12-22022 December 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Request for Additional Information (TAC Mc 4725) Project stage: RAI L-2009-062, Response to NRC Request for Additional Information Regarding the Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.2009-03-19019 March 2009 Response to NRC Request for Additional Information Regarding the Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Response to RAI ML0909204102009-03-19019 March 2009 Response to NRC Request for Additional Information Regarding the Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Response to RAI ML0909304522009-03-19019 March 2009 Response to NRC Request for Additional Information Regarding the Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Response to RAI L-2009-063, Response to NRC Request for Additional Information Regarding the Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2009-03-19019 March 2009 Response to NRC Request for Additional Information Regarding the Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Response to RAI ML0920802162009-07-27027 July 2009 Notice of Forthcoming Conference Call with Florida Power and Light Concerning Turkey Point Generic Letter 2004-02 Response Project stage: Other ML0924404792009-09-11011 September 2009 Summary of Conference Call with Florida Power & Light, to Discuss Generic Letter 2004-02, Potential Impact of Debris Blackage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactor, Responses Project stage: Other ML1001900112010-01-19019 January 2010 Notice of Conference Call with Florida Power & Light Concerning Turkey Point Generic Letter 2004-02 Response Project stage: Other ML1003512132010-02-18018 February 2010 Request for Additional Information Regarding GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML1019405202010-07-14014 July 2010 Notice of Conference Call with Florida Power and Light Company to Discuss Draft Responses to NRC Requests for Additional Information for Generic Letter 2004-02 Project stage: Draft RAI ML1007407182010-07-28028 July 2010 February 3, 2010, Turkey Point, Unit 3 & 4, Summary of Meeting with Florida Power & Light, on Generic Letter 2004-02 Project stage: Meeting L-2010-205, Responses to NRCs Request for Additional Information Dated Feb. 18, 2010 Re Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2010-09-17017 September 2010 Responses to NRCs Request for Additional Information Dated Feb. 18, 2010 Re Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML1025902742010-12-17017 December 2010 Summary of Teleconference Meeting with Florida Power & Light Company, on Generic Letter 2004-02 Project stage: Meeting L-2012-098, Units, 1 and 2, Turkey Point, Units 3 and 4, Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol2012-03-0303 March 2012 Units, 1 and 2, Turkey Point, Units 3 and 4, Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol Project stage: Request ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol Project stage: Draft Approval ML12222A0392012-08-0909 August 2012 8/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto Project stage: Draft Approval ML12121A3842012-08-31031 August 2012 Acknowledgment Letter Regarding Draft Propose Guideline for Strainer Fiber Bypass Test Protocol Associated with Generic Letter 2004 Project stage: Draft Other 2009-03-19
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 17, 2010 LICENSEE:
Florida Power & Light Company FACILITY:
Turkey Point Nuclear Plant, Units 3 and 4
SUBJECT:
SUMMARY
OF JULY 26, 2010, TELECONFERENCE WITH FLORIDA POWER
& LIGHT COMPANY, ON GENERIC LEDER 2004-02 (TAC NOS. MC4725 AND MC4726)
On August 6, 2009 (Agencywide Document and Management System (ADAMS) Accession No. ML092440479), Florida Power & Light Company (FPL, the licensee) and the Nuclear Regulatory Commission (NRC) held a public teleconference regarding Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors." More specifically, the purpose of the conference call was to discuss FPL's March 19, 2009 (ADAMS Accession Nos. ML090920410 and ML090930452), responses to the NRC's requests for additional information (RAls). From this conference call, the NRC identified additional items that FPL would have to address. Also, the NRC generated additional RAls, which were transmitted to the licensee via email on August 25, 2009 (ADAMS Accession No. ML100351459). The licensee provided draft responses to these open items and additional RAls on December 4, 2009.
On February 3,2010, FPL and the NRC held a public teleconference to discuss the licensee's December 4, 2009, draft responses regarding GL 2004-02 for Turkey Point, Units 3 and 4. As a result of the teleconference, the licensee was to revise and incorporate the comments to the Unit 3 responses, address the additional clarifying RAls on the licensee's response for RAI 11.s from the August 25,2009, RAls for Unit 4, and address the NRC staff's feedback on the licensee's July 30, 2009 (ADAMS Accession No. ML092260601), submittal, "Response in Support of Turkey Point Unit 3 Extension Request - Alternative Approach for Demonstrating Turkey Point Unit 3 Compliance with Generic Letter (GL) 2004-02 Using Turkey Point Unit 4 Integrated Test Data."
On July 26, 2010, FPL and the NRC held a public teleconference at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland to discuss the licensee's draft Unit 3 responses, the response to Unit 4 RAI 11.s, and the licensee's draft responses to the NRC staff's comments on the July 30, 2009, submittal. A list of attendees is enclosed.
The first discussion was on draft RAI response 11.s for Unit 4. The staff stated that the licensee should provide a minimum sump level in its response to RAI 11.s.2 to avoid an inadvertent inconsistency with RAI response 11.s.3. The staff stated that the latest licensee responses for RAI 11.s address the staff's request.
The next discussion topic was on the July 30,2009, submittal, which was described as the crosswalk document between Unit 3 and Unit 4 during the meeting. Regarding section 2.4 of the crosswalk document, the staff stated that the licensee has not adequately shown that uniform flow bounds actual flow, including assuming uniform approach velocity at each strainer
- 2 surface as a computational fluid dynamics boundary condition. The NRC also stated that the licensee has not shown that the chosen break is limiting for transport because of flow conditions and debris addition points for the test. Also, the licensee has not demonstrated that the test turbulence bounds the plant turbulence. Lastly, a justification for defining averaging planes for flow was not provided, nor does the staff have confidence in averaging together different flow paths without weighting the flow paths.
For Section 2.2 of the crosswalk document, the NRC provided feedback that the licensee should discuss the performance differences between uniform flow and non-uniform strainers. For Section 2.5.3, the licensee needs to discuss the impact of the Unit 3 non-chemical test by concluding that it was more conservative than the Unit 4 test (assuming that is the case). The NRC staff stated that this approach might be acceptable assuming that the Unit 4 testing is found acceptable. For Section 2.5.2, the NRC staff stated that the licensee should provide a summary-level description of how the vortexing calculation was done, especially the basis for the numbers and multiplication factors provided on page 16 of 25 of the latest "crosswalk" submmittal.
Regarding the unresolved items generated from the February 3, 2010, public teleconference for Unit 3, the NRC staff found the draft RAI responses 3, 4, 19, and 25 through 30 acceptable for final submittal. For RAI response 24, the NRC staff stated that the licensee should add that there is no standing water in the refueling cavity since the drains are on the floor. Also, the licensee should justify why miscellaneous materials (e.g., tags and labels) would not cause drain blockage.
At the conclusion of the call, the licensee stated it will inform the NRC staff of its plans, including submittal dates, for either revising the draft responses or submitting the formal responses.
Members of the public were not in attendance. Therefore, public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-J=~::V'
)lon C. Paige, Project Manager pV;nt Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES JULY 26,2010, TELECONFERENCE WITH FLORIDA POWER & LIGHT GENERIC LEDER 2004-02 U.S. NUCLEAR REGULATORY COMMISSION M. Scott S. Smith J. Lehning W.Jessup FLORIDA POWER & LIGHT B. Cross E. Lozito E. McLean B. Patterson O. Hanek R. Everett ALDEN LABS L. Haber AREVA M. Plante Enclosure
PK ML102 M
f N' ML101940520 ee In!=!
Otlce ML102590274 M
f S
ee In!=!
ummarv OFFICE DORULPL2-2/PM DORULPL2-2/LA DSS/SSIB/BC DORULPL2-2/BC (A)
DORULPL2-2/PM NAME JPaige BClayton MScott DBroaddus (FSaba for) JPaige DATE 9/20/10 9/17/10 9/27/2010 12/17/10 12/17/10