Other: ML073511698, ML081790538, ML091800430, ML093000354, ML101800052, ML110350515, NRC 2009-0113, Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4705/4706), NRC 2011-0010, Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
|
MONTHYEARML0515203322005-06-0303 June 2005 6/3/05, Point Beach - RAI Potential Impact of Debris Blockage on Emergency Sump Recirculation Pressurized-Water Reactors Project stage: RAI ML0603704912006-02-0909 February 2006 RAI - Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0732303452007-11-16016 November 2007 Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0735116982007-12-20020 December 2007 GSI-191/GL 2004-02 Extension Request Approval (Tac No. MC4705/4706) Project stage: Other NRC 2008-0027, Response to Request for Additional Information License Amendment Request 260 One-Time Extension of Completion Time for Technical Specification 3.7.5. Auxiliary Feedwater System2008-05-15015 May 2008 Response to Request for Additional Information License Amendment Request 260 One-Time Extension of Completion Time for Technical Specification 3.7.5. Auxiliary Feedwater System Project stage: Response to RAI ML0816203372008-06-0909 June 2008 Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0817905382008-07-0101 July 2008 Generic Safety Issue 191/Generic Letter 2004-02, Additional Extension Request Approval Project stage: Other ML0822503302008-10-0606 October 2008 Teleconference Summary Regarding Point Beach Nuclear Plant Supplement to the Auxiliary Feedeater Amendment Project stage: Request ML0833001732009-01-0707 January 2009 GSI-191/GL 2004-02 Request for Additional Information Project stage: RAI NRC 2009-0033, Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2009-04-0707 April 2009 Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI ML0909805232009-04-0707 April 2009 Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI ML0916603262009-06-12012 June 2009 Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706) Project stage: Request NRC 2009-0053, Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706)2009-06-12012 June 2009 Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706) Project stage: Request NRC 2009-0059, Response to Request for Additional Information GSI-I91/GL 2004-02 Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2009-06-29029 June 2009 Response to Request for Additional Information GSI-I91/GL 2004-02 Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI ML0918004302009-06-30030 June 2009 GSI-191/GL 2004-02 Additional Extension Request Approval Project stage: Other ML0921506362009-07-31031 July 2009 Response to Request for Additional Information GSI-191/GL 2004-02 (TACs MC4705/4706) Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI NRC 2009-0077, Response to Request for Additional Information GSI-191/GL 2004-02 (TACs MC4705/4706) Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2009-07-31031 July 2009 Response to Request for Additional Information GSI-191/GL 2004-02 (TACs MC4705/4706) Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI ML0930003542009-10-27027 October 2009 Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4705/4706) Project stage: Other NRC 2009-0113, Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4705/4706)2009-10-27027 October 2009 Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4705/4706) Project stage: Other ML1005704542010-03-0303 March 2010 Notice of Meeting with FPL Energy Point Beach, LLC Regarding Discussion of Licensee Responses to Generic Letter 2004-02 for Point Beach Nuclear Plant, Units 1 and 2 Project stage: Meeting ML1005703212010-03-0303 March 2010 Request for Additional Information Generic Letter 2004-02 Round 2 Project stage: RAI NRC 2010-0046, Supplemental Response for Extension Request for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation Durian Design Basis Accidents at Pressurized-Water Reactors2010-06-11011 June 2010 Supplemental Response for Extension Request for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation Durian Design Basis Accidents at Pressurized-Water Reactors Project stage: Supplement ML1018000522010-06-30030 June 2010 Generic Letter Project stage: Other ML1016002922010-07-0808 July 2010 Summary of Meeting with NextEra Point Beach, Llc. Response to GL 2004-02 Project stage: Meeting NRC 2011-0010, Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2011-02-0404 February 2011 Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML1103505152011-02-0404 February 2011 Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other L-2012-098, Units, 1 and 2, Turkey Point, Units 3 and 4, Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol2012-03-0303 March 2012 Units, 1 and 2, Turkey Point, Units 3 and 4, Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol Project stage: Request ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol Project stage: Draft Approval ML12222A0392012-08-0909 August 2012 8/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto Project stage: Draft Approval ML12121A3842012-08-31031 August 2012 Acknowledgment Letter Regarding Draft Propose Guideline for Strainer Fiber Bypass Test Protocol Associated with Generic Letter 2004 Project stage: Draft Other 2009-06-12
[Table View] |
Text
FPL Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 FPL E m e ~ g y Point Beach Nuclear Plarlt June 9,2008 NRC 2008-0038 GL 2004-02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Unit 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Supplemental Response to Generic Letter 2004-02, Potential lmpact of Debris Blockaae on Emeraencv Recirculation Durina Desian Basis Accidents at Pressurized-Water Reactors
References:
(1 )
(2)
NRC Generic Letter (GL) 2004-02 dated September 13, 2004, "Potential lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors? (ML042360586)
Nuclear Management Company, LLC Letter to NRC dated September 1, 2005,
'Nuclear Management Company Response to GL 2004-02: Potential lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactor$ (ML052500302)
NRC Letter to Nuclear Management Company, LLC dated February 9,2006,
'Point Beach Nuclear Plant, Units 1 and 2: Request For Additional Information Re: Response to GL 2004-02: Potential lmpact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors? (ML060370491)
NMC Letter to NRC dated October 3, 2006, "Supplemental Response to GL 2004-02, Potential lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorS' (ML062850105)
FPL Energy Point Beach Letter to NRC dated November 16,2007,"Response to GL 2004-02, Potential lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorS (ML073230345)
FPL Energy Point Beach Letter to NRC dated February 29, 2008,"Supplemental Response to Generic Letter 2004-02, Potential lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactor$ (ML080630613)
Telephone Conference with NRC on February 26, 2008, regarding Point Beach Nuclear Plant Resolution of GL 2004-02 Telephone Conference with NRC on May 20, 2008, regarding Point Beach Nuclear Plant Resolution of GL 2004-02 An FPL Group company
Document Control Desk Page 2 This letter documents the discussions between representatives of the NRC Staff and FPL Energy Point Beach regarding extension of the June 30, 2008, completion of activities required via Generic Letter 2004-02. The discussions are identified as References (7) and (8) above.
FPL Energy Point Beach has not been able to conduct the confirmatory head loss testing of the replacement emergency core cooling system (ECCS) sump screens as a result of limited test facility availability. Therefore, a final submittal containing the information requested in References (I) and (3) will be delayed beyond June 30, 2008, as previously committed to in Reference (6).
The remaining areas to be addressed to complete GL 2004-02 are head loss testing (including potential chemical effects), analysis of potential chemical precipitants, and evaluation of both in-vessel and ex-vessel downstream effects. While the analyses and evaluations of chemical effects and downstream effects have been completed, these results will be submitted with the head loss test results so the final submittal is complete.
FPL Energy Point Beach has been actively engaged in monitoring and evaluating the test results and experiences of other pressurized water reactors (PWR) testing of similar ECCS strainers. As a result of some of the test results obtained by the contractors performing tests for other PWRs, FPL Energy Point Beach is revisiting the debris generation analyses and exploring other areas where excessive conservatisms could cause head loss test failures when actual screen performance is expected to be fully acceptable.
Earlier tests performed for FPL Energy Point Beach used the default zone of influence (ZOI) values stated in NEI 04-07 Volume I and accepted in Volume II. This resulted in a very large volume of generated debris. Industry testing has demonstrated that actual ZOls (specifically the ZOI for NUKON insulation) are substantially smaller. Therefore, FPL Energy Point Beach is revising the debris generation analyses to reflect these later test results and reduce the total quantity of fibrous debris from NUKON. Changes from the methodology previously submitted will be discussed in the final submittal.
As a result of these supporting analytical changes, the scheduled large flume testing for FPL Energy Point Beach at Alden Laboratories has been delayed to the week of July 7, 2008.
The testing contractors have indicated that the preparation, review and approval of the final test reports and supporting calculations will require six weeks following completion of testing.
FPL Energy Point Beach intends to develop the final submittal to the NRC in parallel, and to provide that submittal by September 30, 2008. This new date represents a three-month delay in transmittal of the final response to GL 2004-02 from that previously committed in Reference (6).
Transmittal of the test results to NRC can be provided, if desired, within a week following completion of testing.
The planned testing will be performed in accordance with the protocol previously established by PCI, AREVA, and Alden Laboratories for the demonstration testing of"SureFld'strainers.
The replacement screens have been installed, the affected procedures have been revised to reflect the operating requirements of the screens, and there are no remaining modifications or changes planned.
Document Control Desk Page 3 The bases for a reasonable assurance of operability with the installed replacement strainers is unchanged from that detailed in Reference (5), and is further substantiated by the information provided in Reference (6). In addition, the mitigative measures that were described in Reference (5) remain in effect.
Summary of Resulatory Commitments This letter revises the following Regulatory Commitment stated in Reference (6):
The final submittal of the testing and analyses demonstrating acceptable long-term ECCS performance in the areas of downstream and chemical effects will be made by September 30, 2008.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on June 9.2008.
Very truly yours, FPL ENERGY-BEACH, LLC 2+-?P Site ice President McCarthy Enclosures CC:
Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW