IR 05000280/2008001

From kanterella
(Redirected from ML080630294)
Jump to navigation Jump to search
Annual Assessment Letter (NRC Inspection Report 05000280/2008001 and 05000281/2008001)
ML080630294
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/03/2008
From: Eugene Guthrie
NRC/RGN-II/DRP/RPB5
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
IR-08-001
Download: ML080630294 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

rch 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - SURRY POWER STATION (NRC INSPECTION REPORT 05000280/2008001 AND 05000281/2008001)

Dear Mr. Christian:

On February 6, 2008, the NRC staff completed its performance review of the Surry Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, Surry Power Station Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include: TI 2515/166, Pressurized Water Reactor Containment Sump Blockage; TI 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies; and TI 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

VEPCO 2 In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eugene Guthrie, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37 Enclosure: Surry Inspection/Activity Plan (03/01/08 - 06/30/09)

cc w/encl.: (See page 3)

_________________________

OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/ /RA/

NAME JDodson DArnett LGarner EGuthrie DATE 2/28/08 2/27/08 3/3/08 3/3/08 3/ /2008 3/ /2008 3/ /2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

VEPCO 3 cc w/encl.:

Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company Electronic Mail Distribution Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Millstone Power Station Electronic Mail Distribution

VEPCO 4 Letter to Jeffrey B. Archie from Eugene F. Guthrie dated March 3, 2008 SUBJECT: ANNUAL ASSESSMENT LETTER - SURRY POWER STATION NRC INSPECTION REPORT 05000280/2008001 AND 05000281/2008001 Distribution w/encl.:

C. Evans, RII EICS (Part 72 Only)

L. Slack, RII EICS OE Mail (email address if applicable)

S. P. Lingam, NRR Richard Jervey, NRR RIDSNRRDIRS PUBLIC

Page 1 of 2 Surry 03/03/2008 08:13:27 Inspection / Activity Plan Report 22 03/01/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - INITIAL EXAM 4 1 V23279 SURRY/MARCH 2008 EXAM AT POWER FACILITIES 03/17/2008 03/28/2008 Not Applicable EB1-SUMP - TI 2515/166 CONTAINMENT SUMP INSPECTION 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 05/05/2008 05/09/2008 Safety Issues EB3-ISI - UNIT 2 - ISI 2 2 IP 7111108P Inservice Inspection Activities - PWR 05/05/2008 05/09/2008 Baseline Inspections EB3TI172 - TI-172 2 1, 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 05/05/2008 05/09/2008 Generic Safety Inspection EB3SGISI - U2 SG ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 05/12/2008 05/16/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 06/23/2008 06/25/2008 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 06/23/2008 06/27/2008 Baseline Inspections PSB1-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 07/14/2008 07/18/2008 EP Baseline Inspection 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 07/14/2008 07/18/2008 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/14/2008 07/18/2008 EP Baseline Inspection 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/14/2008 07/18/2008 EP Baseline Inspection 1, 2 IP 71151-EP01 Drill/Exercise Performance 07/14/2008 07/18/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 07/14/2008 07/18/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 07/14/2008 07/18/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 07/28/2008 08/01/2008 Baseline Inspections TI-171 - B.5.B PHASE 2&3 3 1, 2 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 08/04/2008 08/08/2008 Generic Safety Inspection OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 04/06/2009 04/10/2009 Baseline Inspections EB3ISI - UNIT 1 ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/27/2009 05/01/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Surry 03/03/2008 08:13:27 Inspection / Activity Plan Report 22 03/01/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TFPI - TFPI 6 1, 2 IP 7111105T Fire Protection [Triennial] 06/08/2009 06/12/2009 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 06/22/2009 06/26/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.