IR 05000280/2008401

From kanterella
Jump to navigation Jump to search
IR 05000280-08-401, and IR 05000281-08-401, on 04/28/2008 Through 05/01/2008, Surry Power Station, Units 1 & 2, Security Compliance to Nrc'S Reactor Oversight Process, Letter Only
ML081790047
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/26/2008
From: Joel Munday
NRC/RGN-II/DRS/PSB2
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
IR-08-401
Download: ML081790047 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION une 26, 2008

SUBJECT:

SURRY POWER STATION - NRC SECURITY INSPECTION REPORT 05000280/2008401 AND 05000281/2008401

Dear Mr. Christian:

On June 5, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Surry Power Station, Units 1 and 2. Portions of the inspection were conducted at the corporate office from April 28, 2008 through May 1, 2008. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. John Grau, Manager, Nuclear Site Services (NSS), and other members of your staff on June 5, 2008.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. VEPCO 2 If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-280, 50-281 License No.: DPR-32, DPR-37 Enclosure: Inspection Report 05000280/2008401 and 05000281/2008401 w/Attachment: Supplemental Information cc w/encl.: See Page 3 VEPCO 3 cc w/Encl:

Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric & Power Company 5570 Hog Island Road Surry, VA 23883 cc w/o Encl:

Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, CT 06385 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 _________________________

OFFICE RII:DRS RII:DRS RII:DRP RII:DRS RII:DRS RII: DRS SIGNATURE /RA/ /RA/ /RA/ /RA J. Munday for/ /RA/ /RA/

NAME J. Munday R. Patterson E. Guthrie A. True K. Davis J. Shehee DATE 6/ 6/13/2008 6/13/2008 6/26/2008 6/13/2008 6/26/2008 E-MAIL COPY? /200826/2008 YES NO YES NO YES NO YES NO YES NO YES NO