IR 05000280/2008007

From kanterella
Jump to navigation Jump to search
IR 05000280-08-007, IR 05000281-08-007, on 08/08/2008, Surry Power Station - Ti 2515/171, Verification of Site Specific Implementation of b.5.b Phase 2 and 3, Mitigating Strategies Inspection
ML082490664
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/03/2008
From: Bates M
NRC/RGN-II/DRP/RPB5
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
IR-08-007
Download: ML082490664 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 September 3, 2008 Virginia Electric and Power Company ATTN: Mr. David President and Chief Nuclear Officer Innsbrook Technical Center - 2SW 5000 Dominion Boulevard Glen Allen, VA 23060-6711 SUBJECT: SURRY POWER STATION - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NOS. 05000280/2008007 and 05000281/2008007.

Dear Mr. Christian:

On August 8, 2008, the United States Nuclear Regulatory Commission (NRC) completed a team inspection at your Surry Power Station, Units 1 and 2. The enclosed report documents the inspection results, which were discussed with Mr. Jernigan and other members of your staff on August 8, 2008.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.

Based on the results of this inspection, no findings of significance were identified. The team concluded that, in general, you had implemented the Site Specific B.5.b Phase 2 and 3 Mitigating Strategies as described in your submittals and the associated Safety Evaluation Report. 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Sincerely,

/RA/

Mark A. Bates, Acting Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 Non-Public Enclosure: Inspection Report 05000280 and 281/2008007 w/Attachment: Supplemental Information cc w/encl: (See next page) 3 cc w/encl:

Curtis G. Luffman Chris L. Funderburk Manager Director, Nuclear Licensing & Operations Nuclear Protection Services Support Virginia Electric & Power Company Virginia Electric and Power Company Surry Power Station Innsbrook Technical Center 5570 Hog Island Road 5000 Dominion Boulevard Surry, VA 23883-0315 Glen Allen, VA 23060-6711 Gerald T. Bischof Senior Resident Inspector Site Vice President US Nuclear Regulatory Commission Virginia Electric and Power Company Surry Power Station Surry Power Station 5850 Hog Island Road 5570 Hog Island Road Surry, VA 23883 Surry, VA 23883-0315 Barry Garber Supervisor Nuclear Engineering Virginia Electric and Power Company Surry Power Station 5570 Hog Island Road Surry, VA 23883-0315 Leslie N. Hartz Vice President - Nuclear Support Services Dominion Resources Services, Inc.

5000 Dominion Boulevard Glen Allen, VA 23061 Nelson K. Martin Manager Nuclear Fleet Protection Services Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

120 Tredegar Street, RS-2 Richmond, VA 23219 4 Letter to William R. Campbell, Jr from Eugene Guthrie dated August XX, 2008 SUBJECT: BROWNS FERRY NUCLEAR PLANT - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO.

05000259/2008008, 05000260/2008008 AND 05000296/2008008 Distribution w/encl:

L. Reyes, RA V. McCree, DRA L. Wert, DRP J. Moorman, DRP (Acting)

K. Kennedy, DRS R. Croteau, DRS H. Christensen, DRS E. Guthrie, DRP L. Garner, DRP J. Baptist, DRP T. Ross, DRP C. Stancil, DRP R. Moore, DRS E. Bowman, NRR E. Brown, NRR (PM: HAT, SUM)

L. Slack, RII EICS OE Mail (email address if applicable)

RIDSNRRDIRS Distribution w/o encl:

PUBLIC