Letter Sequence RAI |
---|
|
|
MONTHYEARML0604101122006-02-0909 February 2006 Request for Additional Information Regarding Amendment to Technical Specifications, Battery and DC Sources (TAC No. MC5447 & MC5448) Project stage: RAI ML0607403472006-03-13013 March 2006 Proposed Change Number (PCN)-548 Battery and DC Sources Upgrades and Cross-Tie Project stage: Other 2006-02-09
[Table View] |
|
---|
Category:Letter
MONTHYEARML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 and Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Service'S December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commission'S Analysis of Southern California Edison'S Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 ML22136A0842022-05-12012 May 2022 Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report ML22122A0402022-04-28028 April 2022 (Songs), Units 1, 2 and 3 - Annual Radioactive Effluent Release Report - 2021 ML22105A5662022-04-0505 April 2022 20053 Letter - OI Closure to Licensee - Wrongdoing Signed ML22081A1692022-03-31031 March 2022 SONGS Application Acceptance Proposed Exemption from Title 10 of the CFR, Part 72.106(b), ISFSI Controlled Boundary IR 05000206/20214022022-03-24024 March 2022 Notice of Violation, NRC Inspection Report 05000206/2021402, 05000361/2021402, 05000362/2021402, and 07200041/2021401; and Investigation Report 4-2021-004- Public- Cover Letter ML22084A0552022-03-23023 March 2022 10 CFR 50.82(a)(8Xv and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 San Onofre Nuclear Generating Station Units 1, 2, and 3 and Independent Spent Fuel Storage Installation IR 05000361/20220012022-03-14014 March 2022 NRC Inspection Report 05000361/2022-001; 05000362/2022-001 ML22066B0242022-03-0303 March 2022 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision 2 to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML22062B0282022-02-28028 February 2022 and Independent Spent Fuel Storage Installation (Isfsi), Response to Request for Supplemental Information Regarding Request for Exemption from 10 CFR 72.106(b) ML22059B0392022-02-25025 February 2022 International, Proprietary Information to Support SCE Exemption ML22060A1132022-02-24024 February 2022 Nuclear Property Insurance ML22060A1152022-02-24024 February 2022 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2021 ML22048B4972022-02-15015 February 2022 (Songs), Units 1, 2 and 3 - 2021 Annual Turtle Incidental Take Report ML22031A1112022-01-26026 January 2022 (Songs), Units 2 and 3 - Annual Corporate Financial Reports 2024-01-17
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML21117A3492021-03-30030 March 2021 March 30, 2021, Email from Public Watchdogs on Providing New Information to Its October 13, 2020, 2.206 Petition ML21068A2722021-03-0909 March 2021 SONGS Endangered Species Act Additional Information Request ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML18193A2002018-07-19019 July 2018 SONGS ISFSI Only Dqap RAI ML15083A4552015-03-27027 March 2015 and Independent Spent Fuel Storage Installation - Request for Additional Information Decommissioning Quality Assurance Program Review ML15071A1842015-03-19019 March 2015 Independent Spent Fuel Storage Installation - Request for Additional Information Regarding the 10 CFR 50.54(p) Changes to the Security Plans ML15042A3942015-01-23023 January 2015 NRR E-mail Capture - SONGS - Draft RAI Permanently Defueled Technical Specifications License Amendment Request ML15033A0522014-12-11011 December 2014 NRR E-mail Capture - SONGS - Draft RAI Permanently Defueled Technical Specifications License Amendment Request ML14248A5902014-09-18018 September 2014 Independent Spent Fuel Storage Installation - Request for Additional Information, Amendment Request to Revise Emergency Plan to Support Permanently Defueled Condition ML14248A5602014-09-18018 September 2014 Independent Spent Fuel Storage Installation - Request for Additional Information, Amendment Request to Revise Emergency Action Level Scheme to Support Permanently Defueled Condition ML14258A0172014-09-11011 September 2014 NRR E-mail Capture - SONGS - Revised Draft RAI Concerning TS Section 5 Administrative Controls License Amendment Request (TACs MF2954 and MF2955) ML14209A0052014-08-27027 August 2014 Request for Additional Information, Exemption Request from 10 CFR 50.47 and 10 CFR Part 50 Appendix E, Discontinue Offsite Emergency Planning Activities and Reduce Scope of Onsite Emergency Planning (TAC MF3835-MF3837) ML14139A4782014-06-0505 June 2014 Request for Additional Information, License Amendment Request to Revise Technical Specifications 5.1, 5.2, and 5.3 to Reflect Reduced Staffing/Training in Permanently Shutdown and Defueled Condition ML14093A6772014-05-0101 May 2014 SONGS - Request for Additional Information Concerning Pre-Emption Authority ML13352A0912013-12-30030 December 2013 Decommissioning Funding Status Report - Request for Additional Information ML13191A8372013-09-12012 September 2013 Request for Additional Information, Review of Decommissioning Funding Status Report ML13154A4312013-06-0404 June 2013 Rai'S Following Ifib Analysis of Edison'S 2013 Decommissioning Funding Status Report for San Onofre Units 2 and 3 ML13113A2562013-05-10010 May 2013 Request for Additional Information No. 73 Regarding Response to Confirmatory Action Letter ML13072A0542013-03-18018 March 2013 Redacted, Request for Additional Information, Nos. 33-67, Southern California Edison'S Response to Nrc'S Confirmatory Action Letter ML13074A6872013-03-15015 March 2013 Email, Draft Request for Additional Information, Nos. 68-72, Southern California Edison'S Response to Nrc'S Confirmatory Action Letter ML13053A1842013-02-21021 February 2013 Draft Request for Additional Information, Nos. 53-67, Southern California Edison'S Response to Nrc'S Confirmatory Action Letter ML13056A0922013-02-20020 February 2013 Email, Draft Request for Additional Information Nos. 38-52, Southern California Edison'S Response to Nrc'S Confirmatory Action Letter ML13053A3672013-02-0101 February 2013 E-mail, Draft Request for Additional Information Southern California Edison'S Response to Nrc'S Confirmatory Action Letter ML12356A1982012-12-20020 December 2012 Email, Request for Additional Information, Round 3, Review of Southern California Edison'S Response to Nrc'S 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report ML12345A4272012-12-10010 December 2012 Revised Email, Request for Additional Information Review of Southern California Edison'S Response to Nrc'S 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report ML12338A1102012-11-30030 November 2012 Email, Request for Additional Information Southern California Edison'S Response to Nrc'S Confirmatory Action Letter (CAL) 4-12-001 Dated March 27, 2012 ML12313A4752012-11-0808 November 2012 Request for Additional Information Email, Relief Request IST-4-P-2, ASME OM Code Requirements for Testing CSS and LPSI Pumps, Fourth 10-Year Inservice Inspection Interval ML12297A3972012-10-23023 October 2012 Request for Additional Information Email, Relief Request ISI-3-36, Reactor Coolant Pressure Boundary Testing, Third 10-Year Inservice Inspection Interval ML12283A2302012-10-0909 October 2012 Request for Additional Information Email, Round 3 W/Corrected Due Date, Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel ML12283A2252012-10-0909 October 2012 Request for Additional Information Email, Round 3, Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel ML12220A0492012-08-0707 August 2012 Request for Additional Information Email, Round 2, License Amendment Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel ML12207A2612012-08-0101 August 2012 Redacted, Request for Additional Information, License Amendment Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel ML12201A1552012-07-19019 July 2012 R. Onge Ltr Request for Additional Information Decommissioning Funding ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML1200603242012-01-19019 January 2012 Fleet, RAI, Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-789 (N-789) ML1126604602011-10-14014 October 2011 Request for Additional Information Regarding Use of American Concrete Institute Reports for Restoration of Unit 3 Containment ML11182C0322011-06-30030 June 2011 Notification of Inspection (Inspection Report 05000361; 05000362/2011004) and Request for Information ML1113003952011-05-10010 May 2011 Email, Draft Request for Additional Information, Review of Biennial Decommissioning Funding Status Report ML1113004002011-05-10010 May 2011 Draft Request for Additional Information, Review of Biennial Decommissioning Funding Status Report ML1112307842011-05-0303 May 2011 Draft Request for Additional Information, Relief Requests ISI-3-32 Through ISI-3-34, Alternative to Requirements for Examinations of Welds and Core Support Structure Surfaces, Third 10-Year Inservice Inspection ML1106006612011-03-0101 March 2011 Draft Generic Request for Additional Information, License Amendment Request to Revise License Condition and Approve Cyber Security Plan ML1024301262010-08-31031 August 2010 Request for Additional Information Relief Request ISI-3-31 ML1022404532010-08-11011 August 2010 Draft Request for Additional Information LAR on Fuel Assembly Movement ML0933601212009-12-0202 December 2009 Request for Additional Information Relief Request ISI-3-30 ML0831705532008-12-0808 December 2008 Request for Additional Information, License Amendment Request to Support Replacement Steam Generators ML0831901202008-11-26026 November 2008 Request for Additional Information Test Protocol Used in the Testing at Vuez 2021-03-09
[Table view] |
Text
February 9, 2006 Mr. Richard M. Rosenblum Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -
REQUEST FOR ADDITIONAL INFORMATION REGARDING AMENDMENT TO TECHNICAL SPECIFICATIONS, BATTERY AND DC SOURCES (TAC NOS.
MC5447 AND MC5448)
Dear Mr. Rosenblum:
On December 17, 2004, Southern California Edison (the licensee) submitted an amendment request (Agencywide Documents Access and Management System Accession Number ML043570322) proposing to revise the Operating License by modifying the Technical Specification (TS) requirements for battery and direct current (DC) sources and cross-tie through revision of TSs 3.8.1, AC [alternating current] Sources - Operating, 3.8.4, DC Sources - Operating, 3.8.5, DC Sources - Shutdown, 3.8.6, Battery Cell Parameters, 3.8.7, Inverters - Operating, 3.8.9, Distribution Systems - Operating, and adding a new Battery Monitoring and Maintenance Program, Section 5.5.2.16.
After reviewing your request, the Nuclear Regulatory Commission staff has determined that additional information is required to complete the review. We discussed this information with your staff by telephone and they agreed to provide the additional information requested in the enclosure within 30 days of receipt of this letter.
If you have any questions, please me at (301) 415-1480.
Sincerely,
/RA/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362
Enclosure:
Request for Additional Information cc w/encl: See next page
February 9, 2006 Mr. Richard M. Rosenblum Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -
REQUEST FOR ADDITIONAL INFORMATION REGARDING AMENDMENT TO TECHNICAL SPECIFICATIONS, BATTERY AND DC SOURCES (TAC NOS.
MC5447 AND MC5448)
Dear Mr. Rosenblum:
On December 17, 2004, Southern California Edison (the licensee) submitted an amendment request (Agencywide Documents Access and Management System Accession Number ML043570322) proposing to revise the Operating License by modifying the Technical Specification (TS) requirements for battery and direct current (DC) sources and cross-tie through revision of TSs 3.8.1, AC [alternating current] Sources - Operating, 3.8.4, DC Sources - Operating, 3.8.5, DC Sources - Shutdown, 3.8.6, Battery Cell Parameters, 3.8.7, Inverters - Operating, 3.8.9, Distribution Systems - Operating, and adding a new Battery Monitoring and Maintenance Program, Section 5.5.2.16.
After reviewing your request, the Nuclear Regulatory Commission staff has determined that additional information is required to complete the review. We discussed this information with your staff by telephone and they agreed to provide the additional information requested in the enclosure within 30 days of receipt of this letter.
If you have any questions, please me at (301) 415-1480.
Sincerely,
/RA/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION PUBLIC LPLIV r/f RidsNrrDorl (CHaney/CHolden)
RidsNrrDorlLplg (DTerao) RidsNrrPMNKalyanam RidsNrrLALFeizollahi AHiser RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn4MailCenter (TPruett) RidsNrrDorlDpr RJenkins GMorris ACCESSION NO: ML060410112
- No major change from Staff provided RAI OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DE/EEEB* NRR/LPL4/BC NAME NKalyanam LFeizollahi RJenkins DTerao DATE 01/12/06 01/12/06 12-21-2005 02/09/06 OFFICIAL RECORD COPY DOCUMENT NAME: E:\Filenet\ML060410112.wpd
REQUEST FOR ADDITIONAL INFORMATION SOUTHERN CALIFORNIA EDISON COMPANY SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 DOCKET NOS. 50-361 and 50-362
- 1. After a battery is declared inoperable per Limiting Condition of Operation (LCO) 3.8.4, Condition B, please describe how you get to Required Actions E1 and E2, or otherwise confirm that the affected unit would be in Technical Specification (TS) 3.0.3.
- 2. Please explain why the Bases for LCO 3.8.5 does not explain the reasons for the cross-connection action cited in TS 3.8.5 (i.e., that an immediate direct current (DC) subsystem cross-connection can be made given an inoperable charger). Explain why in LCO 3.8.4, this option is not called out as a required action, nor is it permissible unless the problem with the DC subsystem does not involve the charger, as prescribed in Condition C of LCO 3.8.4.
- 3. LCO 3.8.5, Condition C, provides a choice between Required Actions C.1 or C.2.1 through C.2.4. Please explain when the latter choice C.2 would become mandatory.
Your response should consider LCO 3.8.10 and its required actions.
- 4. Regarding LCO 3.8.5, Required Action A.1.2, please describe how the proposed TSs would limit cross-connecting two subsystems with the two batteries remaining connected to their respective buses (Note that pages 23, 27, and 28 of the submittal discuss, within the context of LCO 3.8.4, the importance of minimizing the time that two DC subsystem batteries are in parallel due to the consequences should an electrical fault occur while in this configuration.).
- 5. Regarding Surveillance Requirement 3.8.6.1, what actions are required if pilot cell specific gravity is less than 1.200, but greater than or equal to 1.195, and identify what is the source of these required actions.
- 6. Table 1 (found on page 10 of Attachment J); license controlled specification refers to LCS 3.8.104.1, 3.8.104.2, and LCS 3.8.106.1-6. (It should be noted that the incorrect reference to Table 1 is found on page 10 of the submittal). Please explain why the proposed licensee controlled specifications were not provided in the submittal.
- 7. Please clarify Table 1. The table identifies that the alarm and set-point data (referenced in IEEE 450-2002, Section 5.2.1, paragraphs G and J (noted in the above Table 1 to have no proposed specifications).
- 8. Regarding TS 5.25.2.16b, please confirm that the minimum established design limit refers to the minimum level mark on the cell jar and not the top of the plate.
- 9. Given that B 3.8-68 of the Bases indicates that if the electrolyte level is discovered to be below the top of the plates, the battery must be equalized and tested to confirm
operability, it appears that LCO 3.8.6, Condition C, should have one more required action (C.4) which would mandate this equalizing and testing. Please justify not having this required action (Note: The notes preceding Required Action C.1 may need to be modified to include this Required Action C.4.).
San Onofre Nuclear Generating Station Units 2 and 3 cc:
Mr. Daniel P. Breig Resident Inspector/San Onofre NPS Southern California Edison Company c/o U.S. Nuclear Regulatory Commission San Onofre Nuclear Generating Station Post Office Box 4329 P. O. Box 128 San Clemente, CA 92674 San Clemente, CA 92674-0128 Mayor Mr. Douglas K. Porter, Esquire City of San Clemente Southern California Edison Company 100 Avenida Presidio 2244 Walnut Grove Avenue San Clemente, CA 92672 Rosemead, CA 91770 Mr. James T. Reilly Mr. David Spath, Chief Southern California Edison Company Division of Drinking Water and San Onofre Nuclear Generating Station Environmental Management P.O. Box 128 P. O. Box 942732 San Clemente, CA 92674-0128 Sacramento, CA 94234-7320 Mr. James D. Boyd, Commissioner Chairman, Board of Supervisors California Energy Commission County of San Diego 1516 Ninth Street (MS 31) 1600 Pacific Highway, Room 335 Sacramento, CA 95814 San Diego, CA 92101 Mr. Ray Waldo, Vice President Eileen M. Teichert, Esq. Southern California Edison Company Supervising Deputy City Attorney San Onofre Nuclear Generating Station City of Riverside P.O. Box 128 3900 Main Street San Clemente, CA 92764-0128 Riverside, CA 92522 Mr. Brian Katz Mr. Gary L. Nolff Southern California Edison Company Power Projects/Contracts Manager San Onofre Nuclear Generating Station Riverside Public Utilities P.O. Box 128 2911 Adams Street San Clemente, CA 92764-0128 Riverside, CA 92504 Mr. Steve Hsu Regional Administrator, Region IV Department of Health Services U.S. Nuclear Regulatory Commission Radiologic Health Branch 611 Ryan Plaza Drive, Suite 400 MS 7610, P.O. Box 997414 Arlington, TX 76011-8064 Sacramento, CA 95899 Mr. Michael Olson Mr. A. Edward Scherer San Diego Gas & Electric Company Southern California Edison Company P.O. Box 1831 San Onofre Nuclear Generating Station San Diego, CA 92112-4150 P.O. Box 128 San Clemente, CA 92674-0128 Mr. Ed Bailey, Chief Radiologic Health Branch State Department of Health Services Post Office Box 997414 (MS7610)