ML043490176

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual, Volume I
ML043490176
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/08/2004
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML043490176 (17)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 12/08/04 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 72 11 IR 12/08/04 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: cb1461 001

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 72 dated 12/08/04 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 71 has been inserted prior to inserting these pages.

Location Remove Insert In Front of TRM Manual Title Page Rev 71 11/30/04 Title Page Rev 72 12/08/04 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP- 4 Rev 71 11/30/04 LEP-1 through LEP- 4 Rev 72 12/08/04 3 TRLCO Applicability Page TRM 3.0-2 Rev 63 Page TRM 3.0-2 Rev 72 Page TRM 3.04 Rev 31 Page TRM 3.04 Rev 72 3.3 Instrumentation Page TRM 3.3-37 Rev 31 Page TRM 3.3-37 Rev 72 Page TRM 3.3-44 Rev 31 Page TRM 3.3-44 Rev 72 3.7 Plant Systems Page TRM 3.7-12 Rev 31 Page TRM 3.7-12 Rev 72 BASES B3.0 TRLCO Page TRM B3.0-2a Rev 63 Page TRM B3.0-2a Rev 72 Applicability Page TRM B3.0-2b Rev 63 Page TRM B 3.0-2b Rev 72 Page TRM B 3.0-2c Rev 72 Page TRM B3.0-6 Rev 54 Page TRM B 3.0-6 Rev 72 Page TRM B3.0-7 Rev 54 Page TRM B 3.0-7 Rev 72 END

i Fermi 2 Technical Requirements Manual Volume I Detroit Edison

_-N ARMS - INFORVA TION DTC: TMTRM l File: 1754 IDSN: TRM VOL I I Rev: 72

. Date 12/08/04 l Recipient 35

FERMI 2 - TECHNICAL REQlUIEMENTS MAN!UAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRN i Revision 31 TEN 3.3-31 Revision 31 TRM ii Revision 70 TRM 3.3-32 Revision 31 TRM iii Revision 31 TRM 3.3-33 Revision 31 TRM iv Revision 34 TRM 3.3-34 Revision 31 TRM v Revision 70 TRM 3.3-35 Revision 60 TRM vi Revision 31 TRM 3.3-36 Revision 41 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72 TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56 TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-1 Revision 34 TRN 3.4-1a Revision 71 TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71 TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31

  • TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-13 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 66 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM Vol. I LEP-1 REV 72 12/08/04

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM Vol. I LEP-2 REV 72 12/08/04

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-5 Revision 31 TRM B3.4.7-1 Revision 31 TRM 5.0-6 Revision 31 TRM B3.5-1 Revision 31 TRM 5.0-7 Revision 31 TRM B3.6.1-1 Revision 31 TRM 5.0-8 Revision 31 TRM B3.6.2-1 Revision 67 TRM 5.0-9 Revision 31 TRM B3.6.3-1 Revision 68 TRM Bl.0-1 Revision 31 TRM B3.6.4-1 Revision 31 TRM B2.0-1 Revision 31 TRM B3.6.5-1 Revision 31 TRM B3.0-1 Revision 63 TRM B3.6.6-1 Revision 70 TRM B3.0-2 Revision 63 TRM B3.6.7-1 Revision 31 TRM B3.0-2a Revision 72 TRM *B3.6.8-1 Revision 31 TRM B3.0-2b Revision 72 TRM B3.7.1-1 Revision 31 TRM B3.0-2c Revision 72 TRM B3.7.2-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.7.3-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.4-1 Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.4-2 Revision 31 TRM B3.0-6 Revision 72 TRM B3.7.5-1 Revision 31 TRM B3.0-7 Revision 72 TRM B3.7.6-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.7-1 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.9-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3.7.9-2 Revision 31 TRM B3.3.2-1 Revision 31 TRM B3.8.1-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.3-1 Revision 67 TRM B3.8.3-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.4-2 Revision 31 TRM B3.8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TRM B3.8.6-1 Revision 43 TRM B3.3.5-2 Revision 3i TRM B3.9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-2 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.4-1 Revision 31 TRM B3.3.6-4 Revision 31 TRM B3.10-1 Revision 31 TRM B3.3.6-5 Revision 31 TRM B3.11.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.12.1-1 Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.2-1 Revision 44 TRM B3.3.8-1 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.9-1 Revision 31

  • TRM B3.12.4-1 Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.12.5-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.6-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.12.8-1 Revision 31 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM B3.4.6-1 Revision 31 TRM Vol. I BEP-3 REV 72 12/08/04

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 11, Revision 0 Page Revision Notation Page 1 0 2 0 3 0.

4 0 5 0 6 0 7 0 8 0

.9 0 10 0 11 0 12 0 13 0 14 0 15* 0 16 0 17 0 18 0 19 0 20 0 21 0 22 0 TRM Vol. I LEP-4 REV 72 12/08/04

Applicability TR 3.0 TR 3.0 TRLCO APPLICABILITY (continued)

TRLCO 3.0.4 When a TRLCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time, or
b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to -

comply with ACTIONS or that are part of a shutdown of the unit.

TRCLO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to TRLCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

TRM Vol. I TRM 3.0-2 REV 72 12/04

Applicability TR 3.0 TR 3.0 TRSR APPLICABILITY (continued)

TRSR 3.0.4 Entry into a MODE or other specified condition in the Applicability of a TRLCO shall only be made when the TRLCO's Surveillances have been met within their specified Frequency, except as provided by TRSR 3.0.3. When a TRLCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with TRLCO 3.0.4.

This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with Actions or that are part of a shutdown of the unit.

TRM Vol. I TRM 3.0-4 REV 72 12/04

- t-Appendix R Alternative Shutdown Instrumentation TR 3.3.9 TR 3.3 INSTRUMENTATION TR 3.3.9 Appendix R Alternative Shutdown Instrumentation TRLCO 3.3.9 The alternative shutdown instrumentation channels shown in Table TR3.3.9-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOTE--------------------------------------

Separate Condition entry is allowed for each Function.

I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Enter the Condition Immediately with one required referenced in Table channel inoperable. TR3.3.9-1 for the Channel.

B. As required by B.1 Declare CTG 11-1 Immediately Required Action A.1 inoperable.

and referenced in Table TR3.3.9-1. AND B.2 Enter the applicable Immediate Conditions and Required Actions of TR 3.7.7.

C. As required by C.1 Declare SBFW System Immediately Required Action A.1 inoperable.

and referenced in Table TR3.3.9-1. AND C.2 Enter the applicable' Immediately Conditions and .

Required Actions of TR 3.7.7.

(continued)

TRM Vol. I TRM 3.3-37 REV 72 12/04

Explosive Gas Monitoring Instrumentation TR 3.3.12 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Submit a Corrective Immediately associated Completion Action Document Time of Required explaining why the Action A.3 not met. inoperability was not corrected in a timely manner.

D. Offgas hydrogen D.1 Restore hydrogen 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> I concentration not concentration to within limit. within the limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.3.12.1 Perform CHANNEL CHECK of the hydrogen 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> monitor.

TRSR 3.3.12.2 Perform CHANNEL FUNCTIONAL TEST of the 31 days hydrogen monitor.

TRSR 3.3.12.3 Perform CHANNEL CALIBRATION of the hydrogen 92 days monitor. The alarm setpoint shall be < 4%

hydrogen by volume. Include the use of standard gas samples containing a nominal:

a. One volume percent hydrogen, balance nitrogen, and
b. Four volume percent hydrogen, balance nitrogen.

TRM Vol. I TRM 3.3-44 REV 72 12/04

Appendix R Alternative Shutdown Auxiliary Systems TR 3.7.7 TR 3.7 PLANT SYSTEMS TR 3.7.7 Appendix R Alternative Shutdown Auxiliary Systems TRLCO 3.7.7 The Appendix R Alternative Shutdown auxiliary systems shall be OPERABLE as described below:

a. A Standby Feedwater (SBFW) system consisting of two OPERABLE SBFW pumps and an OPERABLE flow path from the condensate storage tank to the reactor vessel.
b. An OPERABLE CTG 11 Unit 1 and power train capable of supplying power to the Peaker Bus.
c. Two OPERABLE Drywell Cooling Units (Units 1 and 2) consisting of a fan and cooling coil capable of being supplied with cooling water from the EECW system.
d. The OPERABLE Appendix R Alternative Shutdown control circuits listed in Table TR3.7.7-1 that support OPERABLE Appendix R Alternative Shutdown auxiliary systems.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS I

CONDITION REQUIRED ACTION COMPLETION TIME A. One SBFW pump A.1 Perform TRSR 3.7.7.4 7 days inoperable. using the OPERABLE pump. AND Once per 31 days thereafter B. SBFW system inoperable B.1 Restore SBFW system 7 days for reasons other than to OPERABLE status.

Condition A.

(continued)

TRM Vol. I TRM 3.7-12 REV 72 12/04

TRLCO Applicability TR B3.0 BASES TRLCO 3.0.4 TRLCO 3.0.4 establishes limitations on changes in MODES or other specified conditions in the Applicability when a TRLCO is not met. It allows placing the unit in a MODE or other specified condition stated in that Applicability (e.g., the Applicability desired to be entered) when unit conditions are such that the requirements of the TRLCO would not be met, in accordance with LCO 3.0.4.a or LCO 3.0.4.b.

TRLCO 3.0.4.a allows entry into a MODE or other specified condition in the Applicability with the' LCO not met when the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time. Compliance with Required Actions that permit continued operation of the unit for an unlimited period of time in a MODE or other specified condition provides an acceptable level of safety for continued operation. This is without regard to the status of the unit before or after the MODE change. Therefore, in such cases, entry into a MODE or other specified condition in the Applicability may be made in accordance with the provisions of the Required Actions.

TRLCO 3.0.4.b allows entry into a MODE or other specified condition in the Applicability with the LCO not met after performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate.

The risk assessment may use quantitative, qualitative, or blended approaches, and the risk assessment will be conducted using the plant program, procedures, and criteria in place to implement 10 CFR 50.65(a)(4), which requires that risk impacts of maintenance activities to be assessed and managed. The risk assessment, for the purposes of TRLCO 3.0.4 (b), must take into account all inoperable Technical Specification equipment regardless of whether the equipment is included in the normal 10 CFR 50.65(a)(4) risk assessment scope. The risk assessments will be conducted using the procedures and guidance endorsed by Regulatory Guide 1.182, "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants." Regulatory Guide 1.182 endorses the guidance in Section 11 of NUMARC 93-01, "Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." These documents address general guidance for conduct of the risk assessment, quantitative and qualitative guidelines for establishing risk management actions, and example risk management actions. These include actions to plan and conduct other activities in a manner that controls overall risk, increased risk awareness by shift and management personnel, actions to reduce the duration of the condition, actions to minimize the magnitude of risk increases (establishment of backup success paths or compensatory measures), and determination that the proposed MODE change is acceptable. Consideration should also be given to the probability of completing restoration such that the (continued)

TRM Vol. I, TRM B3.0-2a REV 72 12/04

TRLCO Applicability TR B3.0 BASES TRLCO 3.0.4 requirements of the TRLCO would be met prior to the expiration (Continued) of ACTIONS Completion Times that would require exiting the Applicability.

TRLCO 3.0.4.b may be used with single, or multiple systems and components unavailable. NUMARC 93-01 provides guidance relative to consideration of simultaneous unavailability of multiple systems and components.

The results of the risk assessment shall be considered in determining the acceptability of entering the MODE or other specified condition in the Applicability, and any corresponding risk management actions. The TRLCO 3.0.4.b risk assessments do not have to be documented.

The TRM Specifications allow continued operation with equipment unavailable in MODE 1 for the duration of the Completion Time.

Since this is allowable, and since, in general, the risk impact in that particular MODE bounds the risk of transitioning into and through the applicable MODES or other specified conditions in the Applicability of the TRLCO, the use of the TRLCO 3.0.4.b allowance should be generally acceptable, as long as the risk is assessed and managed as stated above.

The provisions of this Specification should not be interpreted as endorsing the failure to exercise the good practice of restoring systems or components to OPERABLE status before entering an associated MODE or other specified condition in the Applicability.

The provisions of TRLCO 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS.' In addition, the provisions of TRLCO 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that result from any unit shutdown. In this context, a unit shutdown is defined as a change in MODE or other specified condition in the Applicability associated with transitioning from MODE 1 to MODE 2, MODE 2 to MODE 3, and MODE 3 to MODE 4.

Upon entry into a MODE or other specified condition in the Applicability with the TRLCO-not met, TRLCO 3.0.1 and TRLCO 3.0.2 require entry into the applicable Conditions and Required Actions until the Condition is resolved, until the TRLCO is met, or until the unit is not within the Applicability of the Specification.

Surveillances do not have to be performed on the associated inoperable equipment (or on variables outside the specified limits), as permitted by TRSR 3.0.1. Therefore, utilizing TRLCO 3.0.4 is not a violation of TRSR 3.0.1 or TRSR 3.0.4 for any Surveillances that have not been performed on inoperable equipment. However, TRSRs must be met to ensure OPERABILITY

  • prior to declaring the associated equipment OPERABLE (or variable within limits) and restoring compliance with the affected TRLCO.

(continued)

TRM Vol. I TRM B3.0-2b REV 72 12/04

TRLCO Applicability TR B3.0 BASES TRLCO 3.05 LCO 3.0.5 establishes the allowance for restoring equipment to service under administrative controls when it has been removed from service or declared inoperable to comply with ACTIONS. The sole purpose of this Specification is to provide an exception to LCO 3.0.2 (e.g., to not comply with the applicable Required Action(s)) to allow the performance of required testing to demonstrate:

a. The OPERABILITY of the equipment being returned to service; or
b. The OPERABILITY of other equipment.

The administrative controls ensure the time the equipment is returned to service in conflict with the requirements of the ACTIONS is limited to the time absolutely necessary to perform the required testing to demonstrate OPERABILITY. This Specification does not provide time to perform any other preventive or corrective maintenance.

An example of demonstrating the OPERABILITY of the equipment being returned to service is reopening a containment isolation valve that has been closed to comply with Required Actions and must be reopened to perform the-required testing.

An example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to prevent the trip function from occurring during the performance of required testing on another channel in the other trip system. A similar example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to permit the logic to function and indicate the appropriate response during the performance of required testing on another channel in the same trip system.

TRM Vol. I TRM B3.0-2c REV 72 12/04 l

TRSR Applicability TR B3.0 BASES TRSR 3.0.3 assumptions, in addition to unit conditions, planning, (continued) availability of personnel, and the time required to perform the Surveillance. This risk impact should be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, NRC Regulatory Guide 1.182, "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants." This Regulatory Guide addresses consideration of temporary and aggregate risk impacts, determination of risk management action thresholds, and risk management action up to and including plant shutdown. The missed Surveillance should be treated as an emergent condition as discussed in the Regulatory Guide. The risk evaluation may use quantitative, qualitative, or blended methods. The degree of depth and rigor of the evaluation should be commensurate with the importance of the component. Missed Surveillances for important components should be analyzed quantitatively. If. the results of the risk evaluation determine the risk increase is significant, this evaluation should be used to determine the safest course of action. All missed Surveillances will be placed in the licensee's Corrective Action Program.

If a Surveillance is not completed within the allowed delay period, then the equipment is considered inoperable or the variable is considered outside the specified limits and the Completion Times of the Required Actions for the applicable TRLCO Conditions begin immediately upon expiration of the delay period. If a Surveillance is failed within the delay period, then the equipment is inoperable, or the variable is outside the specified limits and the Completion Times of the Required Actions for the applicable TRLCO Conditions begin immediately upon the failure of the Surveillance.

Completion of the Surveillance within the delay period allowed by this Specification, or within the Completion Time of the ACTIONS, restores compliance with TRSR 3.0.1.

TRSR 3.0.4 TRSR 3.0.4 establishes the requirement that all applicable SRs I must be met before entry into a MODE or other specified condition in the Applicability.

This Specification ensures that system and component OPERABILITY requirements and variable limits are met before entry into MODES or other specified conditions in the Applicability for which these systems and components ensure safe operation of the unit. The provisions of this I Specification should not be interpreted as endorsing the failure to exercise the good practice of restoring systems or components to OPERABLE status before entering an associated MODE or other specified condition in the Applicability.

A provision is included to allow entry into a MODE or other specified condition in the Applicability when a TRLCO is not met due to Surveillance not being met in accordance with TRLCO 3.0.4.

(continued)

TRM Vol. I TRM B3.0-6 REV 72 12/04

TRSR Applicability TR B3.0 BASES TRSR 3.0.4 However, in certain circumstances, failing to meet a TRSR will (continued) not result in TRSR 3.0.4 restricting a MODE change or other specified condition change. When a system, subsystem, division, component, device, or variable is inoperable or outside its specified limits, the associated TRSR(s) are not required to be performed per, TRSR 3.0.1, which states that I surveillances do not have to be performed on inoperable equipment. When equipment is inoperable, TRSR 3.0.4 does not apply to the associated TRSR(s) since the requirement for the TRSR(s) to be performed is removed. Therefore, failing to perform the Surveillance(s) within the specified Frequency does not result in a TRSR 3.0.4 restriction to changing MODES or other specified conditions of the Applicability. However, since the TRLCO is not met in this instance, TRLCO 3.0.4 will govern any restrictions that may (or may not) apply to MODE or other specified condition changes. TRSR 3.0.4 does not restrict changing MODES or other specified conditions of the Applicability when a Surveillance has not been performed within the specified Frequency, provided the requirement to declare the TRLCO not met has been delayed in accordance with TRSR 3.0.3.

The provisions of TRSR 3.0.4 shall not prevent entry into MODES I or other specified conditions in the Applicability that are required to comply with the ACTIONS. In addition, the provisions of TRSR 3.0.4 shall not prevent changes in MODES or I other specified conditions in the Applicability that result from any unit shutdown. In this context, a unit shutdown is defined as a change in MODE or other specified condition in the Applicability associated with transitioning from MODE 1 to MODE 2, MODE 2 to MODE 3, and MODE 3 to MODE 4.

The precise requirements for performance of TRSRs are specified such that exceptions to TRSR 3.0.4 are not necessary. The specific time frames and conditions necessary for meeting the TRSRs are specified in the Frequency, in the Surveillance, or both. This allows performance of Surveillances when the prerequisite condition(s) specified in a Surveillance procedure require entry into the MODE or other specified condition in the Applicability of the associated TRLCO prior to the performance or completion of a Surveillance. A Surveillance that could not be performed until after entering the TRLCO's Applicability, I would have its Frequency specified such that it is not "due" until the specific conditions needed are met. Alternately, the Surveillance may be stated in the form of a Note, as not I required (to be met or performed) until a particular event, condition, or time has been reached. Further discussion of the specific formats of TRSRs' annotation is found in Section 1.4, Frequency TRM Vol. I TRM B3.0-7 REV 72 12/04