ML040360715

From kanterella
Jump to navigation Jump to search
Post Irradiation Examination - Assembly HH80, Face 2, 10/18/03
ML040360715
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 10/18/2003
From:
TXU Electric
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040360715 (1)


Text

Peripheral Oxide Utility: Comanche 2 Cleaned Assembly: HH80 Face: 2 Date: 18-Oct-2003 Elevation R02 R03 R06 R08 R10 R12 R14 111.9 25.9 38.4 32.3 33.5 47.1 37.0 31.8 112.9 27.0 48.8 34.1 37.8 54.6 46.1 39.0 113.9 27.9 62.9 35.2 44.2 68.3 58.4 46.4 114.9 29.4 64.9 37.1 50.4 81.5 68.9 57.2 115.9 29.3 60.4 40.0 55.9 88.2 74.5 64.0 116.9 28.9 68.0 41.2 61.4 92.7 79.4 66.5 117.9 28.5 68.0 42.6 65.4 93.6 82.3 69.0 118.9 28.0 64.4 42.2 66.7 92.2 82.3 67.9 119.9 28.5 62.4 44.7 68.4 91.9 83.2 70.3 120.9 28.7 62.5 44.9 67.3 93.2 82.5 70.9 121.9 28.8 62.7 44.2 64.8 88.6 77.3 65.7 122.9 29.4 63.4 47.4 62.6 84.0 74.6 61.8 123.9 29.6 59.5 47.1 55.6 73.8 67.1 52.8 124.9 30.0 56.0 46.2 50.8 62.8 58.6 47.3 125.9 30.6 52.1 43.4 46.8 57.4 52.6 44.1 max 30.6 68.0 47.4 68.4 93.6 83.2 70.9

Peripheral Rod Oxide after Crud Clean (Comanche Pe 100.0 90.0 80.0 Oxide Thickness ( microns) 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0.0 20.0 40.0 60.0 80.0 Axial Elevation (inch)

FR2 FR3 FR6 FR8 FR10

manche Peak 2, FA HH80, FACE 2) 0 100.0 120.0 140.0 160.0 tion (inch)

R8 FR10 FR12 FR14