ML040360717
| ML040360717 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/21/2003 |
| From: | TXU Electric |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML040360717 (1) | |
Text
Peripheral Oxide Utility:
Comanche 2 Cleaned Assembly: HH83 Face:
3 Date:
21-Oct-2003 Elevation R02 R06 R08 R10 R12 R14 111.9 43.6 32.7 39.4 35.4 29.4 27.1 112.9 57.2 39.2 45.5 37.9 32.3 33.6 113.9 69.9 44.2 51.8 46.9 35.1 39.6 114.9 80.0 49.6 52.9 55.1 35.2 46.0 115.9 80.9 52.1 54.2 57.8 29.9 50.1 116.9 85.2 57.6 60.5 60.6 35.0 56.1 117.9 88.0 59.3 59.7 66.0 30.1 59.8 118.9 90.1 61.2 58.4 64.8 37.4 58.9 119.9 88.4 60.0 56.4 65.2 47.3 59.8 120.9 86.2 56.4 53.7 62.1 50.8 58.9 121.9 80.7 52.0 50.0 60.1 49.9 55.6 122.9 73.2 48.4 47.6 54.8 48.5 48.4 123.9 62.1 42.3 40.5 47.0 43.0 39.1 124.9 49.2 37.5 35.5 39.2 36.3 30.5 125.9 44.2 38.1 34.2 35.0 33.4 28.6 max 90.1 61.2 60.5 66.0 50.8 59.8 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 0.0 Oxide Thickness (microns)
Peripheral Rod Oxide After Crud Clean (Comanche Peak 2, FA HH83, FA 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 0.0 20.0 40.0 60.0 80.0 100.0 120.0 Axial Elevation (inch)
FR2 FR6 FR8 FR10 FR12 FR14
HH83, FACE 3) 120.0 140.0 160.0 FR14