CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation12 December 2023(Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring InstrumentationPost Accident Monitoring
CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 01815 August 202310CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018Operator Manual Action
L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments7 August 2023Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License AmendmentsCyber Security
Safeguards Contingency Plan
Fire Protection Program
CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements15 June 2023Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System RequirementsSafe Shutdown
CP-202200247, (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 01730 June 2022(CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017
ML22020A1794 November 2021Fall 2021 Steam Generator Tube Inspections Discussion Input
CP-202000462, Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 01629 September 2020Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 016Safe Shutdown
ML20153A7444 June 2020Review of the Fall 2018 Steam Generator Tube Inspection ReportCoronavirus
CP-201700033, Mitigating Strategies Assessment Flood Report, NEI 12-06, Appendix G, Revision 2, G.4.1 Path9 February 2017Mitigating Strategies Assessment Flood Report, NEI 12-06, Appendix G, Revision 2, G.4.1 PathSafe Shutdown
Ultimate heat sink
Internal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Minimum staff
CP-201600093, Transmittal of 10CFR50.59 Evaluation Summary Report 019, 10CFR72.48 Evaluation Summary Report 004, and Commitment Material Change Evaluation Report 01324 February 2016Transmittal of 10CFR50.59 Evaluation Summary Report 019, 10CFR72.48 Evaluation Summary Report 004, and Commitment Material Change Evaluation Report 013Safe Shutdown
Boric Acid
Operator Manual Action
Temporary Modification
Fuel cladding
ML16014A12522 January 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task ForceSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML15062A03025 February 2015Work Plan for Completing a Once Through Cooling Water Study for Total Dissolved Solids, Chlorides, and SulfatesGrab sample
CP-201401268, Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report21 October 2014Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day ReportNondestructive Examination
CP-201401027, 10CFR50.59 Evaluation Summary Report 018, 10CFR72.48 Evaluation Summary Report 003 and Commitment Material Change Evaluation Report 01227 August 201410CFR50.59 Evaluation Summary Report 018, 10CFR72.48 Evaluation Summary Report 003 and Commitment Material Change Evaluation Report 012Loop seal
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 519 June 2014Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5
Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5
Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5
Boric Acid
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Post Accident Monitoring
Hydrostatic
Coatings
Nondestructive Examination
FLEX
Loctite
Weak link
ML14189A54319 June 2014Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5Boric Acid
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Post Accident Monitoring
Hydrostatic
Coatings
Nondestructive Examination
FLEX
Loctite
Weak link
ML14189A53719 June 2014Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5Boric Acid
Fitness for Duty
Commercial Grade Dedication
Coatings
Anchor Darling
Grace period
Weak link
ML14189A53319 June 2014Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5Commercial Grade Dedication
Coatings
ML14189A53119 June 2014Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5Commercial Grade Dedication
Loctite
ML14189A50019 June 2014Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 519 June 2014Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5Boric Acid
Fire Barrier
Commercial Grade Dedication
Post Accident Monitoring
Hydrostatic
Coatings
Nondestructive Examination
FLEX
Loctite
Weak link
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 519 June 2014Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5
Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5
Boric Acid
Fitness for Duty
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Post Accident Monitoring
Hydrostatic
Coatings
Anchor Darling
Nondestructive Examination
FLEX
Grace period
Loctite
Weak link
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 519 June 2014Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5
Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5
Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5
Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5
Boric Acid
Fire Barrier
Commercial Grade Dedication
Post Accident Monitoring
Hydrostatic
Coatings
Nondestructive Examination
FLEX
Loctite
Weak link
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 519 June 2014Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5
Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5
Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5
Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5
Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5
CP-201400324, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentUltimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML14036A0367 March 2014Staff Assessments of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
CP-201301238, Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report15 October 2013Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day ReportCoatings
Nondestructive Examination
ML12159A28811 June 2012Review of 60-day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Related to Fukushima Dai-ichi AccidentFukushima Dai-Ichi
Earthquake
ML12080A1436 March 2012CPNPP Systems Annual Operator Employment Notices
ML12080A1506 March 2012Submittal of Stc Annual Operator Employment Notices
CP-201101257, Submittal of Operator Licensing Examination Data21 September 2011Submittal of Operator Licensing Examination DataGeneric Fundamentals Examination
CP-201101169, CFR50.59 Evaluation Summary Report 016, 10CFR72.48 Evaluation Summary Report 001, and Commitment Material Change Evaluation Report 01022 August 2011CFR50.59 Evaluation Summary Report 016, 10CFR72.48 Evaluation Summary Report 001, and Commitment Material Change Evaluation Report 010Tornado Generated Missile
Earthquake
Fuel cladding
ML10342065117 September 2010FEMA, Comanche Peak Nuclear Power Plant - After Action Report/Improvement Plan, Drill Date August 18, 2010, Radiological Emergency Preparedness (REP) Program
CPSES-201001000, Operator Licensing Examination Data, Form 53628 July 2010Operator Licensing Examination Data, Form 536Generic Fundamentals Examination
ML1000700043 December 2009After Action Report/Improvement Plan, Drill Date - December 03, 2009
CP-200901404, Core Operating Limits2 November 2009Core Operating LimitsShutdown Margin
CP-200900474, Property Damage Insurance, Summary Report26 March 2009Property Damage Insurance, Summary Report
CP-200900127, Guarantees of Payment of Deferred Premiums19 January 2009Guarantees of Payment of Deferred Premiums
CP-200900010, Core Flux Maps Data, Cycle 117 January 2009Core Flux Maps Data, Cycle 11
CP-200800805, Report of Unusual or Important Environmental Event, Operating License, Appendix B, Environmental Protection Plan (Non Radiological) - Mortality of Avian Species4 June 2008Report of Unusual or Important Environmental Event, Operating License, Appendix B, Environmental Protection Plan (Non Radiological) - Mortality of Avian Species
CP-200800612, Commanche Peak, Units 1 & 2 - Transmittal of Revised Pressure and Temperature Limits Report24 April 2008Commanche Peak, Units 1 & 2 - Transmittal of Revised Pressure and Temperature Limits ReportHydrostatic
Pressure and Temperature Limits Report
CP-200800609, Pressurizer Weld Overlay 60 Day Report and Results of the Final Pdi/Ut Examination of Weld Overlays24 April 2008Pressurizer Weld Overlay 60 Day Report and Results of the Final Pdi/Ut Examination of Weld OverlaysWeld Overlay
DM weld
CP-200800213, Response to Request for Additional Information26 February 2008Response to Request for Additional InformationFlow Induced Vibration
CPSES-200700454, Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data28 February 2007Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance DataFitness for Duty
CPSES-200601738, Transmittal of First-Half 2006 Fitness-For-Duty Program Performance Data31 August 2006Transmittal of First-Half 2006 Fitness-For-Duty Program Performance Data
CPSES-200600154, Transmittal of Unit 2 Inservice Inspection Program Plan, Revision 22 August 2006Transmittal of Unit 2 Inservice Inspection Program Plan, Revision 2High Radiation Area
Hydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
ML06205001217 July 2006Attachment 1 to TXX-0612 Response to Requests for Additional Information for the Replacement Steam Generator Supplement to Txu Power'S Large and Small Break Loss of Coolant Accident Analysis Methodologies, Pages 1 Through 74Boric Acid
Loop seal
ML07023039610 April 2006Report 06-0413 Chart 250-200
ML0702303926 April 2006Report 06-0413 Chart 7
ML0702303956 April 2006Report 06-0413 Chart 120-307