Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation | 12 December 2023 | (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation | Post Accident Monitoring |
CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 | 15 August 2023 | 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 | Operator Manual Action |
L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 7 August 2023 | Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | Cyber Security Safeguards Contingency Plan Fire Protection Program |
CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements | 15 June 2023 | Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements | Safe Shutdown |
CP-202200247, (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017 | 30 June 2022 | (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017 | |
ML22020A179 | 4 November 2021 | Fall 2021 Steam Generator Tube Inspections Discussion Input | |
CP-202000462, Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 016 | 29 September 2020 | Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 016 | Safe Shutdown |
ML20153A744 | 4 June 2020 | Review of the Fall 2018 Steam Generator Tube Inspection Report | Coronavirus |
CP-201700033, Mitigating Strategies Assessment Flood Report, NEI 12-06, Appendix G, Revision 2, G.4.1 Path | 9 February 2017 | Mitigating Strategies Assessment Flood Report, NEI 12-06, Appendix G, Revision 2, G.4.1 Path | Safe Shutdown Ultimate heat sink Internal Flooding Hydrostatic FLEX Fukushima Dai-Ichi Minimum staff |
CP-201600093, Transmittal of 10CFR50.59 Evaluation Summary Report 019, 10CFR72.48 Evaluation Summary Report 004, and Commitment Material Change Evaluation Report 013 | 24 February 2016 | Transmittal of 10CFR50.59 Evaluation Summary Report 019, 10CFR72.48 Evaluation Summary Report 004, and Commitment Material Change Evaluation Report 013 | Safe Shutdown Boric Acid Operator Manual Action Temporary Modification Fuel cladding |
ML16014A125 | 22 January 2016 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML15062A030 | 25 February 2015 | Work Plan for Completing a Once Through Cooling Water Study for Total Dissolved Solids, Chlorides, and Sulfates | Grab sample |
CP-201401268, Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report | 21 October 2014 | Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report | Nondestructive Examination |
CP-201401027, 10CFR50.59 Evaluation Summary Report 018, 10CFR72.48 Evaluation Summary Report 003 and Commitment Material Change Evaluation Report 012 | 27 August 2014 | 10CFR50.59 Evaluation Summary Report 018, 10CFR72.48 Evaluation Summary Report 003 and Commitment Material Change Evaluation Report 012 | Loop seal |
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | Boric Acid Non-Destructive Examination Fire Barrier Commercial Grade Dedication Post Accident Monitoring Hydrostatic Coatings Nondestructive Examination FLEX Loctite Weak link |
ML14189A543 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | Boric Acid Non-Destructive Examination Fire Barrier Commercial Grade Dedication Post Accident Monitoring Hydrostatic Coatings Nondestructive Examination FLEX Loctite Weak link |
ML14189A537 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 | Boric Acid Fitness for Duty Commercial Grade Dedication Coatings Anchor Darling Grace period Weak link |
ML14189A533 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 | Commercial Grade Dedication Coatings |
ML14189A531 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 | Commercial Grade Dedication Loctite |
ML14189A500 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 | |
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | Boric Acid Fire Barrier Commercial Grade Dedication Post Accident Monitoring Hydrostatic Coatings Nondestructive Examination FLEX Loctite Weak link |
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | Boric Acid Fitness for Duty Non-Destructive Examination Fire Barrier Commercial Grade Dedication Post Accident Monitoring Hydrostatic Coatings Anchor Darling Nondestructive Examination FLEX Grace period Loctite Weak link |
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | Boric Acid Fire Barrier Commercial Grade Dedication Post Accident Monitoring Hydrostatic Coatings Nondestructive Examination FLEX Loctite Weak link |
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | |
CP-201400324, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 27 March 2014 | Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML14036A036 | 7 March 2014 | Staff Assessments of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
CP-201301238, Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report | 15 October 2013 | Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report | Coatings Nondestructive Examination |
ML12159A288 | 11 June 2012 | Review of 60-day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Related to Fukushima Dai-ichi Accident | Fukushima Dai-Ichi Earthquake |
ML12080A143 | 6 March 2012 | CPNPP Systems Annual Operator Employment Notices | |
ML12080A150 | 6 March 2012 | Submittal of Stc Annual Operator Employment Notices | |
CP-201101257, Submittal of Operator Licensing Examination Data | 21 September 2011 | Submittal of Operator Licensing Examination Data | Generic Fundamentals Examination |
CP-201101169, CFR50.59 Evaluation Summary Report 016, 10CFR72.48 Evaluation Summary Report 001, and Commitment Material Change Evaluation Report 010 | 22 August 2011 | CFR50.59 Evaluation Summary Report 016, 10CFR72.48 Evaluation Summary Report 001, and Commitment Material Change Evaluation Report 010 | Tornado Generated Missile Earthquake Fuel cladding |
ML103420651 | 17 September 2010 | FEMA, Comanche Peak Nuclear Power Plant - After Action Report/Improvement Plan, Drill Date August 18, 2010, Radiological Emergency Preparedness (REP) Program | |
CPSES-201001000, Operator Licensing Examination Data, Form 536 | 28 July 2010 | Operator Licensing Examination Data, Form 536 | Generic Fundamentals Examination |
ML100070004 | 3 December 2009 | After Action Report/Improvement Plan, Drill Date - December 03, 2009 | |
CP-200901404, Core Operating Limits | 2 November 2009 | Core Operating Limits | Shutdown Margin |
CP-200900474, Property Damage Insurance, Summary Report | 26 March 2009 | Property Damage Insurance, Summary Report | |
CP-200900127, Guarantees of Payment of Deferred Premiums | 19 January 2009 | Guarantees of Payment of Deferred Premiums | |
CP-200900010, Core Flux Maps Data, Cycle 11 | 7 January 2009 | Core Flux Maps Data, Cycle 11 | |
CP-200800805, Report of Unusual or Important Environmental Event, Operating License, Appendix B, Environmental Protection Plan (Non Radiological) - Mortality of Avian Species | 4 June 2008 | Report of Unusual or Important Environmental Event, Operating License, Appendix B, Environmental Protection Plan (Non Radiological) - Mortality of Avian Species | |
CP-200800612, Commanche Peak, Units 1 & 2 - Transmittal of Revised Pressure and Temperature Limits Report | 24 April 2008 | Commanche Peak, Units 1 & 2 - Transmittal of Revised Pressure and Temperature Limits Report | Hydrostatic Pressure and Temperature Limits Report |
CP-200800609, Pressurizer Weld Overlay 60 Day Report and Results of the Final Pdi/Ut Examination of Weld Overlays | 24 April 2008 | Pressurizer Weld Overlay 60 Day Report and Results of the Final Pdi/Ut Examination of Weld Overlays | Weld Overlay DM weld |
CP-200800213, Response to Request for Additional Information | 26 February 2008 | Response to Request for Additional Information | Flow Induced Vibration |
CPSES-200700454, Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data | 28 February 2007 | Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data | Fitness for Duty |
CPSES-200601738, Transmittal of First-Half 2006 Fitness-For-Duty Program Performance Data | 31 August 2006 | Transmittal of First-Half 2006 Fitness-For-Duty Program Performance Data | |
CPSES-200600154, Transmittal of Unit 2 Inservice Inspection Program Plan, Revision 2 | 2 August 2006 | Transmittal of Unit 2 Inservice Inspection Program Plan, Revision 2 | High Radiation Area Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
ML062050012 | 17 July 2006 | Attachment 1 to TXX-0612 Response to Requests for Additional Information for the Replacement Steam Generator Supplement to Txu Power'S Large and Small Break Loss of Coolant Accident Analysis Methodologies, Pages 1 Through 74 | Boric Acid Loop seal |
ML070230396 | 10 April 2006 | Report 06-0413 Chart 250-200 | |
ML070230392 | 6 April 2006 | Report 06-0413 Chart 7 | |
ML070230395 | 6 April 2006 | Report 06-0413 Chart 120-307 |