CPSES-200601738, Transmittal of First-Half 2006 Fitness-For-Duty Program Performance Data
| ML062490539 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/31/2006 |
| From: | Madden F TXU Generation Co, LP, TXU Power |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CPSES-200601738, TXX-06147 | |
| Download: ML062490539 (6) | |
Text
-:7.
- TXU Power TXU Power Comanche Peak Steam Bectric Station P.O. Box 1002 (E01)
Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins@txu.com Mike Blevins Senior Vice President &
Chief Nuclear Officer CPSES-200601738 Log # TXX-06147 August 31, 2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF FIRST-HALF 2006 FITNESS-FOR-DUTY PROGRAM PERFORMANCE DATA Gentlemen:
Attached are CPSES Fitness-For-Duty Program Performance data for the six month period of January 1, 2006 through June 30, 2006. The data required by IOCFR26.71 (d) are provided on standard forms with the exception of the summary of management actions and list of events reported, which are provided on a separate page titled "Summary of Management Action."
This communication contains no new or revised commitments.
If there are any questions, please contact Mr. James Brown at (254) 897-8912.
1402-1 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak Diablo Canyon
- Palo Verde
- South Texas Project e
Wolf Creek
TXX-06147 Page 2 of 2 Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC Its General Partner Mike Blevins By:
- 22*
g,-
/flred W. Madden Director, Regulatory Affairs NSH Attachments c -
B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES
Attachments to TXX-06147 (3 Pages)
Performance Data Personnel Subject to 10 CFR 26 TXU Power Company Comanche Peak Steam Electric Station June 30, 2006 6 Months Ending Location Greg Bell, Security (254)897-5290 Contact Nar Cutoffs:
Screen/Confirmation (ng/rr Marijuana 50 i 15 Cocaine 300 I 150 Opiates 300 I 300 Phone (including area code)
El Appendix A to 10 CFR 26 Amphetamines 1000 / 500 Phencyclidine 25
/ 25 Alcohol (% BAC) 0.04%
Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 713 774 Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 70 0
0 0
129 1
For Cause Post-accident 0
0 0
0 0
0 Observed behavior 1
0 0
0 0
0 Random 346 0
0 0
129 0
Follow-up 0
0 0
0 2
0 Other*
10 0
0 0
10 0
Total 427 0
0 0
270 1
Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal 1
2 3
4 5
tamines clidine to Test Licensee Employees 0
0 0
0 0
0 0
Long-Term Contractors 0
0 0
0 0
0 0
Short Term Contractors 0
0 0
0 0
1 0
A-..
Total 0
1 0
1 0
1 0
1 0
1-1 1
1 1
1 11 1
SUMMARY
OF MANAGEMENT ACTIONS And STATISTICAL ANALYSIS FOR REPORTING PERIOD JANUARY THROUGH JUNE 2006 Analysis of the data indicates that about 32 percent of the average eligible population was randomly tested during the reporting period.
The total positive tests for this period were 1. The test was classified as a pre-access test. Short-term contractor personnel accounted for the positive test.
TXU Power submitted blind performance specimens in accordance with 10 CFR 26, Appendix A, Section 2.8 (e)(2), requirements. There were no reportable events.
No events were reported by telephone under 10CFR26.73.