Category:Letter type:CP
MONTHYEARCP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters CP-202400107, (CPNPP) - 2023 Annual Radiological Environmental Operating Report2024-04-18018 April 2024 (CPNPP) - 2023 Annual Radiological Environmental Operating Report CP-202400099, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters2024-04-0909 April 2024 (CPNPP) - Registration of Dry Spent Fuel Storage Canisters CP-202400092, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-04-0101 April 2024 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400089, Property Damage Insurance2024-03-25025 March 2024 Property Damage Insurance CP-202400087, (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable2024-03-21021 March 2024 (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable CP-202400085, (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-0707 March 2024 (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CP-202400073, (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-03-0404 March 2024 (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400072, (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation2024-02-29029 February 2024 (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300470, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown CP-202300474, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions CP-202400063, (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23)2024-02-12012 February 2024 (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23) CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300533, (CPNPP) - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-14014 November 2023 (CPNPP) - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program2023-09-15015 September 2023 (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2023-08-24024 August 2023 (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report2023-08-17017 August 2023 (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)2023-08-17017 August 2023 (Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1122023-08-0101 August 2023 (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application – Sets 2 and 32023-07-27027 July 2023 Response to Requests for Additional Information Regarding Review of the License Renewal Application – Sets 2 and 3 CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)2023-07-18018 July 2023 (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 22023-06-20020 June 2023 Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 12023-06-13013 June 2023 Response to Request for Additional Information Regarding License Renewal Application - Set 1 CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review2023-06-0606 June 2023 Response to Request for Additional Information - License Renewal Application Environmental Review CP-202300207, Revision to Comanche Peak Nuclear Power Plants Response to Notice of Violation (NOV) 05000445/2021011-052023-05-25025 May 2023 Revision to Comanche Peak Nuclear Power Plants Response to Notice of Violation (NOV) 05000445/2021011-05 CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application2023-05-0808 May 2023 Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)2023-05-0404 May 2023 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0) CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Environmental Operating Report CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Effluent Release Report CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300175, Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)2023-04-20020 April 2023 Submittal of 2022 Annual Environmental Operating Report (Non-Radiological) 2024-09-12
[Table view] Category:Report
MONTHYEARML24136A1352024-07-30030 July 2024 LRA - Record of Decision ML23355A2682023-12-21021 December 2023 NRC Comments - Comanche Peak LRA Supplement 3 (1) CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report2022-11-0303 November 2022 (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report CP-202200247, (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 0172022-06-30030 June 2022 (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017 ML22020A1792021-11-0404 November 2021 Fall 2021 Steam Generator Tube Inspections Discussion Input CP-202100127, Transmittal of Pressure and Temperature Limits Report, ERX-07-003, Revision 62021-03-16016 March 2021 Transmittal of Pressure and Temperature Limits Report, ERX-07-003, Revision 6 CP-202000462, Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 0162020-09-29029 September 2020 Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 016 ML20153A7442020-06-0404 June 2020 Review of the Fall 2018 Steam Generator Tube Inspection Report CP-201900467, (CPNPP) - Biennial Review of Procedures and Station Operations Review Committee Meetings2019-08-14014 August 2019 (CPNPP) - Biennial Review of Procedures and Station Operations Review Committee Meetings CP-201900378, Transmittal of Seventeenth Refueling Outage (2RF17) Steam Generator 180 Day Report2019-06-10010 June 2019 Transmittal of Seventeenth Refueling Outage (2RF17) Steam Generator 180 Day Report CP-201900126, Special Report 2-SR-19-001-00, Inoperable Post Accident Monitoring Instrumentation Report.2019-02-25025 February 2019 Special Report 2-SR-19-001-00, Inoperable Post Accident Monitoring Instrumentation Report. CP-201800652, Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report2018-09-12012 September 2018 Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report ML18044A0982018-02-0808 February 2018 Solid Waste Registration Number: 33306; Texas Waste Code: 37043902; Reference Number: 15749 CP-201700805, Sixteenth Refueling Outage (2RF16) Steam Generator 180 Day Report2017-10-30030 October 2017 Sixteenth Refueling Outage (2RF16) Steam Generator 180 Day Report CP-201700223, Decommissioning Funding Status Report for Financial Assurance as of 12/31/20162017-03-30030 March 2017 Decommissioning Funding Status Report for Financial Assurance as of 12/31/2016 CP-201700033, Mitigating Strategies Assessment Flood Report, NEI 12-06, Appendix G, Revision 2, G.4.1 Path2017-02-0909 February 2017 Mitigating Strategies Assessment Flood Report, NEI 12-06, Appendix G, Revision 2, G.4.1 Path CP-201600097, Westinghouse LTR-PAFM-16-2-NP, Technical Justification to Support Extended Volumetric Examination Interval for Comanche Peak Unit 1 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-02-29029 February 2016 Westinghouse LTR-PAFM-16-2-NP, Technical Justification to Support Extended Volumetric Examination Interval for Comanche Peak Unit 1 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. CP-201600093, Transmittal of 10CFR50.59 Evaluation Summary Report 019, 10CFR72.48 Evaluation Summary Report 004, and Commitment Material Change Evaluation Report 0132016-02-24024 February 2016 Transmittal of 10CFR50.59 Evaluation Summary Report 019, 10CFR72.48 Evaluation Summary Report 004, and Commitment Material Change Evaluation Report 013 ML16014A1252016-01-22022 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ML16047A3302016-01-20020 January 2016 NEI 12-01 Phase 2 Staffing Assessment, Revision 1 ML15062A0302015-02-25025 February 2015 Work Plan for Completing a Once Through Cooling Water Study for Total Dissolved Solids, Chlorides, and Sulfates CP-201401268, Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report2014-10-21021 October 2014 Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report CP-201401027, 10CFR50.59 Evaluation Summary Report 018, 10CFR72.48 Evaluation Summary Report 003 and Commitment Material Change Evaluation Report 0122014-08-27027 August 2014 10CFR50.59 Evaluation Summary Report 018, 10CFR72.48 Evaluation Summary Report 003 and Commitment Material Change Evaluation Report 012 ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 CP-201400335, . Pressure and Temperature Limits Report2014-04-0808 April 2014 . Pressure and Temperature Limits Report CP-201400324, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-03-27027 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14036A0362014-03-0707 March 2014 Staff Assessments of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML13225A5752013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13338A6612013-12-18018 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Comanche Peak Nuclear Power Plant, TAC Nos.: MF0860 and MF0861 ML13309A0272013-10-31031 October 2013 WCAP-17728-NP, Rev. 1, Comanche Peak Nuclear Power Plant Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis CP-201301238, Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report2013-10-15015 October 2013 Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report ML12159A2882012-06-11011 June 2012 Review of 60-day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Related to Fukushima Dai-ichi Accident ML12080A1432012-03-0606 March 2012 CPNPP Systems Annual Operator Employment Notices ML12080A1502012-03-0606 March 2012 Submittal of Stc Annual Operator Employment Notices CP-201101257, Submittal of Operator Licensing Examination Data2011-09-21021 September 2011 Submittal of Operator Licensing Examination Data 2024-07-30
[Table view] Category:Technical
MONTHYEARML23355A2682023-12-21021 December 2023 NRC Comments - Comanche Peak LRA Supplement 3 (1) CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report2022-11-0303 November 2022 (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report CP-202100127, Transmittal of Pressure and Temperature Limits Report, ERX-07-003, Revision 62021-03-16016 March 2021 Transmittal of Pressure and Temperature Limits Report, ERX-07-003, Revision 6 CP-201900467, (CPNPP) - Biennial Review of Procedures and Station Operations Review Committee Meetings2019-08-14014 August 2019 (CPNPP) - Biennial Review of Procedures and Station Operations Review Committee Meetings CP-201900378, Transmittal of Seventeenth Refueling Outage (2RF17) Steam Generator 180 Day Report2019-06-10010 June 2019 Transmittal of Seventeenth Refueling Outage (2RF17) Steam Generator 180 Day Report CP-201900126, Special Report 2-SR-19-001-00, Inoperable Post Accident Monitoring Instrumentation Report.2019-02-25025 February 2019 Special Report 2-SR-19-001-00, Inoperable Post Accident Monitoring Instrumentation Report. CP-201800652, Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report2018-09-12012 September 2018 Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report ML18044A0982018-02-0808 February 2018 Solid Waste Registration Number: 33306; Texas Waste Code: 37043902; Reference Number: 15749 CP-201700805, Sixteenth Refueling Outage (2RF16) Steam Generator 180 Day Report2017-10-30030 October 2017 Sixteenth Refueling Outage (2RF16) Steam Generator 180 Day Report CP-201600097, Westinghouse LTR-PAFM-16-2-NP, Technical Justification to Support Extended Volumetric Examination Interval for Comanche Peak Unit 1 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-02-29029 February 2016 Westinghouse LTR-PAFM-16-2-NP, Technical Justification to Support Extended Volumetric Examination Interval for Comanche Peak Unit 1 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. ML16047A3302016-01-20020 January 2016 NEI 12-01 Phase 2 Staffing Assessment, Revision 1 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request CP-201400335, . Pressure and Temperature Limits Report2014-04-0808 April 2014 . Pressure and Temperature Limits Report ML13225A5752013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13338A6612013-12-18018 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Comanche Peak Nuclear Power Plant, TAC Nos.: MF0860 and MF0861 ML13309A0272013-10-31031 October 2013 WCAP-17728-NP, Rev. 1, Comanche Peak Nuclear Power Plant Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis ML1029201602010-09-30030 September 2010 WCAP-17269-NP, Revision 0, Analysis of Capsule W from the Comanche Peak Unit No. 2 Reactor Vessel Radiation Surveillance Program. ML0930800082009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 57 of 99 Through Page 89 of 99 ML0930800102009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment E, Page 23 of 49 Through Attachment F CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 452009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 45 CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment a, Page 31 of 45, Through Attachment B2009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment a, Page 31 of 45, Through Attachment B CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment C Through Attachment D, Page 20 of 992009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment C Through Attachment D, Page 20 of 99 CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 21 of 99 Through Page 56 of 992009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 21 of 99 Through Page 56 of 99 CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 57 of 99 Through Page 89 of 992009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 57 of 99 Through Page 89 of 99 CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 90 of 99 Through Attachment E, Page 22 of 492009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 90 of 99 Through Attachment E, Page 22 of 49 ML0930800092009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 90 of 99 Through Attachment E, Page 22 of 49 ML0930800072009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 21 of 99 Through Page 56 of 99 ML0930800062009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment C Through Attachment D, Page 20 of 99 ML0930800052009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment a, Page 31 of 45, Through Attachment B CP-200901403, Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 452009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 45 CP-200801606, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a2008-11-26026 November 2008 Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a ML0835004682008-11-26026 November 2008 Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20 ML0835004702008-11-26026 November 2008 Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57 CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 952008-11-26026 November 2008 Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95 CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 572008-11-26026 November 2008 Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57 CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 202008-11-26026 November 2008 Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20 CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a2008-11-26026 November 2008 Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a ML0835004722008-11-26026 November 2008 Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment E ML0835004712008-11-26026 November 2008 Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95 ML0815600282008-09-0909 September 2008 Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Proposed Alternative Course of Action ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0826102862008-06-30030 June 2008 WCAP-16827-NP, Addendum 1, Revision 0, Supplement to Comanche Peak, Units 1 and 2, Spent Fuel Pool Criticality Safety Analysis. CP-200800265, Transmittal of Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-02-29029 February 2008 Transmittal of Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML0734401502007-12-0303 December 2007 Drill Report 11/06/2007, Final Report - Radiological Emergency Preparedness (REP) Program, 12/03/2007. Draft CPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses2007-07-31031 July 2007 Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses CPSES-200700708, Evaluation of Pressurizer Weld Overlay Confirmatory Analyses2007-04-0505 April 2007 Evaluation of Pressurizer Weld Overlay Confirmatory Analyses CPSES-200700346, Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 20062007-02-0808 February 2007 Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006 CPSES-200602196, WCAP-16610-NP, Rev. 0, Analysis of Capsule X from the Txu Energy Company Comanche Peak Unit 1 Reactor Vessel Radiation Surveillance Program.2006-09-30030 September 2006 WCAP-16610-NP, Rev. 0, Analysis of Capsule X from the Txu Energy Company Comanche Peak Unit 1 Reactor Vessel Radiation Surveillance Program. CPSES-200600269, Eighth Refueling Outage (2RF08) Steam Generator Twelve Month Report2006-02-14014 February 2006 Eighth Refueling Outage (2RF08) Steam Generator Twelve Month Report 2023-07-12
[Table view] |
Text
Rafael Flores Luminant Power Senior Vice President P 0 Box 1002 D & Chief Nuclear Officer 6322 North FM 56 rafael.flores@Luminant.com Glen Rose, TX 76043 Luminant T 254 897 5590 C 817 559 0403 F 254 897 6652 Ref: 10CFR50.36(c)(5)
CP-201400335 TXX-14041 April 8, 2014 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NOS. 50-445 AND 50-446 PRESSURE AND TEMPERATURE LIMITS REPORT
Dear Sir or Madam:
Enclosed is Revision 3 of the Pressure and Temperature Limits Report for Comanche Peak Nuclear Power Plant (CPNPP) Units 1 and 2. This report is prepared and submitted pursuant to Technical Specification 5.6.6.
This communication contains no new licensing basis commitments regarding CPNPP Units 1 and 2.
Should you have any questions, please contact Mr. J. D. Seawright at (254) 897-0140.
Sincerely, Luminant Generation Company LLC Rafael Flores By: _
Fred W. Madden Director, External Affairs Enclosure - Pressure and Temperature Limits Report, Revision 3 c- Marc L. Dapas, Region IV Balwant K. Singal, NRR Resident Inspectors, Comanche Peak A member of the STARS Alliance ")D Callaway . Comanche Peak - Diablo Canyon
ERX-07-003, Revision 3 COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)
PRESSURE AND TEMPERATURE LIMITS REPORT (APPLICABLE UP TO 36 EFPY)
March 2014 Prepared: Date: " 3-t j incipal Engineer, Westinghouse Electric Co.
Reviewed: /u -G*S'v Date: aid 1 Ž!/Lm7 Hugo Q da Silva Fellow Engineer, Westinghouse Electric Co.
Approved: __ __ae:'
Manager, Integrated Site Engineering, Texas/Kansas ERX-07-003, Rev. 3
DISCLAIMER The Information contained in this report was prepared for the specific requirement of Luminant, and may not be appropriate for use in situations other than those for which it was specifically prepared. LUMINANT PROVIDES NO WARRANTY HEREUNDER, EXPRESSED OR IMPLIED, OR STATUTORY, OF ANY KIND OR NATURE WHATSOEVER, REGARDING THIS REPORT OR ITS USE, INCLUDING BUT NOT LIMITED TO ANY WARRANTIES ON MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE.
By making this report available, Luminant does not authorize its use by others, and any such use is forbidden except with the prior written approval of Luminant. Any such written approval shall itself be deemed to incorporate the disclaimers of liability and disclaimers of warranties provided herein. In no event shall Luminant have any liability for any incidental or consequential damages of any type in connection with the use, authorized or unauthorized, of this report or of the information in it.
ii ERX-07-003, Rev. 3
TABLE OF CONTENTS DISCLAIM ER ............................................................................................................................ ii TABLE O F CO NTENTS ........................................................................................................... iii LIST O F TABLES ................................................................................................................. iv LIST O F FIG URES .............................................................................................................. v SECTION PAGE 1.0 INTRO DUCTIO N ......................................................................................................... 1 2.0 O PERATING LIM ITS .................................................................................................... 2 2.1 RCS Temperature Rate-of-Change Limits (LCO 3.4.3) .................................... 4 2.2 P/T Limits for Heatup, Cooldown, Inservice Leak & Hydrostatic Testing, and Criticality (LCO 3.4.3) ...................................................................................... 4 2.3 LTO P System Setpoints (LCO 3.4.12) .............................................................. 6 2.4 Reactor Vessel Material Surveillance Program ................................................ 6
3.0 REFERENCES
........................................................................................................... 7 iii ERX-07-003, Rev. 3
LIST OF TABLES TABLE PAGE 2-1 Limiting Materials and Reference Temperatures for CPNPP Unit I and Unit 2 R eactor V essels ........................................................................................................ 8 2-2 Calculation of Chemistry Factor Values for Unit I Surveillance Capsule Test R esu lts ........................................................................................................................ 9 2-3 Calculation of Chemistry Factor Values for Unit 2 Surveillance Capsule Test R esu lts ...................................................................................................................... 10 2-4 PORV Setpoints for Low Temperature Overpressure (LTOP) System For Unit I with Delta-76 Steam Generators - Applicable Up To 36 EFPY ....................................... 11 2-5 PORV Setpoints for Low Temperature Overpressure (LTOP) System For Unit 2 with D5 Steam Generators - Applicable Up To 36 EFPY ................................................. 11 2-6 Unit 2 Reactor Vessel Material Surveillance Program - Withdrawal Schedule ........ 12 iv ERX-07-003, Rev. 3
LIST OF FIGURES FIGURE PAGE 2-1 Reactor Coolant System Heatup Limitations - Applicable Up To 36 EFPY .............. 13 2-2 Reactor Coolant System Cooldown Limitations - Applicable Up To 36 EFPY .......... 14 v
ERX-07-003, Rev. 3
1.0 INTRODUCTION
This report presents the Reactor Coolant System (RCS) Pressure and Temperature (PIT) limits for Comanche Peak Nuclear Power Plant (CPNPP) Unit 1 and Unit 2 in accordance with the requirements of Technical Specification 5.6.6. A description of the Low Temperature Overpressure Protection (LTOP) System power-operated relief valve (PORV) setpoints is also provided in this report. In addition, the requirements of the reactor vessel material surveillance program are discussed.
The following two Technical Specification Limiting Conditions of Operation (LCO) are addressed in this report:
LCO 3.4.3 RCS Pressure and Temperature (PIT) Limits LCO 3.4.12 Low Temperature Overpressure Protection (LTOP) System The analytical methods used to determine the RCS pressure and temperature limits are described in Reference 1. The methods used to develop the LTOP System PORV setpoints are also described in Reference 1.
This report covers CPNPP Unit 1 and Unit 2 operation for 36 Effective Full Power Years (EFPY).
Note that Revision 0 of this PTLR was submitted to the NRC in support of Operating License Amendment 132. The NRC reviewed the submittal and has determined that the PTLR meets the requirements set forth In GL 96-03 for plant-specific PTLRs; therefore, it is acceptable for use at CPNPP.
In Revision 1, the LTOP System PORV setpoints for CPNPP Unit 2 with the D5 steam generators are changed to those of Table 14 of Reference 5.
In Revision 2 of this PTLR, the LTOP System PORV setpoints for CPNPP Unit 1 with the A76 steam generators are changed to those of Table 12 of Reference 5.
1 ERX-07-003, Rev. 3
2.0 OPERATING LIMITS RCS P/T Limits The RCS P/T limits presented in this report consist of the RCS (except the pressurizer) temperature rate-of-change limits and P/T limits during heatup, cooldown, inservice leak and hydrostatic testing, and criticality. The P/T limits for both CPNPP units are based on the approved methodology presented in Reference 1.
The RCS P/T limits are based on the results of the evaluations of the most recently analyzed reactor vessel specimen capsules as presented in References 2 and 3 for Units 1 and 2, respectively. The more limiting material is used to develop RCS P/T limits that bound both CPNPP units.
The RCS P/T limits calculated for selected heatup and cooldown rates for CPNPP Unit I and Unit 2 are extracted from Reference 6.
LTOP System The LTOP System acts as a backup to the reactor operators to mitigate RCS pressurization transients at low temperatures so the integrity of reactor coolant pressure boundary (RCPB) is not compromised by violating the pressure and temperature limits of Appendix G of 10 CFR 50.
The reactor vessel is the limiting RCPB component for demonstrating such protection.
The LTOP System provides reduced setpoints for the pressurizer Power-Operated Relief Valves (PORVs) as a function of the RCS temperature. The methodology used to select the setpoint pressures is described in Reference 1. Allowances for instrument uncertainties have been included in the development of these setpoints.
The LTOP System PORV setpoints for CPNPP Unit I (with the A76 steam generators) and those for CPNPP Unit 2 (with the D5 steam generators) are extracted from Reference 5.
2 ERX-07-003, Rev. 3
REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM The reduction in ductility that results from neutron radiation manifests itself as an increase in the Nil Ductility Reference Temperature (RTNDT) and a reduction of the upper-shelf energy of reactor vessel beltline materials, Including welds. At CPNPP, these quantities were predicted at 36 EFPY using the methods of WCAP-14040-NP-A, Revision 4 [1]. The predictions showed that the materials in the Unit 1 and Unit 2 reactor vessels responded similarly to neutron irradiation but at 36 EFPY, the plate material In the Unit I beftline was most limiting. Forecast properties of the limiting material were used to establish P/T limits for heatup and cooldown curves and LTOP setpoints.
The reactor vessel specimen capsules are withdrawn when the projected neutron fluence would exceed one-times the projected end-of-life vessel fluence and less than two-times the projected end-of-life vessel fluence, in accordance with Reference 7.
For Unit 1, the required specimen capsules U and Y have been withdrawn and evaluated [2].
The third required specimen capsule, Capsule X, was withdrawn during 1RF1 1 in the fall of 2005, with a fluence within the range of one-times to two-times the 52 EFPY Peak Fluence [2],
but has not yet been evaluated. Two of the standby capsules (Capsules V and W) were withdrawn in 1 RF09 and stored for later evaluation, if necessary. The third standby capsule was withdrawn during IRF 11 in the fall of 2005 and stored for later evaluation, ifnecessary.
Because all reactor vessel surveillance capsules have been withdrawn and stored, a capsule removal schedule is not required for Unit 1.
For Unit 2, the required specimen capsules U and X have been withdrawn and evaluated [3].
The third required specimen capsule, Capsule W, is scheduled to be withdrawn during 2RF1 1 in the fall of 2009, with a fluence within the range of one-times to two-times the 54 EFPY Peak Fluence [3]. The schedule for the third capsule withdrawal differs from the specific recommendations contained in Reference 3, but satisfies the requirements of Reference 7 based on an expected end-of-life fluence corresponding to the 54 EFPY Peak Fluence. Two of the standby capsules (Capsules V and Y) were withdrawn In 2RF07 and stored for later evaluation, if necessary. The third standby capsule is scheduled to be withdrawn during 2RF1 1 and stored for later evaluation, if necessary.
3 ERX-07-003, Rev. 3
2.1 RCS Temperature Rate-of-Change Limits (LCO 3.4.3) 2.1.1 Maximum Heatup Rate The RCS heatup rate limit is 100°F in any 1-hour period.
2.1.2 Maximum Cooldown Rate The RCS cooldown rate limit is 100°F in any 1-hour period.
2.1.3 Maximum Temperature Change During Inservice Leak and Hydrostatic Testing During inservice leak and hydrostatic testing operations above the heatup and cooldown limit curves, the RCS temperature change limit is 10°F in any 1-hour period.
2.2 P/T Limits for Heatup, Cooldown. Inservice Leak & Hydrostatic Testing. and Criticality (ILCO 3.4.3)
The limiting materials and adjusted reference temperatures at the 1/4t and 3/4t locations for each unit's reactor vessel are extracted from Reference 4 and are presented in Table 2-1. These values are based on the evaluation of two surveillance capsule specimens for each unit which include evaluations of the credibility of data per Regulatory Guide 1.99, Revision 2. All surveillance data for Unit 1 is credible. For Unit 2, the surveillance plate data (for the intermediate shell plate R3807-1) is not credible, while the surveillance weld data is credible.
The limiting reference temperatures for pressurized thermal shock (RTPTS) values for each unit's reactor vessel were previously docketed In accordance with I OCFR50.61 and are extracted from References 8 and 9 for presentation in Table 2-1. Analyses of the withdrawn surveillance capsules from the Unit 1 and Unit 2 reactor vessels have confirmed the similarity between the two vessels in irradiated and non-irradiated material properties. The results of these surveillance capsule evaluations have confirmed that the early projections for CPNPP vessel materials were conservative. In addition, the majority of the irradiation-induced shift in vessel material properties occurs early in life.
Therefore, with substantial margin to the RTPTS screening criteria, the conservative fluence projections for the CPNPP vessel materials, and the 4
ERX-07-003, Rev. 3
absence of a significant change in the projected values of RTpTs, the Pressurized Thermal Shock reports have not been revised.
2.2.1 Calculation of Chemistry Factors usingq Surveillance Capsule Test Results Best-estimate, plant-specific, copper and nickel weight percent values were used to calculate the chemistry factors in accordance with Regulatory Guide 1.99, Revision 2. Additionally, surveillance capsule data Is available for two capsules already removed from both Comanche Peak reactor vessels; this data was used to calculate chemistry factor values per Position 2.1 of the Regulatory Guide. The calculations of the Chemistry Factors for the Unit I and Unit 2 reactor vessels are summarized in Table 2-2 and Table 2-3, respectively.
2.2.2 P/T Limits for Heatup, Inservice Leak & Hydrostatic Testing, and Criticality The Pfr limits for heatup, inservice leak & hydrostatic testing, and criticality, based on the limiting material from the Unit 1 and Unit 2 reactor vessels, are extracted from Reference 6 and presented In Figure 2-1.
2.2.3 P/T Limits for Cooldown The P/T limits for cooldown, based on the limiting material from the Unit 1 and Unit 2 reactor vessels, are extracted from Reference 6 and presented in Figure 2-2.
5 ERX-07-003, Rev. 3
2.3 LTOP System Setpoints (LCO 3.4.12)
The nominal PORV setpoints for use with the Low Temperature Overpressure (LTOP) System are shown in Table 2-4 and Table 2-5. The PORV setpoints in Table 2-4 are applicable to Unit I with A76 steam generators and were extracted from Table 12 of Reference 5. The PORV setpoints in Table 2-5 are applicable to Unit 2 with D5 steam generators and were extracted from Table 14 of Reference 5.
2.4 Reactor Vessel Material Surveillance Program A withdrawal schedule for Unit I is not necessary, because all Unit 1 surveillance capsules have been withdrawn from the reactor vessel. The reactor vessel material surveillance capsule withdrawal schedule for Unit 2 is provided in Table 2-6.
6 ERX-07-003, Rev. 3
3.0 REFERENCES
- 1. "Methodology used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves," WCAP-14040-NP-A, Revision 4, May, 2004.
- 2. "Analysis of Capsule Y from the TU Electric Company Comanche Peak Unit 1 Reactor Vessel Radiation Surveillance Program," WCAP-15144-NP, Revision 0, January, 1999.
- 3. "Analysis of Capsule X from the TU Energy Comanche Peak Unit 2 Reactor Vessel Radiation Surveillance Program," WCAP-16277-NP, Revision 0, September, 2004.
- 4. "Comanche Peak Units 1 and 2 Heatup and Cooldown Limit Curves for Normal Operation," WCAP-1 6346-NP, Revision 0, October 2004.
- 5. TXU POWER - COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 AND 2 Revised LTOP System Setpoints - Final Report, WPT-16994, June 28, 2007, VL-07-001465.
- 6. "Luminant Comanche Peak Nuclear Power Plant Unit 1 and 2 Reactor Vessel Pressure-Temperature Limits," WPT-1 7774, March 13, 2014, VDRT-4804676.
- 7. ASTM E 185-82, "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels, E706 (IF)."
- 8. 'Evaluation of Pressurized Thermal Shock for Comanche Peak Unit 1," WCAP-13437, docketed via TXU Electric letter logged TXX-92516, December 28, 1992.
- 9. "Evaluation of Pressurized Thermal Shock for Comanche Peak Unit 2," WCAP-14345, docketed via TXU Electric letter logged TXX-95243, dated September 19, 1995.
7 ERX-07-003, Rev. 3
Table 2-1: Limiting Materials and Reference Temperatures for CPNPP Unit I and Unit 2 Reactor Vessels Adjusted Reference Reference Temperature -
Unit Limiting Material Temperature (ART) Pressurized Sok(TPS Thermal Shock (RT.PTS) 114t 314t R-1 107-I, 1 Intermedlate 92 0F 80°F 100OF Shell Plate R-3807-2, 2 Intermediate 84°F 69°F 94°F Shell Plate a
ERX-07-003, Rev. 3
Table 2-2: Calculation of Chemistry Factor Values using Unit I Surveillance Capsule Test Results Material Capsule F(a) FF(b) ARTNDT(C) FF x ARTNDT FF 2 Lower Shell U 0.318 0.685 6.6 4.521 0.469 R1108-2 (Longitudinal) Y 1.49 1.11 6.9 7.66 1.23 Lower Shell U 0.318 0.685 21.3 14.591 0.469 R1 108-2 (Transverse) Y 1.49 1.11 25.3 28.08 1.23 SUM 54.852 3.398 CFR11o82 = X( FF x LRTNDT) + T( FF 2) = 54.852 + 3.398 = 16.1°F Weld Metal U 0.318 0.685 0 . 0 (de) 0.0 0.469 (Heat# 88112) Y 1.49 1.11 1 7 . 6 (d) 19.54 1.23 SUM 19.54 1.699 CFWELD = X( FF X ARTNDT) + *( FF 2) = 19.54 + 1.699 = 11.5*F Notes:
(a) F = Calculated Fluence (10'9 n/cm2, E > 1.0 MeV). See Table 2-2 of Reference 4.
02 8 1 (b) FF = Fluence Factor = F( "°0 *logF)
(c) All available data is from Comanche Peak Unit 1121. Therefore, no temperature adjustment is required.
(d) The measured ARTNDT values for the weld metal have been adjusted by a ratio of 1.04.
(e) The CVGRAPH calculated value is -14.14 0 F. 0.0°F was used in the calculation for conservatism.
NOTE: The Chemistry Factor from the previous analysis in Reference 2 was 15.7 0 F for the surveillance lower shell plate and 10.7 0 F for the surveillance weld. As can be seen above, there is only a minor change (i.e., <I°F) to the Chemistry Factor values. Thus, the credibility evaluation from the previous analysis remains valid. All Unit 1 surveillance data is credible.
NOTE: _lThe-value-ofFF-forCIPNPP Unit 1 has been corrected to 0.685. The value reported in WCAP-16346-NP was incorrectly stated as 0.683.
9 ERX-07-003, Rev. 3
Table 2-3: Calculation of Chemistry Factor Values using Unit 2 Surveillance Capsule Test Results Material Capsule F(a) FF(b) ARTNDT(c) FF x ARTNDT FF 2 Inter. Shell R3807-2 U 0.315 0.683 1.6 1.093 0.466 (Longitudinal) X 2.20 1.21 1.6 1.94 1.46 Inter. Shell R3807-2 U 0.315 0.683 23.4 15.982 0.466 (Transverse) X 2.20 1.21 52.9 64.01 1.46 SUM 83.025 3.852 CFRI108-2 = *( FF x ARTNDT)+ T( FF 2) = 83.025 - 3.852 = 21.6°F Weld Metal U 0.315 0.683 3 . 7 4 (d) 2.55 0.466 (Heat # 89833) X 2.20 1.21 5 0 . 1 3 (d) 60.66 1.46 SUM 63.21 1.926 CFWELD = X( FF x ARTNDT) + T( FF 2) = 63.21 + 1.926 = 32.81F Notes:
(a) F = Calculated Fluence. Units are x 1019 rdcmn (E > 1.0 MeV). See Table 2-2 of Reference 4.
(b) FF = Fluence Factor = F(o.¶oo F)
(C) All available data is from Comanche Peak Unit 213). Therefore, no temperature adjustment is required.
(d) The measured ARTNDT values for the weld metal have been adjusted by a ratio of 1.04.
NOTE: For Unit 2, the surveillance plate data (for the intermediate shell plate R3807-1) is not credible, while the surveillance weld data is credible.
10 ERX-07-003, Rev. 3
Table 2-4: PORV Setpoints for Low Temperature Overpressure (LTOP) System For Unit I with Delta-76 Steam Generators - Applicable Up To 36 EFPY Adjusted RCS PORV #1 Setpoint PORV #2 Setpoint Temperature (psig) (psig)
(°F) 70 375 375 150 375 375 200 447 447 220 447 447 250 573 573 350 573 573 405 2335 2335 Table 2-5: PORV Setpolnts for Low Temperature Overpressure (LTOP) System For Unit 2 with D6 Steam Generators - Applicable Up To 36 EFPY Adjusted RCS PORV #1 Setpoint PORV #2 Setpoint Temperature (psig) (psig)
(°F) 70 375 375 150 375 375 200 440 440 220 440 440 250 580 580 350 580 580 405 2335 2335 11 ERX-07-003, Rev. 3
Table 2-6: Unit 2 Reactor Vessel Material Surveillance Program - Withdrawal Schedule CAPSULE VESSEL LEAD WITHDRAWAL WITHDRAWAL NUMBER LOCATION FACTOR TIME OUTAGE 3.93 1st Refueling I t Refueling U 58.50 x 238.50 4.15 8.83 EFPY 2RF07 W 121.50 4.11 13 EFPY 2RF11 z 301.50 4.11 Standby 2RF11 V 61.00 3.87 Standby 2RF07 Y 241.00 3.87 Standby 2RF07 12 ERX-07-003, Rev. 3
Figure 2-1 Reactor Coolant System Heatup Limitations for CPNPP Unit I and Unit 2 -
Applicable for the First 36 EFPY (wlo Margins for Instrumentation Errors) 2500 LeakTstLimit 2250 cal Limit 20 Deg. F/Hr 2000 Critical Limit 60 Deg. FIHr 0
A 1750 20 Deg. FIHr Critical LimitI
(/) HatupRate100 Deg. F/Hr 0
1250 HeatupRate __
0 ~Acceptable 100ODeg. F/Hr
[L00 - Operation a~ 1000 Unacceptable pe.t .
Operation 50 0 . ....
BoltupCriticality Limit based on inservice hydrostatic test 250F temperature (152F) for the service perod u to 3BEFPY 0o--
0 50 100 150 200 250 300 350 400 450 500 550 Moderator Temperature (Deg. F) 13 ERX-07-003, Rev. 3
Figure 2-2 Reactor Coolant System Cooldown Limitations for CPNPP Unit I and Unit 2 -
Applicable for the First 36 EFPY (wlo Margins for Instrumentation Errors) 2500 2250 Unacceptable 2000 Operation A 1750
.Acceptable
- Operation.
1500 1250 - Cooldown "
Rates, ¶IHr I ... . .
I..
- steady-state-20 1....
0 1000 -20
-40
-60 750 --*-100 -- - - - -- ___ ___
500 Boltup 250 -. - Temperature, 60°F - "
0 The lower limit for RCS pressure is -14.7 psig 0 50 100 150 200 250 300 350 400 450 500 550 Moderator Temperature (Deg. F) 14 ERX-07-003, Rev. 3