Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data
ML070660511
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/28/2007
From: Blevins M, Madden F
TXU Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-200700454, TXX-07051
Download: ML070660511 (6)


Text

~Power TXU TX 1 Powewr Mifke BlevIns Cemamche Peak Steam Seniobr Vice President &

EBectritC Station CiJefl Nucdear Offirer P._ 0_. Blx, 11002 (pEaI))

Glmei Rose,, TX 766043, Telt 254 897 5209 Fax.: 254 897 6652' mike~bevins@ txu~corm CPSES-200700454 REF: 10CFR27.71(d)

Log# TXX-07051 February 28, 2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF SECOND-HALF 2006 FITNESS-FOR-DUTY PROGRAM PERFORMANCE DATA Gentlemen:

Attached are CPSES Fitness-For-Duty Program Performance data for the six month period of July 1, 2006 through December 31, 2006. The data required by 10CFR26.71 (d) are provided on standard forms with the exception of the summary of management actions and list of events reported, which are provided on a separate page titled "Summary of Management Action." This communication contains no new or revised commitments.

If there are any questions, please contact Mr. Greg Bell at (254) 897-5290.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance .(i ./

Callaway

  • Comanche Peak e Diablo Canyon
  • Palo Verde
  • Wolf Creek

TXX-07051 Page 2 of 2 Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC Its General Partner Mike Blevins By: i Fred W. Madden Director, Oversight and Regulatory Affairs NSH Attachments c- B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES

Attachments to TXX-07051 (3 Pages)

Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 TXU Power December 31. 2006 Company 6 Months Ending Comanche Peak Steam Electric Station Location Greq Bell, Security Coordinator (254) 897- 5290 Contact Name Phone (including area code)

Cutoffs: Screen/Confirmation (ng/ml) El Appendix A to 10 CFR 26 Marijuana 50 / 15*

Mariauana 100 / 15 Amphetamines 1000 / 500 Cocaine 300 / 150 Phencyclidine 25 / 25 Opiates 300 / 300 Alcohol (% BAC) 0.04%

  • CPSES specific Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 723 1582 Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 26 0 0 0 1215 12 For Cause Post-accident 1 0 0 0 6 0 Observed behavior 1 0 0 0 2 1 Random 199 1 0 0 220 0 Follow-up 2 0 0 0 3 0 Other 4 0 0 0 15 0 Total 233 1 [ 0 0 1 1461 13

Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe- Phency. Alcohol Refusal 4 tamines clidine to Test Licensee Employees 0 1 0 0 0 0 0 Long-Term Contractors 0 0 0 0 0 0 Short Term Contractors 7 2 0 2 0 2 1 Total 7 3 0 210 21 I I 15

SUMMARY

OF MANAGEMENT ACTIONS And STATISTICAL ANALYSIS FOR REPORTING PERIOD JULY THROUGH DECEMBER 2006 Analysis of the data indicates that 32 percent of the average eligible population was randomly tested during the period July through December 2006. A total of 56 percent of the average eligible population was randomly tested for the year 2006.

The total positive tests for this period were 14. Twelve of the tests were for pre-access, one test was a for-cause (GB), and one was on a random test. Short-term contractor personnel accounted for thirteen of the positive tests. There was also one short-term contractor who refused to test.

TXU Power submitted blind performance specimens in accordance with 10 CFR 26, Appendix A, Section 2.8 (e)(2), requirements. There were no reportable events.

No events were reported by telephone under 10CFR26.73.