IR 05000328/2003003

From kanterella
(Redirected from ML032510115)
Jump to navigation Jump to search
IR 05000328-03-003, IR 05000329-03-003 and IR 05000330-03-003, Palo Verde, Errata
ML032510115
Person / Time
Site: Palo Verde, Sequoyah  Arizona Public Service icon.png
Issue date: 09/08/2003
From: Laura Smith
NRC/RGN-IV/DRP/RPB-D
To: Overbeck G
Arizona Public Service Co
References
IR-03-003
Download: ML032510115 (7)


Text

September 8, 2003 Greg R. Overbeck, Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, Arizona 85072-2034 SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - ERRATA FOR NRC INTEGRATED INSPECTION REPORT 05000528/2003003, 05000529/2003003, AND 05000530/2003003 NRC Inspection Report 05000528/2003003, 05000529/2003003, AND 05000530/2003003, ADAMS Accession Number ML032030143, was issued July 21, 2003, with an inadvertent error on Attachment page A-1. Licensee Event Report LER-05000528, 529, 530/1998003-02 was incorrectly listed as closed. We regret any inconvenience this may have caused. A corrected Attachment page A-1 is enclosed to replace the originally issued page to the report.

In accordance with 10 CFR 2.790 of the NRC's Rules of Practice, a copy of this letter, its enclosure and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you. I can be reached at 817 860 813

Sincerely,

/RA/

Linda Joy Smith, Chief Projects Branch D Division of Reactor Projects Enclosure:

Corrected Attachment Page A-1 of NRC Inspection Report 05000528/2003003, 05000529/2003003, AND 05000530/2003003 Dockets: 50-528, 50-529, 50-530 Licenses: NPF-41, NPF-51, NPF-74

Arizona Public Service Company -2-cc w/enclosure:

Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, Arizona 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, California 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, Arizona 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Craig K. Seaman, Director Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, Arizona 85072-2034 Hector R. Puente Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, Arizona 85004 Terry Bassham, Esq.

General Counsel El Paso Electric Company 123 W. Mills El Paso, Texas 79901 John W. Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, California 90051-0100

Arizona Public Service Company -3-John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, New Mexico 87107-4224 Cheryl Adams Southern California Edison Company 5000 Pacific Coast Hwy. Bldg. DIN San Clemente, California 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, Arizona 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326

Arizona Public Service Company -4-Electronic distribution by RIV:

Acting Regional Administrator (TPG)

DRP Director (ATH)

Acting DRS Director (GMG)

Senior Resident Inspector (NLS)

Branch Chief, DRP/D (LJS)

Senior Project Engineer, DRP/D (RVA)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

Mel Fields (MBF1)

Only inspection reports to the following:

J. Clark (JAC), OEDO RIV Coordinator PV Site Secretary (vacant)

ADAMS: / Yes * No Initials: _LJS_

/ Publicly Available * Non-Publicly Available * Sensitive / Non-Sensitive R:\_PV\2003\PV2003-03RPerr-LJS.wpd C:DRP/D LJSmith;mjs

/RA/

9/8/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel S. Bauer, Department Leader, Regulatory Affairs L. Bullington, Maintenance Rule Expert Panel Chairperson R. Buzzard, Regulatory Affairs D. Carnes, Department Leader, Operations J. Gonzales, Site Representative, Public Service of New Mexico F. Gower, Site Representative, El Paso Electric R. Henry, Site Representative, Salt River Project A. Kranik, Director, Emergency Services Division D. Leech, Department Leader, Nuclear Assurance Department D. Marks, Section Leader, Regulatory Affairs D. Mauldin, Vice President, Engineering and Support G. Overbeck, Senior Vice President S. Peace, Consultant, Communications T. Radtke, Director, Maintenance G. Reeves, Maintenance Rule Coordinator D. Smith, Director, Operations LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED Opened 05000528, 529, URI Inappropriate patrol duties performed (Section 4OA5).

530/2003003-01 Closed 05000528/2002001-00 LER Reactor Trip due to Core Protection Calculators generating a CEA deviation trip signal (Section 4OA3.2)05000528/2003002-00 LER Manual Reactor Trip Due to Degraded Main Condenser Tube Plug (Section 4OA3.3)

Discussed None A-1 Attachment