ML020660606

From kanterella
Jump to navigation Jump to search
Detroit Edison - Revision 53 to Fermi 2 Technical Requirement Manual - Volume 1
ML020660606
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/26/2002
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML020660606 (10)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 02/26/02 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 53 11 IR 02/20/02 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: e52186 0

')ý

- LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 53 dated 02/20/02 Immediately, upon receipt of the item(s) below, please insert and/or remove the documents indicated. Please destroy the removed documents. Please be sure that Revision 52 dated 2/12/02 has been inserted prior to inserting these pages.

Location Remove Insert In Front of TRM Title Page Rev 52 02/12/02 Title Page Rev 53 02/20/02 Manual List of Effective Pages List of Effective Pages Immediately following Title Page LEP-I through LEP- 4 Rev 52 02/12/02 LEP- I through LEP- 4 Rev 53 02/20/02 3.12 Fire Protection Page TRM 3.12-4 Rev 31 10/99 Page TRM 3.12-4 Rev 53 02/02 Page TRM 3.12-5 Rev 38 06/00 Page TRM 3.12-5 Rev 53 02/02 Page TRM 3.12-6 Rev 31 10/99 Page TRM 3.12-6 Rev 53 02/02 END

Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMA TION DTC: TMTRM File: 1754 DSN: TRM VOL I 1 Rev: 53 Date: 02/20/02 Recipient LA ,5-

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Pacre Revision Page Revision TRM i Revision 31 TRM3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 31 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 31 TRM 3 0-a Revision 31 TRM 3.3-41 Revision 31 TRM 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 31 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3. 1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-1a Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-1b Revision 34 TRM 3.3-2 Revision 39 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3 .3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3 .3-12 Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 31 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 31 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 31 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 39 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3 .6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3 .6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 TRM Vol. I LEP-I REV 53 02/20/02

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 47 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3. 9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 31 TRM 3. 11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3. 7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3 .7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 31 TRM 3 .12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3 .12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 40 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3 .8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3 .8-3 Revision 31 TRM 3.12-27 Revision 31 TRM 3 .8-4 Revision 31 TRIM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 TRM Vol. I LEP-2 REV 53 02/20/02

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-6 Revision 31 TRM B3.6.3-1 Revision 31 TRM 5.0-7 Revision 31 TRM B3.6.4-1 Revision 31 TRM 5.0-8 Revision 31 TRM B3.6.5-1 Revision 31 TRM 5.0-9 Revision 31 TRM B3.6.6-1 Revision 31 TRM B1. 0-1 Revision 31 TRM B3.6.7-1 Revision 31 TRM B2. 0-1 Revision 31 TRM B3.6.8-1 Revision 31 TRM B3 0-1 Revision 31 TRM B3.7.1-1 Revision 31 TRM B3. 0-2 Revision 31 TRM B3.7.2-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.7.3-1 Revision 31 TRM B3 .0-4 Revision 31 TRM B3.7.4-1 Revision 31 TRM B3.0-5 Revision 31 TRM B3.7.4-2 Revision 31 TRM B3 .0-6 Revision 31 TRM B3.7.5-1 Revision 31 TRM B3.0-7 Revision 31 TRM B3.7.6-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.7-1 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3. 1-1 Revision 31 TRM B3.7.9-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3. 7.9-2 Revision 31 TRM B3 .3.2-1 Revision 31 TRM B3. 8. 1-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3 .3.3-1 Revision 31 TRM B3.8.3-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.4-2 Revision 31 TRM B3.8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TRM B3.8.6-1 Revision 43 TRM B3 .3.5-2 Revision 31 TRM B3. 9.1-1 Revision 31 TRM B3 .3.6-1 Revision 31 TRM B3. 9.2-1 Revision 31 TRM B3.3.6-2 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3 .6-3 Revision 31 TRM B3.9.4-1 Revision 31 TRM B3.3.6-4 Revision 31 TRM B3 .10-1 Revision 31 TRM B3.3.6-5 Revision 31 TRM B3. 11.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.12.

2-1 Revision 31 TRM B3 .3.7-2 Revision 31 TRM B3.12.2-2 Revision 44 TRM B3.3.8-1 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12. 4-1 Revision 31 TRM B3.3. 10-1 Revision 31 TRM B3.12. 5-1 Revision 31 TRM B3.3. 11-1 Revision 45 TRM B3.12 .6-1 Revision 31 TRM B3 .3.12-1 Revision 31 TRM B3.12. 7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.12.8-1 Revision 31 TRM B3.3.14-1 Revision 31 TRM B3 .4.1-1 Revision 31 TRM B3 .4.1-2 Revision 34 TRM B3 .4.1-3 Revision 34 TRM B3 .4.1-4 Revision 34 TRM B3 .4.1-5 Revision 34 TRM B3 .4.2-1 Revision 31 TRM B3.4.3--1 Revision 31 TRM B3. 4.4-1 Revision 31 TRM B3 .4.5-1 Revision 31 TRM B3.4.6-1 Revision 31 TRM B3 .4.7-1 Revision 31 TRM B3.5-1 Revision 31 TRM B3.6.1-1 Revision 31 TRM B3.6.2-1 Revision 31 TRM Vol. I LEP- 3 REV 53 02/20/02

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 TRM Vo 1. I LEP-4 REV 53 02/20/02

Fire Detection Instrumentation TR 3.12.1 TABLE TR3.12.1-1 (Page 1 of 3)

Fire Detection Instrumentation FIRE TOTAL NUMBER OF INSTRUMENTS(a)

DETECTION IONIZATION PHOTOELECTRIC THERMAL INFRARED FUNCTION ZONE (X/Y) (X/Y) (X/Y) (X/Y)

1. Reactor Building(b)
a. Torus area 1 8/0
b. NW corner rooms 2 4/0 RHR pump
c. SW corner rooms 3 4/0 RHR pump
d. SE corner rooms 4 9/0 CRD HPCI
e. NE corner rooms 5 5/0 RCIC
f. First floor 7 20/0 8/0
g. EECW system area 10 21/0 second floor
h. Third floor 15 15/0
i. Fourth floor 17 8,0 2/0
j. Refueling area, 17 10/0 fifth floor
2. Auxiliary Building
a. Basement N 6/0 control air equipment
b. Corridors, 5 2/0 562 ft, 563 ft
c. First floor 6 17"!

mezzanine cable tray, 583 ft, 603 ft

d. Switchgear room, 9 '0!0 corridor area second floor
e. Cable tunnel 9 10/0 (continued)

(a) (X/Y) X is number of Function A (early-warning fire detection and notification only) instruments.

Y is number of Function B (actuation of fire suppression system and early warning and notification) instruments.

(b) The fire detection instruments located within the containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.

TRM Vol. I TRM 3 .12-4 REV 53 02/02

Fire Detection Instrumentation TR 3.12.1 TABLE TR3.12.1-1 (Page 2 of 3)

Fire Detection Instrumentation FIRE TOTAL NUMBER OF INSTRUMENTS a)

DETECTION IONIZATION PHOTOELECTRIC THERMAL INFRARED I FUNCTION ZONE (X/Y) (X/Y) (X/Y) (X/Y)

2. Auxiliary Building (continued)
f. Cable tray area 9A 0/22 second floor mezzanine
g. DC/MCC room, 14 0/10 third floor
h. Switchgear, 14 14/0 battery and M-G rooms, third floor
i. Fourth floor 16 6/0
j. Fifth floor 16 25/0
3. Control Center
a. Relay room 8 0/27
b. Cable spreading i1 0/28 room
c. Control room 12 52/0 4/0 2/0
d. Computer room 13 0/4 0/9
e. Computer room 13 5/0 2/0 above drop ceiling
4. RHR Complex
a. Division I pump 50 8/0 room
b. Division II pump 51 8/0 room
c. EDG 11 room 0/8 suppression
d. EDG 12 room 0/8 suppression
e. EDG 13 room 0/8 suppression
f. EDG 14 room 0/8 suppression (continued)

(a) (X/Y) X is number of Function A (early-warning fire detection and notification only) instruments.

Y is number of Function B (actuation of fire suppression system and early warning and notification) instruments.

TRM Vol. I TRM 3.12-5 REV 53 02/02

Fire Detection Instrumentation TR 3.12.1 TABLE TR3.12.1-1 (Page 3 of 3)

Fire Detection Instrumentation FIRE TOTAL NUMBER OF INSTRUMENTS(a)

DETECTION IONIZATION PHOTOELECTRIC THERMAL INFRARED FUNCTION ZONE (X/Y) (X/Y) (X/Y) (X/Y)

4. RHR Complex (continued)
g. EDG 11 switchgear 52 6/0 room
h. EDG 12 switchgear 53 6/0 room
i. EDG 13 switchgear 54 6/0 room
j. EDG 14 switchgear 55 6/0 room
5. General service water pump house
a. First floor 31 2/0 3/0 (a) (X/Y) X is number of Function A (early-warning fire detection and notification only) instruments.

Y is number of Function B (actuation of fire suppression system and early warning and notification) instruments.

TRM Vol. I TRM 3 .12-6 REV 53 02/02