LIC-05-0003, January 2005 Monthly Operating Report for Fort Calhoun Station, Unit 1

From kanterella
Jump to navigation Jump to search
January 2005 Monthly Operating Report for Fort Calhoun Station, Unit 1
ML050420346
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/11/2005
From: Herman J
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-05-0003
Download: ML050420346 (2)


Text

Omaha Public Power D~stnct 444 South 16th Street Mall Omaha NE 68102-2247 February 11,2005 LIC-05-0003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

January 2005 Monthly Operating Report (MOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1 .c, Omaha Public Power District (OPPD) submits the attached MOR for January 2005. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, P J. B. Herman Em+----

Licensing Manager J BH/EPM/epm Attachment Employment with Equal Opportunity

_r -. _-

LIC-05-0003 Attachment OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE February 1,2005 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: January 2005 Design Electrical Rating (MWe-Net): 478 Maximum Dependable Capacity (MWe-Net): 478 MONTH YR-TO- CUMULATIVE DATE Number of Hours Reactor was Critical: 744.0 744 .O 224131.5 Number of Hours Generator was On-line: 744.0 744.0 222772.3 Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWh): 363921.3 363921.3 96961320.7 Method of Date Type Duration Shutting Cause & Corrective No. F: Forced Reason (yymddd) S: Scheduled (Hours) Down Action Comments Reactor*

(1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance o r Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator TraininglLicense Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS

SUMMARY

Fort Calhoun Station operated at a nomiiial 100 percent power for the of the month of January.