Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 February 10, 2004 LIC-04-0013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

January 2004 Monthly Operating Report (MOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. I Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for January 2004. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, Attachment c: B. S. Mallett, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center

Piece 4;4 Employment with Equal Opportunity

LIC-04-0013 Attachment OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE February 2, 2004 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: January 2004 Design Electrical Rating (MWe-Net): 478 Maximum Dependable Capacity (We-Net): 478 YR-TO-MONTH CUMULATIVE DATE Number of Hours Reactor vas Critical: 744 744 215,612.00 Number of Hours Generator w'as On-line: 744 744 214,268.95 Unit Reserve Shutdown Hours: 0 0 0 Net Electrical Energy Generated (MWh): 365,658.40 365,658.40 92,891,761.30 UNIT SHUTDOWNS Type Method of Date Duration R Shutting Cause & Corrective (yy/mm/dd) F: ced (Hours) Down Action Comments 5: Scheduled j Reactor 2 (1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS SUMMINARY Fort Calhoun Station operated at a nominal 100 percent power for the month of January 2004. The elevated RCS leakage is being constantly monitored for impact. The leakage is verified as coming from "C" RC pump seal and going to the Reactor Coolant Drain Tank. A station outage to repair the seal is scheduled for Spring 2004.