LIC-03-0121, August 2003 Monthly Operating Report for Fort Calhoun Unit 1

From kanterella
Jump to navigation Jump to search
August 2003 Monthly Operating Report for Fort Calhoun Unit 1
ML032651024
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/10/2003
From: Ridenoure R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-03-0121
Download: ML032651024 (2)


Text

it 0" Omaha Pubhc Power DisMMti 444 South 16th Street Mall Omaha NE 68102-2247 September 10, 2003 LIC-03-0121 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

August 2003 Monthly Operating Report (MOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.l.c, Omaha Public Power District (OPPD) submits the attached MOR for August 2003. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, , --

/T Riq oue/ ,  ; . - ,

pivisioi Manag r -a L ucle Operations At ahent i

- c 0 T. P. Gwynn, Acting NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center Employment with Equal Opporhnity

. ,~~~~~~~~~~~~~~~~~~~~~~~~~~

LIC-03-0121 Attachment OPERATING DATA REPORT DOCKET NO. 50-285 -  :

UNIT NAME Fort Calhoun Station DATE September 2, 2003 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: August 2003 Design Electrical Rating (MWe-Net): 478 Maximum Dependable Capacity (MWe-Net): 478 MONTH YR-TO-DATE CUMULATIVE m lerof I~u u rs eor-wass l ritica h- - -- - -- 44 - 5,832..213,Q7i =

Number of Hours Generator was On-line: X 744 5,832 211,760 Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWh): 345,682 2,709,745 . 91,725,775 (1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

I -- .- - U ~ tY-- 1 - I - - - - - -- _ _ _

The Fort Calhoun Station operated at a nominal 100% power for the month.