"WmM mm

~-

u-X Omaha Public PowerDis 444 South 16th Street Aall Omaha NrE 68102-2247 December 15, 2003 LIC-03-0159 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk


'asington,-DC--20555-0001

Reference:

Docket No. 50-285

SUBJECT:

November 2003 Monthly Operating Report (M%OR)

Pursuant to Fort Calhoun Station (FCS) Unit No. I Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for November 2003. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, =

RTR/E M/epm Attac ment c: B. S. Mallett, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center

  • r *** . *' *. I.... *' *** . '..' -

Employment with Equal Opportunity I

I LIC-03-0159 Attachment OPERATING DATA REPORT DOCKET NO. 50-285--

UNIT NAME Fort Calhoun Station DATE December 5, 2003 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: November 2003 Design Electrical Rating (NC'-Net): 478 Maximum Dependable Capacity (MWe-Net): 478

_~~~~~~~~~~

___ ON'h

_~

YR-TO-DATE CIILJIATIVE Number of Hours Reactor vas Critical: 720 6,882 214,124 Number of lours Generator was On-line: 716 6,853 212,781 Unit Reserve Shutdown Hlours:

Net Electrical Energy Generated (liN'h): 305,176 3,144,315 92,160,345 UNIT SHUTDOWNS Method of

.Date Type lhDuration I Cause & Corrective No.>^(vv/mnm/d) F: Forced (Hours) Down Action Comments S: Scheduled Reactor 2 (1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination S-Other (Explain)

F-Administrative G-Operational Error (Explain)

Il-Other (Explain)

OPERATIONS SUNIMARY Main generator overspeed testing was conducted on November 2, 2003. The main generator was off the grid for a total of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The plant reached 100% power on November 7, 2003. One of the three circulating water pumps was being repaired.

On November 10, 2003, circulation water pump IC failed leaving only one circulating wvater pump in operation. Plant power was reduced to 92% power. One of the pumps .Xasreturned to service on November 15, 2003. Reactor power was returned to 100% on November 17, 2003. The third circulating water pump was returned to service on November 25, 2003. Power remained at 100% for the remainder of the month.