LIC-04-0028, October 2004 Monthly Operating Report for Fort Calhoun

From kanterella
Jump to navigation Jump to search
October 2004 Monthly Operating Report for Fort Calhoun
ML043140276
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/08/2004
From: Ridenoure R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-04-0028
Download: ML043140276 (2)


Text

Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 November 8,2004 LIC-04-0028 U. S. Nuclear Regulatory Commission I

ATTN: Document Control Desk Washington, DC 20555-0001 Ii I

Reference:

Docket No. 50-285

SUBJECT:

October 2004 Monthly Operating Report (MOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1 .c, Omaha Public Power District (OPPD) submits the attached MOR for October 2004. No commitments are made to the NRC in this letter.

E If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

3 I RTW PM/epm Attachment F

Employment with Equal Opportunity

LIC-04-0028 Attachment OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE November 1,2004 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: October 2004 Design Electrical Rating (MWe-Net): 478 Maximum Dependable Capacity (MWe-Net): 478 MONTH YR-To- CUMULATIVE DATE Number of Hours Reactor was Critical: 745 7056 22 1924 Number of Hours Generator was On-line: 745 7039 220564 Unit Reserve Shutdown Hours: 0 0 0 Net Electrical Energy Generated (MWh): 361084 3359078 95885 181 Method of No. Date Type F: Forced Duration Reason' Shutting Cause & Corrective (yy/mddd) S: Scheduled (Hours) Down Action Comments Reactor' (1)Reason: (2) Method:

A-Equipment Failure (Explain) l-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS

SUMMARY

Fort Calhoun Station operated at a nominal 100 percent power for the month of October 2004.