LIC-04-0022, April 2004 Monthly Operating Report for Fort Calhoun Station, Unit 1

From kanterella
Jump to navigation Jump to search
April 2004 Monthly Operating Report for Fort Calhoun Station, Unit 1
ML041460228
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/12/2004
From: Ridenoure R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-04-0022
Download: ML041460228 (2)


Text

Omaha Public Power Disbict 444 South 16th Street Mall Omaha NE 68102-2247 May 12, 2004 LIC-04-0022 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

April 2004 Monthly Operating Report (MOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1 .c, Omaha Public Power District (OPPD) submits the attached MOR for April 2004. No commitments are made to the NRC in this letter.

. -If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, Attachment c: B. S. Mallett, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center I. I ,t

. 'r

  • ~~ - -ZA~

Employment with Equal Opportunity

LIC-04-0022 Attachment OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE May 3, 2004 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: April 2004 Design Electrical Rating (MWe-Net): 478 Maximum Dependable Capacity (MWe-Net): 478 YR-TO-MONTH CUMULATIVE DATE Number of Hours Reactorwas Critical: 77-- 2,639 - - 2T7,507 Number of Hours Generator was On-line: 561 2,622 216,147 Unit Reserve Shutdown Hours: 0 0 0 Net Electrical Energy Generated (MWh): 251,324 1,255,141 9,378,1244 UNIT SHUTDOWNS TypeMethod of Date F oe Duration l Shutting Cause & Corrective (yyImmldd) Scheduled (Hours) Down Action Comments Reactor 2 1 04/03/26 S 158 B 4 I (1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS

SUMMARY

On April 7, 2004, the plant completed the scheduled maintenance outage. The station continued the power ascension until April 11, 2004, when 100 percent power was reached. The station then operated at a nominal 100 percent power for the remainder of the month of April.