LIC-05-0002, December 2004 Monthly Operating Report for Fort Calhoun

From kanterella
Jump to navigation Jump to search
December 2004 Monthly Operating Report for Fort Calhoun
ML050140081
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/12/2005
From: Tesar M
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-05-0002
Download: ML050140081 (2)


Text

Omaha Public Power O G t 444 South 16th Street Mall Omaha NE 68102-2247 January 12,2005 LIC-05-0002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

December 2004 Monthly Operating Report (MOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1 .c, Omaha Public Power District (OPPD) submits the attached MOR for December 2004. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, M. A. yesar Division Manager - Nuclear Support Services MAT/EPM/epm Attachment Employment with Equal Opportunity

LIC-05-0002 Attachment OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE January 3,2005 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: December 2004 Design Electrical Rating (MWe-Net): 478 Maximum Dependable Capacity (MWe-Net): 478 MONTH YR-To- CUMULATIVE DATE Number of Hours Reactor was Critical: 744 8520 223388 Number of Hours Generator was On-line: 744 8503 222028 Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWh): 362254 407 1297 96597399 Method of Date Type Duration Shutting Cause & Corrective No. F: Forced Reason (yymm/dd) S: Scheduled (Hours) Down Action Comments Reactor (1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C -Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS

SUMMARY

Fort Calhoun Station operated at a nominal 100% power for the month of December, except for a period of approximately 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> at 97% power to test the moderator temperature coefficient.