LIC-05-0002, December 2004 Monthly Operating Report for Fort Calhoun
| ML050140081 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 01/12/2005 |
| From: | Tesar M Omaha Public Power District |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LIC-05-0002 | |
| Download: ML050140081 (2) | |
Text
Omaha Public Power O G t 444 South 16th Street Mall Omaha NE 68102-2247 January 12,2005 LIC-05-0002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Reference:
Docket No. 50-285
SUBJECT:
December 2004 Monthly Operating Report (MOR)
Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for December 2004. No commitments are made to the NRC in this letter.
If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.
Sincerely, M. A. yesar Division Manager - Nuclear Support Services MAT/EPM/epm Attachment Employment with Equal Opportunity
LIC-05-0002 Attachment No.
OPERATING DATA REPORT Method of Shutting Cause & Corrective Reactor Reason Type Duration (Hours)
Down Action Comments Date F: Forced (yymm/dd)
S: Scheduled DOCKET NO.
50-285 UNIT NAME Fort Calhoun Station DATE January 3,2005 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD:
December 2004 Design Electrical Rating (MWe-Net):
478 Maximum Dependable Capacity (MWe-Net):
478 YR-To-CUMULATIVE DATE MONTH Number of Hours Reactor was Critical:
744 8520 223388 Number of Hours Generator was On-line:
744 8503 222028 Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWh):
362254 407 1297 96597399 (1) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C -Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
OPERATIONS
SUMMARY
(2) Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)
Fort Calhoun Station operated at a nominal 100% power for the month of December, except for a period of approximately 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> at 97% power to test the moderator temperature coefficient.