LIC-03-0086, May 2003 Monthly Operating Report for Fort Calhoun Unit 1

From kanterella
Jump to navigation Jump to search
May 2003 Monthly Operating Report for Fort Calhoun Unit 1
ML031710567
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/10/2003
From: Clemens R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-03-0086
Download: ML031710567 (2)


Text

up,"

OmahaPublic Power Disn 444 South 16th Street Mall Omaha NE 68102-2247 June 10, 2003 LIC-03-0086 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

May 2003 Monthly Operating Report (MOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for May 2003. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

R. P. Clemens Division Manager Nuclear Assessments RPC/EPM/epm Attachment c: T. P. Gwynn, Acting NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center Employment with Equal Opportunity e--A'q

LIC-03-0086 Attachment OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE June 2, 2003 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: May 2003 Design Electrical Rating (MWe-Net): 478 Maximum Dependable Capacity (MWe-Net): 478 MONTH-YR-TO-DATE CUMULATIVE--

Number of Hours Reactor was Critical: 744 3624 210,866 Number of Hours Generator was On-line: 744 3624 209,552 Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWh): 360,798 1,684,843 90,700,873 UNIT SHUTDOWNS No. Date F- Forced Type Duration Reason' Method of Shutting Cause & Corrective I

(yy/mn/dd)

A.

II S: Scheduled (Hours)

A.

I A.

A.

Down 2 Reactor2 Action Comments (1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS

SUMMARY

The Fort Calhoun Station operated at 100% power the entire month.

SAFETY VALVE OR PORV CHALLENGES/FAILURES No failures or challenges to safety valves or PORVs occurred during the month.