Omaha PublicPower Distnct 444 South 16th Street Mall Omaha NE 68102-2247 March 12, 2003 LIC-03-0028 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

February 2003 Monthly Operating Report (MOR)

Lvl- "Mr

ýk 4L Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1.c, Omaha MNW Public Power District (OPPD) submits the attached MOR for February 2003. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Attachment c: E. W. Merschoff, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center Winston & Strawn 4171 Employment with Equal Opportunity

LIC-03-0028 Attachment OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE March 3, 2003 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: February 2003 Design Electrical Rating (MWe-Net): 478 Maximum Dependable Capacity (MWe-Net): 478 MONTH YR-TO-DATE CUMULATIVE Number of Hours Reactor Nvas Critical: 672 1,416 209,378 Number of Hours Generator was On-line: 672 1,416 207,344 Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWh): 328,749 693,648 89,709,678 (I) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS

SUMMARY

The Fort Calhoun Station operated at a nominal 100% power for the entire month.

SAFETY VALVE OR PORV CHALLENGES/FAILURES No failures or challenges to safety valves or PORVs occurred during the month.