July 2004 Monthly Operating Report for Fort Calhoun
ML042260324
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/12/2004
From: Herman J
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-04-0025
Download: ML042260324 (2)


Text

-

Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 August 12,2004 LIC-04-0025 U. S. Nuclear Regulatory Comniission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

July 2004 Monthly Operating Report (MOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for July 2004. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855 Sincerely, JBH/EPM/epm Attachment c:

B. S. Mallett, NRC Regional Administrator, Region 1V A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center Employment with Equal Opportunity

~

LIC-04-0025 Attachment No.

OPERATING DATA REPORT Method of Date Type Duration Shutting Cause & Corrective Reason F: Forced (Hours)

Down Action Comments Reactor2 (yymm/dd)

S: Scheduled DOCKET NO.

50-285 UNIT NAME Fort Calhoun Station DATE August 2,2004 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD:

Julv 2004 Design Electrical Rating (MWe-Net):

p78 Maximum Dependable Capacity (MWe-Net):

p78 YR-To-CUMULATIVE DATE MONTH Number of Hours Reactor was Critical:

744 4847 219715 Number of Hours Generator was On-line:

744 4830 218355 Unit Reserve Shutdown Hours:

0 0

0 Net Electrical Energy Generated (MWh):

349079 2304937 9483 1040 (1) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(2) Method:

l-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)

OPERATIONS

SUMMARY

Fort Calhoun Station operated at a nominal 100 percent power for the month of July 2004.