ML023540393
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/12/2002
From: Ridenoure R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-02-0141
Download: ML023540393 (3)


Text

  • ,mmmmrwwm*,mimr OmahaPublic Power Distnict 444 South 16th Street Mall Omaha NE 68102-2247 December 12, 2002 LIC-02-0141 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

November 2002 Monthly Operating Report (MOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for November 2002. No commitments are made to the NRC in this letter.

If you hlive any jiihetidns, please contact Mr. Erick Matzke at (402) 533-6855.

Attachments c: E. W. Merschoff, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center

'Winston & Sttawn Employment with Equal Opportunity 4171

LIC-02-0141 Attachment 1 Page 1 ATTACHMENT 1 OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE December 02, 2002 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: November 2002

1. Design Electrical Rating (MWe-Net): 478
2. Maximum Dependable Capacity (MWe-Net): 478 OPERATING STATUS YEAR TO MONTH DATE CUMULATIVE
3. Number of Hours Reactor was Critical: 720 7,338 207,218
4. Number of Hours Generator was On-line: 720 7,317 205,184

- 5.--Unit-Reserve-Shutdown--Hours:- ...............

6. Net Electrical Energy Generated (MWh): 353,153 3,443,942 88,651,453

1 LIC-02-0141 Attachment 2 Page 1 ATTACHMENT 2 DOCKET NO. 50-285 UNIT SHUTDOWNS UNIT NAME Fort Calhoun Station DATE December 2, 2002 REPORT MONTH November 2002 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855

,,Type 'Method of Cas orrective Date F, Forced' Duration,,, Shutting Action to No. (YY/MMIDD) S:Scheduled((Hours)n Ra DownReactor" Down Recu PreventAR-t° ....

(1) Reason: (2) Method:

A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS

SUMMARY

The Fort Calhoun Station operated at a nominal 100% power for the entire month.

SAFETY VALVE OR PORV CHALLENGES/FAILURES No failures or challenges to safety valves or PORVs occurred during the month.