m - ;7 Omaha Public PcwrDistjict 444 South 16th Street Mall Omaha NE 68102-2247 April 13, 2004 LIC-04-0021 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

Mearch 2004 Monthly, Operating Report (MIOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. I Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for March 2004. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, R.T ienoure Twc rsident

/RTRI PM/epm Attachment c: B. S. Mallett, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center

'..' 1, bq, Employment wvith Equal Opportunity 2g

LIC-04-002 1 Attachment OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE April 2, 2004 COMIPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: March 2004 Design Electrical Rating (MINN'e-Net): 478 Maximnum Dependable Capacity (MWe-Net): 478 YR-TO-MONTH I CUM IUlATIVE DATE Number of Hours Reactor was Critical: 622 2062 216930 Nuumber of Hours Generator wvas On-line: 621 2061 215586 Unit Reserve Shutdown Hours: 0 0 0 Net Electrical Energy Generated (M\h): 296764 1003817 93529920 (1) Reason: (2) Method:

A-Equipment Failure (Explain) I-Mlanual B-Mlaintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automiatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

- ------ OPERATIONS

SUMMARY

The Fort Calhoun Station (FCS) Nuclear Plant was operated at 100% power until 25 March wvhen the plant commenced a scheduled down power sequence for a planned spring maintenance outage.