LIC-03-0042, March 2003 Monthly Operating Report for Fort Calhoun Station, Unit 1

From kanterella
Jump to navigation Jump to search
March 2003 Monthly Operating Report for Fort Calhoun Station, Unit 1
ML031070423
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/10/2003
From: Ridenoure R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-03-0042
Download: ML031070423 (2)


Text

-P mmm Omaha PubricPower MiMt 444 South 16th Street Mall Omaha NE 68102-2247 April 10, 2003 LIC-03-0042 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

'Docket No. 50-285

SUBJECT:

March 2003 Monthly Operating Report (MOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for March 2003. No commitments are made to the NRC in this letter.

If you have any'4uestions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, DiviTon M ager Nuc ear Op rations Attachment c: E. W. Merschoff, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center Winston & Strawn

/WqA Employment with Equal Opportunity

- -tIC-03-0042 Attachment OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE April 1, 2003 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: March 2003 Design Electrical Rating (MWe-Net): 478 Maximum Dependable Capacity (MWe-Net): 478 MONTH YR-TO-DATE CUMULATIVE Number of Hours Reactor was Critical: 744 2,160 210,122 Number of Hours Generator was On-line: 744 2,160 208,088 Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWh): 284,140 977,787 89,993,817 UNIT SHUTDOWNS No. Date (yy/mni/dd)

Type F Forced Duration S: Scheduled (Hours) 1 Reason' Method of Shutting Down Recor=

Cause & Corrective Action Comments (1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS

SUMMARY

The Fort Calhoun Station operated at 100% power until March 14, 2003, when power was reduced to 30% to allow condenser maintenance. A power increase was started on March 21, 2003. 100% power was reached on March 25, 2003.

SAFETY VALVE OR PORV CHALLENGES/FAILURES No failures or challenges to safety valves or PORVs occurred during the month.