LIC-04-0024, June 2004 Monthly Operating Report for Fort Calhoun
| ML041900396 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 07/06/2004 |
| From: | Ridenoure R Omaha Public Power District |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LIC-04-0024 | |
| Download: ML041900396 (2) | |
Text
.. --- I...
Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 July 6,2004 LIC-04-0024 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Reference:
Docket No. 50-285
SUBJECT:
June 2004 Monthly Operating Report (MOR)
Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for June 2004. No commitments are made to the NRC in this letter.
If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.
Sincerely, V ce Pres ent J 4 (
Attachment c:
B. S. Mallett, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Gamer, NRC Senior Resident Inspector DIP0 Records Center Employment with Equal Opportunity
LIC-04-0024 Attachment Type Duration (Hours)
No.
Date F: Forced (yy/mm/dd)
S: Scheduled OPERATING DATA REPORT Method of Shutting Cause & Corrective Down Action Comments Reactor Reason DOCKET NO.
SO-285 UNIT NAME Fort Calhoun Station DATE July 1,2004 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD:
June 2004 Design Electrical Rating (MWe-Net):
478 Maximum Dependable Capacity (MWe-Net):
q-8 YR-To-CUMULATIVE DATE MONTH Number of Hours Reactor was Critical:
720 4 1 0 3 218971 Number of Hours Generator was On-line:
720 4086 21761 1 Unit Reserve Shutdown Hours:
0 0
0 Net Electrical Energy Generated (MWh):
343313 1955 85 8 9448 196 1 (1) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
(2) Method:
1-Manual 2-Manual TriplScram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)
OPERATIONS
SUMMARY
Fort Calhoun Station operated at a nominal 100 percent power for the month of June 2004.