Other: LIC-03-0110, Unit No.1 TS Updated for NRC Comments on Pending Amendment Request on Pressure-Temperature Limits Report, ML021280278, ML022940186, ML030220153, ML030580351, ML030780605, ML031210545, ML031290602, ML031400506, ML031410096, ML031410107, ML031410212, ML031960625, ML032300003, ML032300305, ML032310200, ML032310213, ML032530228, ML032960189, ML040210769
|
MONTHYEARML0205002282002-02-25025 February 2002 Issuance of Order for Interim Safeguards and Compensatory Security Measures Project stage: Approval LIC-02-0025, Response to Commission Order to Modify License for Interim Safeguards and Security Measures2002-03-15015 March 2002 Response to Commission Order to Modify License for Interim Safeguards and Security Measures Project stage: Request LIC-02-0064, Withdrawal of Request for Hearing on Interim Safeguards and Security Compensatory Measures Order2002-05-17017 May 2002 Withdrawal of Request for Hearing on Interim Safeguards and Security Compensatory Measures Order Project stage: Request ML0212802782002-05-22022 May 2002 Reply to Response to Order for Interim Safeguards and Security Compensatory Measures Project stage: Other LIC-02-0107, August 2002 Monthly Operating Report for Omaha Public Power District2002-09-0909 September 2002 August 2002 Monthly Operating Report for Omaha Public Power District Project stage: Request LIC-02-0090, License Amendment Request, Relocation of Nuclear Detector Cooling Technical Specification 2.13 to Updated Safety Analysis Report2002-10-0808 October 2002 License Amendment Request, Relocation of Nuclear Detector Cooling Technical Specification 2.13 to Updated Safety Analysis Report Project stage: Request ML0229401862002-10-25025 October 2002 Biweekly Notice Memo, Notice of Consideration, Testing Prestressed Concrete Containment Tendons Project stage: Other ML0229504532003-01-16016 January 2003 Issuance of License Amendment No. 215, Missed Surveillances & Adoption of Technical Specification Bases Control Program Project stage: Approval ML0302201532003-01-16016 January 2003 Technical Specification Pages for Amendment 215 Missed Surveillances and Adoption of a Technical Specification Bases Control Program Project stage: Other LIC-02-0105, License Amendment Request, Various Administrative and Editorial Changes2003-01-27027 January 2003 License Amendment Request, Various Administrative and Editorial Changes Project stage: Request ML0306307272003-02-26026 February 2003 Issuance of Amendment No. 216, Relocating TS 3.5(5), Requirements for Testing Prestressed Concrete Containment Tendons to the Updated Safety Analysis Report Project stage: Approval ML0305902712003-02-26026 February 2003 Technical Specifications, Relocation of TS 3.5(5), Requirements for Testing Prestressed Concrete Containment Tendons to the Updated Safety Analysis Report Project stage: Acceptance Review ML0305803512003-02-27027 February 2003 Correction to Amendment No. 215 to Fort Calhoun, Station No. 1. Page 5-17 of Technical Specifications Omitted Reference to SR 3.0.5. Corrected TS Page Encl Project stage: Other ML0307806052003-03-18018 March 2003 Pressure-Temperature Limit Report Submittal Project stage: Other ML0308402732003-03-24024 March 2003 RAI, Related to Integrated Leak Rate Test Surveillance Interval Project stage: RAI LIC-03-0042, March 2003 Monthly Operating Report for Fort Calhoun Station, Unit 12003-04-10010 April 2003 March 2003 Monthly Operating Report for Fort Calhoun Station, Unit 1 Project stage: Request LIC-03-0052, Response to Request for Additional for Information, Pressure-Temperature Limits Report Amendment Request2003-04-10010 April 2003 Response to Request for Additional for Information, Pressure-Temperature Limits Report Amendment Request Project stage: Request LIC-03-0055, Response to Request for Additional Information Integrated Leak Rate Testing Surveillance Interval Amendment Request2003-04-11011 April 2003 Response to Request for Additional Information Integrated Leak Rate Testing Surveillance Interval Amendment Request Project stage: Response to RAI ML0312105452003-04-29029 April 2003 Tech Spec Pages for Amendment No. 217 Modifying TS 2.3.a, to Extend the Allowed Outage Time for a Single Low Pressure Safety Injection Pump from the Existing 24 Hours to 7 Days Project stage: Other ML0312004872003-04-29029 April 2003 Issuance of Amendment No. 217 Modifying TS 2.3.a, to Extend the Allowed Outage Time for a Single Low Pressure Safety Injection Pump from the Existing 24 Hours to 7 Days Project stage: Approval ML0312906022003-05-0808 May 2003 Tech Spec Pages for Amendment No. 218, Administrative and Editorial Changes to FCS TS 1.3 Basis (1); 2.7 (1)a; 2.7 (1)b; 2.7 (1)d; 2.7 (1)i; 2.7 Basis; 3.0.2; Table 3-5, Item 11; and 3.5 (3)ii Project stage: Other ML0312900812003-05-0808 May 2003 Issuance of Amendment No. 218, Administrative and Editorial Changes to FCS TS 1.3 Basis (1); 2.7 (1)a; 2.7 (1)b; 2.7 (1)d; 2.7 (1)i; 2.7 Basis; 3.0.2; Table 3-5, Item 11; and 3.5 (3)ii Project stage: Approval ML0314005062003-05-20020 May 2003 Ltr RELAP5/MOD3.3 Prediction and Model Simulation Project stage: Other ML0314100962003-05-20020 May 2003 Description/Model Simulation (Technical Paper - 5 Pages), Fort Calhoun, S107101 Project stage: Other ML0314101072003-05-20020 May 2003 Listing (Report, Technical - 3 Pages), Fort Calhoun, S107102 Project stage: Other ML0314102122003-05-20020 May 2003 Thesis (Miscellaneous Report - 134 Pages), Fort Calhoun, S107100 Project stage: Other ML0314103762003-05-21021 May 2003 Request for Additional Information Pressure-Temperature Limit Report Submittal (Tac. MB6468) Project stage: RAI LIC-03-0079, Supplemental Response to Request for Additional Information, Integrated Leak Rate Testing Surveillance Interval Amendment Request2003-05-21021 May 2003 Supplemental Response to Request for Additional Information, Integrated Leak Rate Testing Surveillance Interval Amendment Request Project stage: Supplement LIC-03-0081, Response to Request for Additional Information, Pressure - Temperature Limits Report Amendment Request; Low Temperature Over Pressure2003-06-0404 June 2003 Response to Request for Additional Information, Pressure - Temperature Limits Report Amendment Request; Low Temperature Over Pressure Project stage: Response to RAI ML0316800102003-06-17017 June 2003 Request for Additional Information, Use of the Gothic (Version 7.0) Computer Program Project stage: RAI ML0319606252003-07-11011 July 2003 Correction to Amd. 218 for the Fort Calhoun Station, Unit No. 1 (Tac. MB7498) Project stage: Other ML0320202182003-07-18018 July 2003 Ltr Environmental Assessment Relating to Exemption from the Requirements of Appendix G to 10 CFR Part 50 Project stage: Approval ML0320902422003-07-25025 July 2003 Unit 1, License Amendment 219 Modifying Technical Specification 2.1.6 Project stage: Approval ML0321004542003-07-25025 July 2003 Unit 1, Tech Spec Pages for License Amendment 219 Modifying Technical Specification 2.1.6 Project stage: Approval LIC-03-0110, Unit No.1 TS Updated for NRC Comments on Pending Amendment Request on Pressure-Temperature Limits Report2003-08-0505 August 2003 Unit No.1 TS Updated for NRC Comments on Pending Amendment Request on Pressure-Temperature Limits Report Project stage: Other ML0323000032003-08-15015 August 2003 License Amendment No. 220, Grants One-Time Five-Year Extension to Current Ten-Year Test Interval for Containment Integrated Leak Rate Testing Project stage: Other ML0323102002003-08-15015 August 2003 Tech Spec Pages for Amendment No. 221, Use of a Pressure Temperature Limits Report (Ptlr), Change the Minimum Boltup Temperature, Revise the Low Temperature Overpressure Protection (LTOP) Methodology and Analysis Project stage: Other ML0323102132003-08-15015 August 2003 Tech Spec Page to License Amendment No. 220, Grants One-Time Five-Year Extension to Current Ten-Year Test Interval for Containment Integrated Leak Rate Testing Project stage: Other ML0323003052003-08-15015 August 2003 License Amendment No. 221, Use of a Pressure Temperature Limits Report (Ptlr), Change the Minimum Boltup Temperature, Revise the Low Temperature Overpressure Protection (LTOP) Methodology and Analysis Project stage: Other ML0325302282003-09-0404 September 2003 Ft.Calhoun, Closeout Letter - Response to Order for Compensatory Measures Related to Access Authorization Project stage: Other ML0329601892003-10-23023 October 2003 Reply to Response to Order for Fitness-For-Duty Enhancements for Nuclear Security Force Personnel Project stage: Other ML0331002902003-11-0505 November 2003 Issuance of Amendment 222, Authorizing Revisions to the Updated Safety Analysis Report to Incorporate the NRC Approval of the GOTHIC 7.0 Computer Program for Performing Containment Analysis, (Tac. MB7496) Project stage: Approval ML0402107692004-01-0909 January 2004 Closure of NRC TAC Issues Project stage: Other 2003-03-24
[Table View] |
Text
mppm Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 September 9, 2002 LIC-02-0107 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 -
Reference:
Docket No. 50-285
SUBJECT:
August 2002 Monthly Operating Report (MOR)
Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for August 2002.
If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.
Division ana r
Nuclear perations RTR/E M/epm Attac ents c:
E. W. Merschoff, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center Winston & Strawn Employment with Equal Opportunity 4171
LIC-02-0107 Page 1 ATTACHMENT 1 OPERATING DATA REPORT DOCKET NO.
50-285 UNIT NAME Fort Calhoun Station DATE September 03, 2002 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD:
August 2002
- 1. Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net):
(MWe-Net):
OPERATING STATUS MONTH
- 3. Number of Hours Reactor was Critical:
- 4. Number of Hours Generator was On-line:
- 5. Unit Reserve Shutdown Hours:
- 6. Net Electrical Energy Generated (MWh):
744 744 YEAR TO DATE 5,153 5,132 CUMULATIVE 205,033 202,999 2,381,248 87,588,759 478 478 352,874
LIC-02-0107 Page 1 ATTACHMENT 2 DOCKET NO. 50-285 UNIT SHUTDOWNS UNIT NAME Fort Calhoun Station DATE September 3, 2002 REPORT MONTH August 2002 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 Type F.Methodof Ca~fe,&' Corrective I
Date F: Forced Duiatiiio Shutting
S: Scheduled (Hours)
- Reason, Down Reacto, PiVent Recurrence (1) Reason:
(2) Method:
A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test I
2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
OPERATIONS
SUMMARY
The Fort Calhoun Station operated at a nominal 100 % power for the entire month. There are no leaking fuel assemblies and none are expected.
SAFETY VALVE OR PORV CHALLENGES/FAILURES No failures or challenges to safety valves or PORVs occurred during the month.