December 2003 Monthly Operating Report for Fort Calhoun Station
ML040210736
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/08/2004
From: Ridenoure R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-04-0001
Download: ML040210736 (2)


Text

Omaha Public PmwrDistict 444 South 16th Street Afall Omaha NE 68102-2247 January 8, 2004 LIC-04-0001 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

December 2003 Monthly Operating Report (M1OR)

Pursuant to Fort Calhoun Station (FCS) Unit No. I Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for December 2003. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, IM/epm liment c:

B. S. Mallett, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center j7?c$ (4 Employment with Equal Opportunity

LIC-04-0001 Attachment OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-285 Fort Calhoun Station January 2, 2004 E. P. Matzke (402) 533-6855 REPORT PERIOD:

December 2003 Design Electrical Rating (IN'e-Net):

lMaximum Dependable Capacity (Ml'e-Net):

478 478 MONTH YR-TO-DATE CIJUIJLATIVE Number of Hours Reactor was Critical:

Number of Hours Generator was On-line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MN 'li):

744 7,626 214,868 744 7,597 213,525 0

0 0

365,757 3,510,073 92,526,103 UNIT SHUTDOWNS I

~

~ ~ ~ yeMethod of Date Type Duration I

Shutting Cause & Corrective No.

F: Forced Down Action Comments I (yylnim.Idd) 5: Scheduled (urs)

R n

Reactor (1) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator TrainingfLicense Examination F-Administrative G-Operational Error (Explain)

Il-Other (Explain)

(2) lethod:

1-Manual 2-M1anual Trip/Scram 3-Automnatic Trip/Scram 4-Continuation 5-Other (Explain)

OPERATIONS

SUMMARY

Fort Calhoun Station operated at a nominal 100 percent power for the entire month of December.