LIC-04-0029, November 2004 Monthly Operating Report for Fort Calhoun Station

From kanterella
Jump to navigation Jump to search
November 2004 Monthly Operating Report for Fort Calhoun Station
ML043420023
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/06/2004
From: Bannister D
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-04-0029
Download: ML043420023 (2)


Text

.

MBpM

-I Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 December 6,2004 .

LIC-04-0029 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

November 2004 Monthly Operating Report (MOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. 1 Technical Specification 5.9.1 .c, Omaha Public Power District (OPPD) submits the attached MOR for November 2004. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, D. J . Bannister Manager -Fort Calhoun Station D JBiEPMiepm Attachment Employment with Equal Opportunity

LIC-04-0029 Attachment OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE December 2.2004 COMPLETED BY E. P. Matzke TELEPHONE (402) 533-6855 REPORT PERIOD: November 2004 Design Electrical Rating (MWe-Net): p78 Maximum Dependable Capacity (MWe-Net): 478 MONTH YR-TO-DATE CUMULATIVE Number of Hours Reactor was Critical: 720 7,776 222,644 Number of Hours Generator was On-line: 720 7,759 22 1,284 Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWh): 349964 3,709,042 96,235,145 Method of Date Type Duration Reason' Shutting Cause & Corrective No. F: Forced (yy/mm/dd) S: Scheduled (Hours) Down Action Comments Reactor*

(1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS

SUMMARY

Fort Calhoun Station operated at a nominal 100 percent power for the month ofNovember 2004.