NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With
ML20195E521
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/31/1998
From: Kaminskas V, Koudelka M
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NPL-98-0948, NPL-98-948, NUDOCS 9811190007
Download: ML20195E521 (9)


Text

-. . .- - - - _ _

.. i -

6 Wisconsin  !

'Electnc 9 POWER COMPANY \

Point Beoch Nuclear Plant (920) 755-2321 6610 Nuclear Rd., Two Rivers. WI 54241 j NPL 98-0948 i

November 10,1998

)

Document Control Desk i U. S. NUCLEAR REGULATORY COMMISSION )

' Mail Station P1-137 Washington,DC 20555 l Ladies / Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2

. Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of October,1998. .

1 Sincerely, 1

, v l ito A.Kaminskas Manager, Regulatory Services & Licensing MBK/dms Attshments i t l cc: J. D. Loock, PSCW y t,,

l l

NRC Regional Administrator, Region III NRC Resident Inspector

' '), I E

9811190007 981031 POR ADOCK 05000266:

R PDR, A n+sWwrof MisamshiEwas rapwatkin

OPERATING DATA REPORT DOCKET NO. 50-266 DATE 11/06/98 .' l COMPLETED BY: M. B. Koudelka TELEPHONE-(920) 755-6480 OPERATING STATUS i

1. UNil' NAME POINT BEACil NUCLEAR PLANT - UNIT 1 NOTES
2. REPORTING PERIOD: October- 1998
3. LICENSED TIIERMAL POWER (MWT): 1,518.5 .
4. NAMEPLATING RATING (GROSS MWE): 523.8 l S. DESIGN ELECTRICAL RATING (NET MWE): 497.0  ;
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 t
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCLUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: l
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASCNS NR RESTRICTIONS,(IF ANY)-

NA l THIS MONTH -YEAR TO DATE CUMUI ATIVE I1. HOURS IN REPORTING PERIOD 745.0 7,296.0 245,328_0

12. NUMBER OFIIOURS REACTOR WAS CRITICAL 745.0 4,091.0 198,882.5
13. REACTOR RESERVE SilUTDOWN HOURS 0.0 0.0 667.3
14. IlOURS GENERATOR ONLINE 745.0 4,026.2 195,553.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,109,611.0 5,793,688.0 277,885,741.0
17. GROSS ELECTRICAL ENERGY GENERATED 388,350.0 2,016,900.0 94,004,660.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 371,971.0 1,918,041.5 89,599,882.5
19. UNITSERVICEFACTOR -100.0 % 55.2 % 79.7 %
20. UNIT AVAILABILITY FACTOR 100.0 % 55.2 % 80.1 %
21. UNIT CAPACITY FACTOR (USING MDC NET) 102.9 % 54.2 % 75.0 % ,
22. UNIT CAPACITY FACTOR (USING DER NET) 100.5 % 52.9 % 73.5 %
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 4.7%
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEI'rEMBER 22,1977

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 .-~

~

AVERAGE DAILY UNIT POWER LEVEL -.

DATE: 11/03/98

  • MONTH OCTOBER - 1998 COMPLETED BY: M. B. Koudelka TELEPHONE: (920) 755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY A1We NET DAY MWe NET DAY MWe NET 1 253 11 508 21 513 2 447 12 508 22 512 3 509 13 509 23 513 4 509 14 509 24 512 5 507 15 508 25 511 6 511 16 509 26 511 7 503 17 509 27 515 8 506 18 509 28 505 l 9 508 19 512 29 515 10 508 20 512 30 508 31 508

POINTBEACH NUCLEAR PLANI Docket No.' 266 -

UnbName~ Point Beach. Unit 1 - .

UNITSHUTDOWNS AND POWER REDUCTIONS Date 11/3/98 Completed By M. B. Koudelka REPORT MONTH OCTOBER- 1998 Telephone No. 920 0 55-6480 .-

Methodof LicenseeEvent Duration ReactorShut Repon No. - Sysum Component CauseamiCorrectiveActon No. Dew Type' (Hours) Reasor/ Down/ Code' Code' To PreventRecurrence ,

NA NA NA NA NA NA . NA NA NA

'F: Forced ' Reason: ' Method: ' Exhibit G - Instructions S: Scheduled A - Equipmert Failure (explain) 1 - Manual for preparationof B - Main +acaceor Testing 2 - Manual Scram data entry sheets C - Rebv. ling 3 - AutomaticScram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuationof E - OperatorTraining & Previous Shutdown Licensing Exam 5 - Reduced Load F- Admmistrative 6 - Other(explain) ' Exhibit I- Same Source G - OperationalEnor(explain)

H - Other(explain)

PBF-0028b (03 0 )

1

__-___2

DOCKET NO. 50-266 UNITNAME Point Beach Unit 1 DATE 11/04/98 COMPLETED BY M. B. Koudelka TELEPHONE 920/755-6480 The daily power average for Unit I during October,1998, was 499.3 MWe.

The following Licensee Event Reports (LERs) were submitted to the NRC during June,1998:

' LER 266/1998-003-01, Containment Accident Fan Motor Cooler Heat Exchanger Flow Rates Found to be Outside the Design Basis of the Plant.

LER 266/1998-026-00, Boron Dilution Analysis Did Not Address All Water Flow Paths.

Safety-related maintenance included:

1.' 1B52-421IM power to W-21 A primary auxiliary building exhaust stack fan control power transformer replaced.

2. D-12-19 power to 1DY-01 red inverter breaker replaced.
3. D-41-01 alternate de power to C-79 G-02 emergency diesel generator de power transfer panel breaker replaced.
4. D72-05-07 power to D-41 de distribution panel breaker replaced.

l i

I

- OPERATING DATA REPORT DOCKET NO. 50-301.

DATE- 11/06/98 . .

COMPLETED BY: M. B. Koudelka

~

TELEPHONE- (920) 755-6480 - .

~ OPERATING STATUS

.1. UNIT NAME- POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES

2. REPORTING PERIOD: October- 1998
3. LICENSED THERMAL POWER {MWT): 1,518.5

- 4. NAMEPLATING RATING (GROSS MWE): 523.8

5. DESIGN ELECTRICAL RATING (NET MWT): 497.0 -
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. M AXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS IUR RESTRICTIONS,(IF ANY):

NA THIS MONTH YEAR TO DATE CUMULATIVE I1. HOURS IN REPORTING PERIOD 745.0 7.296.0 230,113.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 5,839.9 193,724.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ONLINE 745.0 5,794.0 191,090.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,064,338.0 8,670,309.0 274,846,257.0
17. GROSS ELECTRICAL ENERGY GENERATED 361,510.0 2,952,700.0 93,432,250.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 345,082.0 2,813,789.5 89,034,550.5
19. UNITSERVICEFACTOR 100.0 % 79.4 % 83.0 %
20. UNIT AVAILABILITY FACTOR 100.0 % 79.4 % 83.2 %
21. UNIT CAPACITY FACTOR (USING MDC NET) 95.5 % 79.5 % 79.3 %

22." UNIT CAPACITY FACTOR (USING DER NET) 93.2 % 77.6 % 77.9 %

?.3. UNIT FORCED OUTAGE RATE 0.0% 20.6 % 2.4%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DUR ATION OF EACH):

Refuelmg.12/05/98,68 days 25 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DA~m OF STARTUP:

NA DATA REPORTED AND FACTORS C#LCULATED AS REQUESTED IN NRC LETTER DATED SEl'TEMBER 22,1977

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 .

AVERAGE DAILY UNIT POWER LEVEL *'

DATE: 11/03/98 ,

MONTH OCTOBER - 1998 COMPLETED BY: M. B. Koudelka TELEPHONE: (920) 755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 496 11 494 21 499 2 497 12 494 22 499 3 495 13 495 23 488 4 495 14 495 24 112 5 493 15 495 25 115 1 6 495 16 495 26 395 7 490 17 496 27 457 8 492 18 495 28 477 9 493 19 497 29 488 10 494 20 500 30 483 31 467

. ._~ .. . . - .

fi __ __

POINT BEACH NUCLOR PLANT Docket No. 50-301 Unit Name Point Beach. Unit 2 ,

  • UNIT SHUTDOWNS AND PO%ER REDUCTIONS Date 11/3/98 Complete: q M. B. Koudelka REPORT MONTH OCTOBER- 1998 Telephone No. 920n55-6480 .

Method of lxensee Event Duration ReactorShut Report No. System Component Causeand CorrectiveAction .

No. Date Type' (Hours) Reasod Down' Code' Code' To Prevert Recurrence .

3 981023 F 0 B 5 NA ED TRANSF The unit was taken to 22% power to allow for the disconnecrof 2X4)2 unit auxiliary transformer from the grid for troubleshoonngpurposes. The unit returned to full end oflife power on October 9,1998.

i t

'F: Forced ' Reason: ' Method: ' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparationof B - Maintenanceor Testing 2 - Manral Scram data entry sheets C - Refueling 3- AutomaticScram LER file (NUREG-0161)  ;

D - Regulatory Restriction 4 - Continuationof E - OperatorTraining & Previous Shutdown Licensing Exam 5 - Reduced Imad '

F- Administrative 6 - Other(explain) 'ExhibitI- Same Source G - OperationalError (explain)

II- Other(explain) t PB N i (03-90)

i

  • , I

-O g DOCKET NO. 50-301

- UNIT NAME _ . Point Beach Unit 2

' DATE 10/04/98

- COMPLETED BY . M. B. Koudelka TELEPHONE 920/755-6480 i

- The daily power average for Unit 2 during October,1998, was 463.7 MWe.

Safety-related maintenance included:

1 2P-11 A component cooling water pump oil sampled and changed.