Category:Environmental Monitoring Report
MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-156, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-06-25025 June 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-132, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-05-18018 May 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML22122A0562022-05-0202 May 2022 2021 Annual Environmental Operating Report (Non-Radiological) ML22122A0552022-04-25025 April 2022 2021 Annual Radioactive Effluent Release Report and 2021 Annual Radiological Environmental Operating Report L-22-107, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-04-22022 April 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-093, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152022-03-21021 March 2022 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-22-055, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for January 20222022-02-15015 February 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for January 2022 L-21-286, Notification of New National Pollutant Discharge Elimination System (NPDES) Permit Receipt2021-12-23023 December 2021 Notification of New National Pollutant Discharge Elimination System (NPDES) Permit Receipt L-21-258, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152021-10-18018 October 2021 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-21-237, Submittal of Discharge Monitoring Report the August 2021 Permit No. PA00256152021-09-20020 September 2021 Submittal of Discharge Monitoring Report the August 2021 Permit No. PA0025615 L-21-216, Beaver Valtey Power Station, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA80256152021-08-11011 August 2021 Beaver Valtey Power Station, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA8025615 L-21-193, Discharge Monitoring Report (NPDES) Permit No. PA00256152021-07-22022 July 2021 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-21-144, April 2021 NPDES Discharge Monitoring Report (DMR) for Energy Harbor Nuclear Corp, Beaver Valley Power Station (BVPS)2021-05-14014 May 2021 April 2021 NPDES Discharge Monitoring Report (DMR) for Energy Harbor Nuclear Corp, Beaver Valley Power Station (BVPS) ML21127A1622021-04-30030 April 2021 2020 Annual Radioactive Effluent Release Report and 2020 Annual Radiological Environmental Operating Report ML21127A1552021-04-30030 April 2021 2020 Annual Environmental Operating Report (Non-Radiological) L-21-124, Discharge Monitoring Report (NPDES) Permit No. PA00256152021-04-12012 April 2021 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-21-112, Submittal of Discharge Monitoring Report (NPDES) Permit No PA0025615 for February 20212021-03-23023 March 2021 Submittal of Discharge Monitoring Report (NPDES) Permit No PA0025615 for February 2021 ML21063A2542021-02-23023 February 2021 Discharge Monitoring Report Cnpdes) Permit No. PA0025615 L-21-043, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152021-01-21021 January 2021 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-20-333, November 2020 Discharge Monitoring Report (NPDES) Permit No. PA00256152020-12-17017 December 2020 November 2020 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-20-314, Submittal of October 2020 Discharge Monitoring Report2020-11-24024 November 2020 Submittal of October 2020 Discharge Monitoring Report L-20-308, (BVPS) Pre-Draft NPDES Permit No. PA0025615, Comments Submitted in Response to Comments from DEP Received 08/10/20202020-11-18018 November 2020 (BVPS) Pre-Draft NPDES Permit No. PA0025615, Comments Submitted in Response to Comments from DEP Received 08/10/2020 L-20-284, Discharge Monitoring Report2020-10-26026 October 2020 Discharge Monitoring Report L-20-261, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152020-09-21021 September 2020 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-20-242, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 for July 20202020-08-25025 August 2020 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 for July 2020 L-20-191, Energy Harbor - Enclosed May 2020 NPDES Discharge Monitoring Report, Beaver Valley Power Station & Supplemental Monitoring Data for Outfall 001 (Dissolved Oxygen)2020-06-24024 June 2020 Energy Harbor - Enclosed May 2020 NPDES Discharge Monitoring Report, Beaver Valley Power Station & Supplemental Monitoring Data for Outfall 001 (Dissolved Oxygen) L-20-160, Submittal of Comments in Response to SOOP-04-00086 Draft Comments2020-05-18018 May 2020 Submittal of Comments in Response to SOOP-04-00086 Draft Comments L-20-135, March 2020 NPDES Discharge Monitoring Report (DMR) for Beaver Valley Power Station2020-04-22022 April 2020 March 2020 NPDES Discharge Monitoring Report (DMR) for Beaver Valley Power Station L-20-164, Discharge Monitoring Report (NPDES) Permit No. PA00256152020-04-22022 April 2020 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML20125A1832020-04-13013 April 2020 Annual Radioactive Effluent Release Report and Annual Radiological Environmental Operating Report ML20097E3762020-03-24024 March 2020 Station. Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML20125A1762020-03-12012 March 2020 Annual Environmental Operating Report Non-Radiological L-20-056, Transmittal of Discharge Monitoring Report2020-02-17017 February 2020 Transmittal of Discharge Monitoring Report L-20-035, Discharge Monitoring Report (NPDES) Permit No. PA00256152020-01-22022 January 2020 Discharge Monitoring Report (NPDES) Permit No. PA0025615 2023-09-14
[Table view] Category:Letter type:L
MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)2023-03-0404 March 2023 Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027) L-23-073, Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0101 March 2023 Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report2023-02-21021 February 2023 Twenty-Eighth Refueling Outage Inservice Inspection Summary Report L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-193, Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H2023-02-14014 February 2023 Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H L-22-286, Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time2023-02-14014 February 2023 Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-246, Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO2022-12-0707 December 2022 Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-226, Emergency Preparedness Plan2022-11-0404 November 2022 Emergency Preparedness Plan L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2022-10-26026 October 2022 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-22-200, Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage2022-10-21021 October 2022 Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage L-22-232, Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes2022-10-21021 October 2022 Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-204, Submittal of Evacuation Time Estimates2022-09-0707 September 2022 Submittal of Evacuation Time Estimates L-22-137, Request for Fire Protection Program Changes2022-09-0606 September 2022 Request for Fire Protection Program Changes L-21-238, License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident2022-08-31031 August 2022 License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident L-22-188, Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-08-22022 August 2022 Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage L-22-191, Spent Fuel Storage Cask Registration2022-08-17017 August 2022 Spent Fuel Storage Cask Registration 2023-09-14
[Table view] |
Text
energy Beaver Valley Power Station 200 State Route 3016 P.O. Box 4 harbor Shippingport, PA 15077-0004 October 3, 2022 L-22-227 eDMR for Electronic Submission Department of Environmental Protection Bureau of Water Quality Management 400 Waterfront Drive Pittsburgh, PA 15222
SUBJECT:
Beaver Valley Power Station Discharge Monitoring Report (NPDES) Permit No.
PA0025615 Enclosed are the Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (DMR), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins detailing the reason for the original August 2022 incomplete DMR data.
Aluminum sample analysis data for Outfalls 003 & 004 was not provided by the contract lab prior to the August 28 , 2022 DMR submission deadline. This revised submission includes the sample results for these Outfalls. A review of the data indicates no permit parameters were exceeded during the month. Outfall 001 flow data remains unavailable as documented in the original August 2022 DMR submission.
Should you have any questions regarding the attached and enclosed documents, please direct them to James Harvey, at 724-682-7358.
Sincerely,
//JL-Bob Kristophel General Plant Manager
Beaver Valley Power Station, Unit Nos. 1 and 2 L-22-227 Page2 Enclosure(s):
A. Revised Monthly Discharge Monitoring Report B. Revised Outfall 003 & 004 Daily Effluent Monitoring Reports C. Eurofins Corrective Action Letter cc: Document Control Desk US NRC (NOTE: No new US NRG commitments are contained in this Jetter.)
L-22-227 ENCLOSURE A
3800-FM-BCW046212/2016 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION pennsylvania BUREAU OF CLEAN WATER DISCHARGE MONITORING REPORT (DMR)
- DEPARTMEHrOl'ENVJRONMEHfAI.
l'IIOT!CTJOH NAME: ENERGY HARBOR NUCLEAR CORP PA0025615 003 Reporting Frequancy: Monthly ADDRESS: 168 E MARKET ST, AKRON OH, 44308-2014 PERMIT NUMBER OUTFALL NUMBER DMR Effective From: 08/01/2022 FACILITY: FIRSTENERGY BEAVER VALLEY POWER STATION 1 DMR Effective To: 08/31/2022 LOCATION: PA ROUTE 188, SHIPPINGPORT PA, 15077 MONITORING PERIOD Permit Expires: 10/31/2026 STAGE: _Fl_n_a_lE_ffl_u_on_t_ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Permit Applicatloo Due: 05/0<l/2026 YEAR MO DAY YEAR MO DAY No Discharge:
D FROM 2022 08 01 TO 2022 08 31 PARAMETERS REPORTED VALUES QUANTITY OR LOADING QUANTITY OR CONCENTRATION PARAMETER SAMPLING FREQUENCY SAMPLING TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS Anvnonie-Nitrogen (00610) Sampte Measurement Pennit Requirement ... ... ...
GG Monilor&Report A"IIMo GG Monltor&R&port DelyMu mg.I.
,,.,... Q,ab Akmlnum, Total (01105) Sample Meesuntment P&m'\itReqUtl'EKMl\t ... ... ... Monito, & Repo,t
.33 Momtor& Repo,t OaiyMu mg.I. 2/montt, 2/montt, z~Composlte A"IIMo F clllty Paramet., Aluminum data fof OUtfalls 003 & 004 II not avaMable at the "me of lnlUal sut>mktal due to delays In contract lab providing analysis. Sarnpes were pttWldt,d to the lab and reoelved on 9/1/2022, but contamination at lhe iab ,equired the anatysta to Commentl be re-run. Aluminum data wil be provk1ed wtth a revised DMR IUbmittal WMn ~ - 10rl3/2022
- Alum6num data Is avallabte and b()ir1g ,..po,1ed in rhil OMR revfsJon.
Flow (50050) Sample Measurement Pennlt Requirement 1.29 Monitor& Report 1.401 Monitor & Report MGO
... ... ... 2/month 2/montt, ........
Estimate A"IIMo OalyMu
< .034 < .034 mg,\, Gnob Nalco H150M (51698) Sample Measurement Permit Requirema,t ... ... .03'1 .03'1 Daly Max
"'81>
A"IIMo Mercury, Total (71900) Sample Measurement ... ... ... ... < .2 < .2 ..... 2/montt, Gnob Permit Requirement - ... ... Moniklf& Report A,gMo Monltor&Repoft 21""""" G,ab Hyclrazine (81313) ....................
Pennlt Requnrneflt GG
.007 OaiyMax GG
.007 mgll
,..... Gn,b
- .. Mo Daly Max Faclllty SampUng Point Commentl Aluminum data for Outfalls 003 & 004 Is not avallabkl at the time d Initial submittal due to delays In contract lab providing analysis. Samptea we,e ptOYided to the lab and rec;etYed on 9'112022. but oont.rnln:ltlon 11 the lab requir.d lhe analysis m be re-Nn. NumwJm data wtl be provided with a revtsed DMR aubmtttal when rec:efved.
Privacy Polley I Security Policy Copyright ©2016 Commonwealth of Pennsylvania. All Rights Reserved
I 3800-FM-BCW0462 12/2016 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION
BUREAU OF CLEAN WATER DISCHARGE MONITORING REPORT (DMR)
PIIOl'fCTIOH NAME: ENERGY HARBOR NUCLEAR CORP PA0025615 I 004 Reporting Frequ&ncy: Monthll ADDRESS: 168 E MARKET ST, AKRON OH, 44308-2014 PERMIT NUMBER IOUTFALL NUMBER DMR Effective From: 08/01/2022 FACILITY: FIRSTENERGY BEAVER VALLEY POWER STATION 1 DMR Effective To: 08/31/2022 LOCATION: PA ROUTE 168, SHIPPINGPORT PA, 15077 MONITORING PERIOD Permit Expires: 10/31/2026 STAGE: Final Effluent Permit Application Due: 05/0<4/2026 YEAR MO I DAY IYEAR MO I DAY No Discharge :
FROM 2022 08 01 TO 08 31 D
I 2022 I I PARAMETERS REPORTED VALUES QUANTITY OR LOADING QUANTITY OR CONCENTRATION PARAMETER SAMPLING FREQUENCY SAMPLING TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS Temperatur1(degF)(00011) .................... ... ... ... ... ... 88.2
"' 1/dey 1-S Pennit Requirement - ...
110 Daly Mu:
1..., 1-S Simple MeffUl'9mtnt ... ... 7.6 7.9 S.U Gn,b pH (00<00)
Pennlt Requirement ... ... 6.0 ... 0.0 1-1-
IMAX
... ... ... Inst Mln Chromium, Total (01034) Sample Meuurement
... ... GG GG mg/l
" -* Total (01042)
Zinc. Total (01092)
PennitReqolreme,nt
~ Measurement Pemwt R~
Sample Measuremenl
.2 A,.Mo Monllof& Repo,t A"'Mo GO OolyMu
.2
.0035 Manllof & Repo,t OolyMax GG mg/l mg/l 2/monlh U<wc.n-.
G,ab AkifflWIUffi, Total (01105)
. . . R_
Penni!: ReqolNwMnl:
fllcllt t y P ~
1.0
.23 Monilor I Repo,t 1.0 Ooly Max
.24 Monllor & Repo,t OolyMax mg/l
~ data Jot Outfalls 003 I 004 II not 8't'alab6e et lhe llme d inidal submllial ck,- to delays In connct l a b ~ W\llltya. Sernpln wier11 pn:Mded to lhe lab and ~
1-2/monlh U<i<Compotll*
on 91112022, blJt oontamln8tion M the l a b ~ the anatysts to c- be '9-Nn. Alumirun dattl 'llllil be proYid<<t wi1h a m4Md OMR IIJbrnittlll whef1 ~ - 10l3/2022
- Alumli!'un data Is avaleble eod Ming reported In tN1 OMR re\'lllon.
Flow (S0000) Sample MHIUretnent .28 3.85 MGO 1/dey Monitor& R~ Morvlor& Report ... ... ... 1- .,_
A,.Mo OalyMu Sampte Menuntmenl < .02 < .02 Total Re~ Chlorine (TRC) (50060)
... ... mg/I. 1-
. . . R_
Ff'M Available CHome (50064)
Faclltty SampOng Potnt c ~
Permit Requnmenl be pn,vtded wilh a revised OMR submitbl when rec9ftled.
< .02
.2 A,.Mo 1.25 IMAX
< .02 OolyMu mg/I.
1-Gn,b Gnob Aluminum ct.ta for Outfall 003 & 004 rt not available Ill the tima of Initial submittal due to delays in oontntct l(lb p,O¥ktlng analyals. Semp&n W9f'9 pr'O\'ided to the lab and rec:.ived on 9'11;Hl22, but contamination at the i.b ~ e d the anelysil i:> be l'M\ffl. Aluminum data wil Privacy Policy I Security Policy Copyright ©2016 Commonwealth of Pennsylvania. All Rights Reserved
3800-FM-BCW046212/2016 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION pennsylvanta BUREAU OF CLEAN WATER DISCHARGE MONITORING REPORT (DMR) 0£PAATMiH1'0,~ A I , .
- PIIOfU.TiOlf ATTACHMENT DETAILS FMINUM Attac:flnMftt:Type UptoaMdTime Attachment COfflfflfflta
&gned Cover Letter August 2022 Rlt\llsed OMRpdf Covwlett* 2022-10-11T08:23:17-04:00 R.evlalonecw..-Lettet Aogu&t 2022 Reviled Daly Effluent Forma.pdf Daly Eflluent ~ Form 2022-10-11T08:24:43-44:00 llfl'lfsed 003 l 004 Daty Efluenc Forms Ene,gy Hattlof Comtc1IYe Action Letter09282022.pdf t.etter ExJ,latning Non-Comptlanoe 2022-10-11T08:26:1.<<M:00 Latte, fl"om contnct labofatoty * ~ the CM&ay In anatytlcail r-.Nts lndlng to ., Incomplete origlnlll D M R ~.
Cooling Watlf krtake Monitoring Fonns Augu.t 2022 BVPS DMR.pdf 00,., 2022-09-28T13 :59:46-04:00 Coding Watet , ~. Monitoring Forms Augult 2022 BVPS DMR Non-CompHanoe Reporting Form August 2022 BVPS OMR.pctf Letter E)lNlnlng Non-Comptlance 2022.ot-211T14:00'.20-o4:00 Chemk::111 Mditl¥es l.1-.ge Fonns A&lgl.,st 2022 BVPS OMR.pdf Chamical Addllwts Uuge FOffll 2022-09-211T13:58:>>-04:00 Otriy Efl\lent Moniloring Forms August 2022 BVPS OMR.pdf Oely Effluent Moniloring Form 2022-09-28T13:59:09-04:00 COY9I' Leite,~ August 2022 BVPS OMR.pdf Coverlettet 2022-09-28T13:57:52-04:00 PERMIT VIOLATIONS Non-Compllanc. IO UmttType PerrnltLiffllt Unit hmpllng Point CeuH Of Non-CompHence c.........
UNAUTHORIZED DISCHAR(>ES No~ompHance ID Ewnt Start Date Event El'ld Date Date and Time Discovered ..........
DlschargN Event Loc.tlon Yotume (gel) Dwatlon (hrs) R.c.etvtng Wat.rs Impact On Wettr1 Datt *nd Time DEP Notlfted O,ally OTHER PERMIT VIOLATIO NS Jton-Compffance Type P.rmltl.lmft c-174745 Use of NOOI Code E o, FF Fina1Eflluent(O(J1) Morilor& Repc,11 1741748 UN of NOOI Code E or FF Fa-'81Eflluent(001) Monitor& R9J)Ol1 COMMENT DETAILS com..-. ~r*lor Certmc.tton Numb<<
SUBMISSION INFORMATION SUBMITTED BY *Pursuant to the Pennsytvania Electronic Transactions Act - Act 69, effective January 15, 2002, you are about to ongage In an TELEPHONE DATE GREENPORT USER electronk: transaction with the Commonwealth of Pennsylvania. You are submrtting official information. You certify under Scott Yori<
penalty of law that this document and all attachments were prepared under your direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the lnfonnatlon submitted. Based on your inquiry of (724) 508-8002 2022 10 12 the person or persons who manage the system or those persons directly responsible fo, gathertng the Information, the scottyorlt13 information submitted Is, to the best of your knowledge and belief, true , accurate and complete. You are aware that any false SUBMITTED BY statement may be subject to substanUal civil and criminal penalties, including 18 P.S. sectton 4904 (relating to unswom AREA CODE NUMBER YEAR MO DAY FULL NAME falsification to authorities).
Privacy Polley I Security Polley Copyright ©2016 Commonwealth of Pennsylvania. All Rights Reserved
L-22-227 ENCLOSURE B
-~~~,~ SUPPLEMENTAL REPORT DAILY EFFLUENT MONITORING MOl>-fM~l:l/1011 Facility Name: Buver vanex; Power Station Month: 8 (Nlo<tnuml>o<) Yea~ 2022 Municipality: Sh1eeln9~ Borou11i county: leaver Permit No.: PA0025815 Outfall: 003 Watershed: 20-8 Renewal apphcation aue lDJ!!n plior to expiration.
Laboratories: Ttatlmerki BVPS i..b This permij will expire on: oetober 31 1 2021 Flow NH3~ Total Aluminum Total M..,cury Hydrazine NMCOH1!50M M~
1
. 1
-* u 1
- . u 1
1 u
1 u D D w w w u u 1 Sun 7/31l'Z2 Mon 811122 Tue 8f2J22 < 0.0002 -
Wed 813122 Thu 814122 Fri 815122 Sat 816122 - -
2 Sun an122 Mon 818122 Tue 819122 < 0.0002 Wed 8110122 < 0.0002 < 0.034 Thu 8111122 Fri 8112/22 Sat 8113122 3 Sun 811'4122 Mon 8115122 Tue 8116122 < 0.0002 Wed 8117122 < 0.034 Thu 8116122 Fri 811!1122 Sat 8l20IZ2
- Sun Mon 8121122 8122/22 < 0.0002 Tue 8123122 < 0.0002 Wed 812'4122 < 0.0002 Thu 8125122 < 0.0002 Fri 8126122 < 0.0002 Sat 8127122 < 0.0002 5 Sun .,,.,,, 1.179 0.21 Mon 8129122 < 0.0002 Tue 8130122 1.401 0.33 Wed 8131122 Thu 9/1122 Fri 912/22 Sat w .v Oolly-(Conc.) u., < < o.o...
Oolly-(Conc):
Me Avg WNJ6t (Cone.):
A " " - (Conc.~
0.33 0.27 0.2T 0.0002 0.0002 0.0002 0.034 0.03 0.03 Gecmltric Meerl(Conc.):
MIIXAvgWfl!flay(Loed): 1.29 3 < <
A""-(Loodt- 1.29 3 < <
T°"'_(tood), di 92 < <
Oolly..........,(tood), 1.179 2 -
DllyMulnun(Load'): 1.401 IOll'lifylftMl'~ollllwlhlCtt'liadocunrA:-~l.w'ldwmychctionor~lnlOOOrdancewWtas,.aemdnlgr,<<tlo....,.*thaqulifiedpMOnnllfil'lllt-,ind......,hlnformetipn~. Baud tw1 n'IJ ir.c,.iry dthe pnon or per90Nwho~ Iha sytilanor lt-.aM ~ dnctty ,...,.._for ~ h rdormltion., lhl infomwlion ~ Is, to lhl MIi olmy knowledge and beilf, tn.., 90CU"llle and c:omptete. I il"' IIM9NI
,..,_. . . ~peMlliel,for~fahelnkrn,llion, hcb:inglhlpciailMyolfinlW'ldlmprilonmanl:forknowirGw:Jlllbw., SN18Pa.C,S. §4904 (~1ol.NWll!lfflf11Mification).
Prepared By: James Harvel License No.:
TiUe: gen,or ~uciear ~~al1s! Date: 11!111!6!!
llOO.fM.acW0435 l/2012 SUPPLEMENTAL REPORT DAILY EFFLUENT MONITORING Facility Name: Beaver Valley Power Station Month: 8 1.-.....-1 Year. 2022 Municipality: Counlj: Beaver Permit No.: 'lll&2&115 Outfall: .._...,.,_____
- jelngpor1 BOl'ouifi Watershed
- Renewal app!lca6on due J!il!.yJ prior to expira6on.
Laboratories: +rm. ews Lab Tois permit will expire on: October 31 1 20H Free Avallabkt Flow pH TRC Temperature Total Aluminum Tocal Chromium Total Copper Total Mercury Total Zinc Chlorine Q
Sun 7131122 Mon 811122 0.0 Tue 8/2fZ2 0.0 Wed 8/3122 0.0 Thu 814/22 0.0 Fri 8/5f22 0.0 Sat 816122 0.0 Sun 8/7fl2 0.0 Mon 818122 0.0 Tue 819122 0.0 Wed 811,...."" 0.0 Thu 8111122 Fri 8/12/22 O.o Sat 81131'22 0.0 3 Sun 8114/22 0.0 Mon 8115122 0.0 Tue 8116122 Wed 8/17/22 0.0 Thu 8118122 0.0 Fri 8/19122 Sat 8/20/22 0.0 4 Sun 8121122 0.0 Mon 8/22/22 0.0 Tue 8123'22 0.0 Wed 8/24/22 0.0 Thu 6125122 0.0 Fri 8126/Z? 3.85 7.9 0.02 0.02 86.7 0.24 0.0032 0.0002 Sat 8/27/22 0.0 5 Sun 6128122 0.0 Mon 81291'22 0.0 l----,f-,w-"Tu,,;.'--l--':~c'=' /22="'1--'3""0~
o -+--l---'-'7.-=- 6- -t-- <-1-- - 'o"".0=--+-
2 <-1-- -o"'.02 =-- +---t- ~ 88"'.2' ---t- -t-- ~ o.=22' --.-..f- +-- - ---t- +---'o~1.oo
=: 35' --+--<+--'o"'.0= 002' --+-- 1-- - - -1-- - ~ -+--1-- - - --1-' - - - - -- + -- ----,1---+-- - ---1 1
Thu 9'1122 Fri 912m.
Sat 9'3122 Olly Mi'fflrn (Cone.): *.o < u.u"' < u.u.r: "°* - u..r:.r: u.1 1 <
M~=:~~~ l----t-+ - -'7".9- -t-::;-J- -,,~:>:~<,--t-::;-J- -,,::*:,: --t- + --,':aii*r2- + ---,t---,~cii~i :- --f-- t-- - ---f-- t-- ~a°:iii:..:~5- j---:;:;--j-- i,'~:"-:~~- t--t- - - --j---t------j---t- - - --f---J- - - -,f--f- - - --f--f-- -- l
~~~=t ..--- - + - - ---t- <--t_ _ o._02_ --t_ <-t-__o._02_ 7 _ ,...__e_1 ._s _ -;----i1--o_.2_3_;---1-- - -;--- i-- o_._oo_JA ,_ _,._*-;-- - o._000_ 2_ t--;-- - - - -t- - - --t---t- - - --t---t--- --t-- - -+--1---- --1 MaxA\'gw.,,.,, (Load): ___ o_.ee A\'g MonHy(Load):
_ _,__ +-- ---+-<--+_ _o._e_ --+- <--+- -o-.e- -+_ +-_ _ __,_+-_ ~
o.28 < o.e < o.e e _ _._ -+-
1
- - - --<f---+-- -"'*1 <
o_,.1, -- t- <
o.oos
- :-t---:o:c.ooe=- +--t- - ~ -;-.-ir - - -- t - - - 1 t - - - - - ; - - - - 1 r - - - - - - t - - - t - - - - - t - - - t - - - --1 Tobll MonlNy (Load): 7.7 < 20 < 20 229 ,, < 0.2 o.tyMmun(Load): o < o.e < o.8 7 a.1 < o.oos o.,y Mmrun (loed): 3.15 < o.8 < o.e a o., < *o.oos I Cllftify Wide!' penely ot N ht._ dcxuMnl: WN ....-ed undet my difecdon or auplNiek,n In accordanl::e wilh system designed to-- 1hC ~ pl'SOmel _.,and...,.._. the WClnftllion lbritted. Basad on my
~ d the pr.an or pettON 'M'IO,...,. tie )'lltem or thou pettON chclty r8'P(Jf'lliJle for gthefing lhe lnfonntion , the lnformtian ubmined It, to th bnt d my knoMedge Ind belief, true, ocurM9 nd complete. I l1ffl .,,,..
thI ther9 . . igrwfieant penaliM for aubmitting f.... nfonnation, Including the po,tility olfne and lmprionmer1 forkncMw,g vioition . See 18 Pa. C.S. § ~904 (r.etamg to unswam falification).
Prepared By: JameG Harvey License No.:= = = - - - - - - - - - - - - - - -
Title:
Senior Nuclear Specialist Date: ,..91..30 120
_22
L-22-227 ENCLOSUREC
-:a. eurofins To: Energy Harbor From: Amanda L. Grilli, Quality Assurance Manager, Eurofins Pittsburgh Date: 09/28/2022 Re: Job Number 180-143854 This letter is in reference to the corrective action for job 180-143854 for Energy Harbor received by Eurofins Pittsburgh on 09/01/2022.
Sample 180-143854 was digested in batch 411608 on 09/09/2022 and run on 09/23/2022. The method blank was 37.5 ug/L over the acceptable 30ug/L limit. The samples were redigested on 9/24/2022 and analyzed on 9/26/2022.
A combination of analyst absence, volume of work, and contamination discovered in method blank contributed to delay in analysis. The project manager corresponded with the client informing them of the situation. The original samples would have been reported late, but in time for the DMR deadline.
The analyst backlog was substantial due to previous instrumentation issue. Additional prep and instrumentation analysts are being introduced to decrease backlog of methods. Training was conducted for prep analysts to prioritize samples requiring a second digestion and the importance of sample handling to prevent contamination. Prep analysts will continue to provide routine cleaning around sample digestions to avert contamination.
- t you have any questions, please contact me at 412-963-2447 or Amanda.grilli@eurofinset.com or your Project Manager.
Sincerely, Amanda L. Grilli Quality Assurance Manager Eurofins Pittsburgh