L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation Changes, Tests, and Experiments
ML22299A132
Person / Time
Site: Beaver Valley, 07201043
Issue date: 10/26/2022
From: Grabnar J
Energy Harbor Nuclear Corp
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
L-22-228
Download: ML22299A132 (1)


Text

energy Energy Harbor Nuclear Corp.

harbor Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 John J. Grabnar 724-682-5234 Site Vice President, Beaver Valley Nuclear October 26, 2022 L-22-228 10 CFR 72.48 ATTN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 Unit 1, Docket No. 50-334, License No. DPR-66 Unit 2, Docket No. 50-412, License No. NPF-73 Part 72 Docket No. 72-1043 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments Pursuant to 10 CFR 72.48(d)(2), this letter serves as the Energy Harbor Nuclear Corp.

summary report of the changes, tests, and experiments associated with the Beaver Valley Power Station (BVPS) independent spent fuel storage installation.

Energy Harbor Nuclear Corp. reports that for the BVPS, there were no evaluations completed pursuant to 10 CFR 72.48(d)(2), during the reporting period of October 22, 2020 to October 4, 2022.

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager- Fleet Licensing, at (330) 696-7208.

Sincerely, John J Digitally signed by John J Grabnar Date: 2022.10.26 10:54:29 Grabnar -04'00' John J. Grabnar cc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative