Similar Documents at Byron |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000455/19900211990-11-14014 November 1990 Insp Rept 50-455/90-21 on 900910-11,24-26 & 1107.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Activities Including Review of Program, Procedures,Observation of Work Activities & Data Review IR 05000455/19900221990-11-13013 November 1990 Insp Rept 50-455/90-22 on 901002-1107.One Violation Noted. Major Areas Inspected:Circumstances Re Closed Unit 2 Intermediate Head Safety Injection Throttle valve,2518822A ML20058G3741990-11-0505 November 1990 Page 9 to Insp Repts 50-454/90-16 & 50-455/90-15,erroneously Deleted from Original Rept IR 05000454/19900161990-08-29029 August 1990 Insp Repts 50-454/90-16 & 50-455/90-15 on 900814-17.No Violations Noted.Major Areas Inspected:Emergency Prepardness Exercise,Licensee Action on Previously Identified Items & Status of Onsite Meteorological Monitoring Program IR 05000454/19900171990-08-17017 August 1990 Insp Repts 50-454/90-17 & 50-455/90-16 on 900701-0811.No Violations or Deviations Noted.Major Areas Inspected:Esf Sys,Onsite Event Follow Up,Reactor Startup,Current Matl Condition,Radiological Controls & Security IR 05000454/19900141990-07-16016 July 1990 Safety Insp Rept 50-454/90-14 & 50-455/90-13 on 900513-0630. Major Areas Inspected:Operational Safety,Esf Sys,Onsite Event follow-up,current Matl Condition,Security,Radiological Controls & Self Assessment/Quality Verification IR 05000454/19900151990-06-26026 June 1990 Insp Repts 50-454/90-15 & 50-455/90-14 on 900611-14.No Violations or Deviations Noted.Major Areas Inspected: Radiological Protection Program Including,Changes,Audits & Surveillances,External & Maint Exposure Control IR 05000454/19890161989-08-30030 August 1989 Safety Insp Repts 50-454/89-16 & 50-455/89-18 on 890701-0819.Violations Noted.Major Areas Inspected:Plant Matl Condition,Operational Safety,Mud in Essential Svc Water Sys,Security & Discrepancy Records IR 05000454/19890141989-07-11011 July 1989 Safety Insp Repts 50-454/89-14 & 50-455/89-16 on 890518-0630.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety,Esf Sys Walkdown,Fire Protection,Event Followup & Maint/Surveillance IR 05000454/19890151989-07-0707 July 1989 Insp Repts 50-454/89-15 & 50-455/89-17 on 890612-20.No Violations Noted.Major Areas Inspected:Radiological Protection Program During Power Operation,Including Changes in Organization,Audits & Training & Qualification IR 05000454/19890101989-06-0505 June 1989 Insp Repts 50-454/89-10 & 50-455/89-12 on 890401-0517.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety,Event Followup,Mud Buildup in Essential Svc Water Lines,Security & LERs IR 05000454/19890131989-05-24024 May 1989 Insp Repts 50-454/89-13 & 50-455/89-15 on 890424-28.No Violations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization & Training & Primary & Secondary Sys Water QC Programs IR 05000454/19890081989-04-24024 April 1989 Partially Withheld Physical Security Insp Repts 50-454/89-08 & 50-455/89-11 on 890327-0403 (Ref 10CFR73.21(c)(2)).No Violations Noted.Major Areas Inspected:Mgt Support - Security Program Audits & Protected Alarm Barriers IR 05000454/19890041989-04-19019 April 1989 Insp Repts 50-454/89-04 & 50-455/89-07 on 890217-0331. Violations Noted.Major Areas Inspected:Operational Safety, Event Followup,Maint/Surveillance,Plant Startup from Refueling & Use of under-rated Gaskets in Manways IR 05000454/19890091989-04-12012 April 1989 Insp Repts 50-454/89-09 & 50-455/89-06 on 890227-0316. Violations Noted.Major Areas Inspected:Design Changes & Mods & Dedication of Commercial Grade Equipment for safety-related Applications IR 05000454/19890071989-03-31031 March 1989 Insp Repts 50-454/89-07 & 50-455/89-10 on 890313-17 & 22. Violation Noted.Major Areas Inspected:Implementation of Inservice Testing,Including Administrative & Technical Procedures,Performance of Testing & Retention of Records IR 05000454/19890031989-03-23023 March 1989 Physical Security Insp Repts 50-454/89-03 & 50-455/89-05 on 890201-0303.Major Areas Inspected:Licensee Plans for Coping W/Strikes,Licensee Initial Implementation of Strike Plan & Return to Normal Security Operations IR 05000454/19890021989-03-0202 March 1989 Insp Repts 50-454/89-02 & 50-455/89-02 on 890123-0206.No Violations Noted.Major Areas Inspected:Implementation of Fire Protection Program.Weaknesses Noted in Control of Transient Combustible Matls & Control of Flammable Liquids IR 05000454/19890011989-02-28028 February 1989 Safety Insp Repts 50-454/89-01 & 50-455/89-01 on 890101- 0216.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup & Refueling & Spent Fuel Pit Activities.Util Identified Violation Noted IR 05000455/19890031989-02-27027 February 1989 Insp Rept 50-455/89-03 on 890118,24-26,31 & 0207,09,15 & 16. No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Activities,Including Programs,Procedures, Observation of Work Activities & Data Review IR 05000454/19880171988-10-19019 October 1988 Insp Rept 50-454/88-17 on 880914,20-22,27-29 & 1017.No Violations Noted.Major Areas Inspected:Inservice Insp Activities,Including Review of Program (73051),procedures (73052) & Observation of Work activities(73753) ML20207N8801988-10-12012 October 1988 Insp Rept 50-454/88-19 on 880919-28.Violations Noted: Inadequate Procedures for Installation & Use of Tygon Tubing for RCS Level Indication.Major Areas Inspected:Loss of Train of RHR When Water Level in RCS Lowered on 880919 IR 05000454/19880161988-10-0505 October 1988 Safety Insp Repts 50-454/88-16 & 50-455/88-15 on 880816- 0930.Violations Noted.Major Areas Inspected:Previous Insp Findings,Operations Summary,Training & Refueling & Spent Fuel Pit Activities IR 05000454/19880181988-10-0303 October 1988 Insp Repts 50-454/88-18 & 50-455/88-16 on 880919-22.No Violations Noted.Major Areas Inspected:Action on Previously Identified Items,Emergency Plan Activations & Status of Emergency Preparedness Program.Two Open Items Identified IR 05000454/19880131988-09-13013 September 1988 Team Insp Repts 50-454/88-13 & 50-455/88-13 on 880801-12.No Violations Noted.Major Areas Inspected:Operation Radiation Protection,Radwaste Mgt & Nonradiological Chemistry Programs,Including Health Physics Organization IR 05000454/19880141988-08-29029 August 1988 Safety Insp Rept 50-454/88-14 on 880810-12.No Violations or Deviations Noted.Major Areas Inspected:Facility Mods Associated W/Snubber Reduction,Training & Licensee Action on Previous Insp Findings IR 05000454/19880111988-08-19019 August 1988 Safety Insp Repts 50-454/88-11 & 50-455/88-11 on 880701- 0815.Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Bulletin Followup,Operations Summary,Training,Refueling,Surveillance & Maint IR 05000454/19880101988-07-14014 July 1988 Partially Withheld Insp Repts 50-454/88-10 & 50-455/88-10 on 880623-0701 (Ref 10CFR73.21).No Violation Noted.Major Areas Inspected:Mgt Effectiveness - Security,Security Program Audits,Testing & Maint & Communications IR 05000454/19880091988-07-11011 July 1988 Safety Insp Repts 50-454/88-09 & 50-455/88-09 on 880517- 0630.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Bulletins,Generic Ltrs, Operations Summary,Training & Spent Fuel Storage Racks IR 05000454/19880071988-06-0101 June 1988 Safety Insp Repts 50-454/88-07 & 50-455/88-07 on 880401- 0516.Violations Noted.Major Areas Inspected:Util Action on Previous Insp Findings,Lers,Bulletins,Operations Summary, Engineering & Technical Support & QA Programs IR 05000454/19880081988-05-27027 May 1988 Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items IR 05000454/19880061988-04-11011 April 1988 Safety Insp Repts 50-454/88-06 & 50-455/88-06 on 880212-0331.No Violations Noted.Major Areas Inspected: Licensee Action on Previous Insp Findings,Lers,Bulletins, Generic Ltrs,Operations Summary,Training & Surveillance IR 05000454/19880051988-03-28028 March 1988 Safety Insp Repts 50-454/88-05 & 50-455/88-04 on 880113-0317.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Startup Test Results Evaluation & Startup Test Results Verification IR 05000456/19880061988-03-0909 March 1988 Safety Insp Repts 50-456/88-06 & 50-457/88-08 on 880216-25. No Violations or Deviations Noted.Major Area Inspected: Licensee Implementation of Generic Ltr 83-28 in Areas of Equipment Classification & Vendor Interface IR 05000454/19880031988-02-26026 February 1988 Insp Repts 50-454/88-03 & 50-455/88-03 on 880111-0217. Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Finding,Ser/Technical Evaluation Rept Commitment & Environ Qualification Program Compliance IR 05000454/19880021988-02-24024 February 1988 Safety Insp Repts 50-454/88-02 & 50-455/88-02 on 880101- 0211.Violation Noted.Major Areas Inspected:Previous Insp Findings,Lers,Operations Summary,Training,Surveillance,Maint & Operational Safety,Esf Sys Walkdown & Info Notices ML20147H3091988-01-14014 January 1988 Safety Insp Repts 50-454/87-27 & 50-455/87-25 on 870707-09 & 0820-21.Violations Noted.Major Areas Inspected:Previous Insp Findings,Observation of Maint Surveillance Activities & Training IR 05000454/19870441988-01-0808 January 1988 Insp Repts 50-454/87-44 & 50-455/87-42 on 871208-11.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection Activities During Surveillance Outage,Including Organization & Mgt Control IR 05000454/19870431988-01-0808 January 1988 Insp Repts 50-454/87-43 & 50-455/87-40 on 871201-31.No Violations or Deviations Noted.Major Areas Inspected:Util Actions on Previous Insp Findings,Bulletins,Lers,Operations Summary,Training,Local Leak Rate Testing & Surveillance IR 05000454/19870421987-12-11011 December 1987 Insp Repts 50-454/87-42 & 50-455/87-39 on 871118-20,23 & 24. No Violations or Deviations Noted.Major Areas Inspected:Qa, Confirmatory Measurements for in-plant Radiochemical Analyses & Organizaton & Mgt Control IR 05000454/19870411987-12-0909 December 1987 Insp Repts 50-454/87-41 & 50-455/87-38 on 871031-1130.No Violation or Deviation Noted.Major Areas Inspected:Lers, Generic Ltrs,Operations Summary,Training,Surveillance,Maint, Operational Safety,Allegations & Mgt Changes IR 05000454/19870391987-11-19019 November 1987 Safety Insp Repts 50-454/87-39 & 50-455/87-36 on 871002-30. No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Insp Findings,Operations Summary,Design Changes & Mods,Training & Surveillance IR 05000454/19870401987-11-0202 November 1987 Insp Repts 50-454/87-40 & 50-455/87-34 on 871013-15.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Exercise,Including Key Functions & Locations During Exercise.Related Info Encl IR 05000454/19870381987-10-13013 October 1987 Insp Repts 50-454/87-38 & 50-455/87-35 on 870901-1001. Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Operations Summary,Training, Surveillance,Maint,Operational Safety & Allegations IR 05000454/19870361987-09-23023 September 1987 Insp Repts 50-454/87-36 & 50-455/87-33 on 870831-0904.No Violations or Deviations Noted.Major Areas Inspected: Chemistry Program,Procedures,Organization,Training,Qa,Water Quality Control & Confirmatory Measurements IR 05000454/19870341987-09-21021 September 1987 Insp Repts 50-454/87-34 & 50-455/87-32 on 870824-0904.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection & Transportation Activities,Including Organization & Mgt Control IR 05000454/19870351987-09-14014 September 1987 Partially Withheld Physical Security Insp Repts 50-454/87-35 & 50-455/87-32 on 870817-21 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Review of Records & Repts,Keys & Combinations & Physical Barriers - Vital Areas IR 05000454/19870331987-09-10010 September 1987 Safety Insp Repts 50-454/87-33 & 50-455/87-31 on 870801-31. No Violations or Deviations Noted.Major Areas Inspected: Operations Summary,Training,Surveillance,Maint,Operational Safety & ESF Walkdown,Headquarters Request & Event Followup ML20234D2531987-09-10010 September 1987 Insp Repts 50-454/87-32,50-455/87-30 & 50-456/87-28 on 870810-17.No Violations Noted.Major Areas Inspected: Emergency Operation Procedures IR 05000454/19870301987-08-31031 August 1987 Special Fitness for Duty Program Insp Repts 50-454/87-30 & 50-455/87-28 on 870713-17.Major Areas Inspected:Policies, Procedures & Practices of Fitness Duty Program & Employee Assistance Program 1990-08-29
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP PNO-III-99-041, on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found1999-09-0303 September 1999 PNO-III-99-041:on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers ML20199H8811999-01-19019 January 1999 Notice of Violation from Insp on 981124-990104.Violation Noted:From 871029 to 981123,test Controls for Stroke Time Testing of AFW Pump Discharge Valves Were Not Properly Established IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19983011998-11-0303 November 1998 NRC Operator Licensing Exam Repts 50-454/98-301(OL) & 50-455/98-301(OL) for Tests Administered on 980914-22.Out of Five License Applicants,One SRO Passed All Portions of Exam. Two RO & Two SRO Applicants Failed Portions of Exam IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20153D7701998-09-18018 September 1998 Notice of Violation from Insp on 980714-0824.Violation Noted:During 980616-18,AP 1100-3,Rev 11,inappropriate to Circumstances,In That Procedural Guidance Led to Belief That Main CR Ventilation Envelope Altered When CR Doors Opened ML20236W2081998-07-31031 July 1998 Notice of Violation from Insp on 980531-0713.Violation Noted:As of 980713,SF Storage Pool Design Would Not Have Prevented Inadvertent Draining Below 423 Feet 2 Inches IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0291998-06-29029 June 1998 Notice of Violation from Insp on 980407-0530.Violation Noted:On 980502,OOS 970012670 Not Sufficient to Isolate Equipment Being Worked on ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20248C0441998-05-28028 May 1998 Notice of Violation from Insp on 980403-27 & 0506.Violations Noted:Radiologically Posted Area Established for sodium-24 Used in Moisture Carryover Test Was Not Posted W/Sign Bearing Radiation Symbol & Listed Words IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20248B0931998-05-26026 May 1998 Notice of Violation from Insp on 980415-0508.Violation Noted:Ffd Program Was Not Appropriately Implemented ML20248C7271998-05-21021 May 1998 Errata to Notice of Violation from Insp on 980113-0223 W/Combined Violations ML20217Q9671998-05-0505 May 1998 Notice of Violation from Insp on 980224-0406.Violations Noted:Unit 1 Changed Operational Mode from Mode 5 to Mode 4 When Conditions for LCO of TS 3.4.6.1.b Were Not Met & Associated Action Required Shutdown within Specified Time ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8421998-03-27027 March 1998 Notice of Violation from Insp on 980120-0210.Violation Noted:On 960607,team Identified That Field Change Request (Fcr) 960062 Was Not Subjected to Design Control Measures Commensurate W/Measures Applied to Original Design ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance ML20217E5261998-03-26026 March 1998 Notice of Violation from Insp on 970919-980226.Violations Noted:Licensee Contracted Level II Liquid Penetrant Exam Examiner Incorrectly Performed Liquid Penetrant Exam of SG IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs ML20217D1031998-03-20020 March 1998 Notice of Violation from Insp on 980302-06.Violation Noted: on 980306,chemistry Technician Failed to Close Valve V8 Before Withdrawing 2 Gas Samples from Panel for Hydrogen & Isotopic Analyses ML20248L8161998-03-16016 March 1998 Notice of Violation from Insp on 980113-0223.Violations Noted:On 980117,plant Administrative Procedure 330-1,section c.b.c.4,not Implemented & on 970910,licensee Operated Gwps Differently from Ufsar,Section 11.3.2.1 IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program 1999-09-08
[Table view] |
Inspection Report - Byron - 1986002 |
---|
|
|
Text
._ _ - - _
.
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Report N /86002(DRP)
Docket N License N NPF-37 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: Byron Station, Unit 1 Inspection at: Byron Station, Byron, IL Inspection Conducted: January 1 - 31, 1986 Inspectors: J. M. Hinds, Jr.
, P. G. Brochman J.,A.,Malloy Approved By: G &c L. forney, w Lbifef% W Wrs
--- .------
Reactor Projects Secti Date Inspection Summary
!
l Inspection on January 1 - 31, 1986 (Report No. 50-454/86002(DRP))
l Areas Inspected: Routine, unannounced safety inspection by the resident inspectors of 10 CFR Part 21 reports; operations summary; LERs; design changes and modifications; surveillance; maintenance; operational safety; event l followup and other activities. The inspection consisted of 141 inspector-hours onsite by 3 NRC inspectors including 24 inspector-hours during off-shift Results: Of the eight areas inspected, no violations or deviations were identified in seven areas; four violations were identified in the remaining area: (failure to perform surveillances within their required time interval -
Paragraph 4.b; failure to follow procedures and to effectively implement an independent verification program - Paragraph 4.c; failure to take timely and effective corrective actions for an significant condition which was adverse to safety - Paragraph 4.d; failure to perform a surveillance prior to returning a component to service following maintenance - Paragraph 4.e). Violations 1 and 4 were of minor safety significance, when the surveillances were performed the components were verified to be operable; therefore, the public health and l
safety were not affected. Violations 2 and 3 were of more than minor safety i
significance with the potential to affect the public health and safety.
l
B602250315 860220 PDR ADOCK 05000454 0 PDR
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
.
DETAILS 1. Persons Contacted Commonwealth Edison Company
- R. Querio, Station Manager
- R. Pleniewicz, Production Superintendent
- R. Ward, Services Superintendent
- L. Sues, Assistant Superintendent Operations
- T. Joyce, Assistant Superintendent Technical Services
- F. Hornbeak, Technical Staff Supervisor
- A. Chernick, Compliance Supervisor
- Flahive, Assistant Technical Staff Supervisor
- Yates, Onsite Nuclear Safety
- Britton, Quality Assurance Inspector
- J. Langan, Compliance Staff R. Steder, Technical Staff J. Ventimiglia, Technical Staff D. Prisby, Technical Staff The inspector also contacted and interviewed other licensee and contractor personnel during the course of this inspectio * Denotes those present during the exit interview on January 31, 198 . 10 CFR Part 21 Report Followup (92716)
(Closed) 10 CFR 21 Report (454/85003-PP): Diesel Generator tachometer erroneous readings. On September 6, 1995, the licensee identified a problem with the Cooper-Bessecer Emergency Diesel Generators (DGs). This problem involved spurious noise in the speed sensing tachometer which caused an RPM reading to be produced when the engine was secured. At greater than 280 RPM, the starting air solenoid valves become de-energized and due to design of the starting circuit the valves would not energize and open on a starting signal. Consequently, had a valid signal requiring the DGs to start occurred, the DGs could have failed to star The licensee initially ioa tified the problem as coming from a DC to DC regulator in the tachometer circuit; the regulator was replaced and the noise was no longer present. Subsequent investigation by licensee corporate and station personnel determined that a DC to DC converter should be installed to provide better signal isolation. Modification M6-1-85-0638 was issued to accomplish this work and wa:; completed by December 12, 1985. The inspector reviewed the modification package and verified that the DC to DC convertors had been installed. Since the installation of the converters no additional spurious tachometer signals have occurre . Summary of Operations The unit operated at power levels up to 98% until 1103 on January 13, 1986 when a manual turbine runback to 55% power occurred following the trip of the 18 Circulating Water (CW) Pump (see Paragraph 9.b). The CW
_ .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
pump was restarted and the unit returned to 98% power the same day. At 0449 on January 16, 1986, the reactor tripped when reactor trip breaker A was inadvertently opened during a surveillance (see Paragraph 9.c). The unit was taken critical at 1549 and tied to grid at 1845 on the same da During power escalation problems with the main condenser were identified and the unit was taken off the grid and placed in Mode 2. During the restart an additional problem was identified with the 1A Main Steam Isolation Valves (MSIV). The MSIV was repaired and the unit was tied to the grid at 1839 on January 18, 1986, and returned to 98% power. At 0006 on January 29, 1986 the reactor tripped on Low-Low Steam Generator water level when the 1A MSIV went shut inadvertently (see Paragraph 9.d).
Following repairs the unit was taken critical at 2147 on the same day and tied to the grid at 0142 on January 30, 1986, and returned to 98% powe . Licensee Event Report (LER) Followup (90712 & 92700) (Closed) LERs (454/85007-02-LL; 454/85080-01-LL; 454/85098-LL; 454/85099-LL; 454/85100-LL): An in-office review was conducted for the following LERs to determine that the reportability requirements were fulfilled, immediate corrective action was accomplished and corrective action to prevent recurrence had been accomplished in accordance with Technical Specification LER N Title 454/85007-02 Control Room Ventilation Isolation Due to a Voltage Transient Induced by a Circulating Water Pump Start 454/85080-01 Incorrect Calorimetric Calculation Resulting in Exceeding 100% RTP 454/85098 Actuation of the Main Control Room Ventilation System Due to De-Energization of the Associated Radiation Monitors 454/85099 Actuation of the Main Control Room Ventilation System Due to the Spiking of the Iodine Channel of the OPR31J Rad Monitor 454/85100 Construction Equipment Blocking Fire Door in Open Position No violations or deviations were identified, (Closed) LER (454/85096-LL): This LER described events from January 10 - December 7, 1905, while in Modes 1, 2, or 3. These events involved the failure to perform Technical Specification l Surveillances on Post Accident Monitoring (PAM) Containment Pressure 1 Channel ;
3 l
I
_
.
.
Personnel at the Braidwood Nuclear Power Station were conducting a review of procedures, as the licensee intended to use the same procedures at the Byron and Braidwood station. These personnel identified an error in Byron Operating Surveillance, IBOS 3.3.6-1,
" Accident Monitoring Instrumentation Monthly Surveillance", in that the procedure checked the Containment Spray pressure channels 934, 935, 936, and 937 instead of PAM containment pressure channels PC004 and PC00 Technical Specification 4.0.2 states, in part: "Each Surveillance Requirement shall be performed within the specified time interval with a maximum allowable extension not to exceed 25% of the surveillance interval..." Technical Specification 4.3.3.6 states:
"Each accident monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3-7." Table 4.3-7, Instrument 1, " Containment Pressure" requires that a CHANNEL CHECK be performed at least once every month and that a CHANNEL CALIBRATION be performed at least once every 18 month Byron Operating Surveillance 180S 3.3.6-1, " Accident Monitoring Instrumentation Monthly Surveillance" performs a CHANNEL CHECK on the Containment Pressure Post-Accident Monitoring Instrumentation channel; however, the B0S was performed on Containment Spray Containment Pressure channels 934, 935, 936, and 937, instead of {
channels PC004 and PC005. Consequently, from January to November J 1985 channels PC004 and PC005 did not have a CHANNEL CHECK performed on them and were therefore considered inoperable. The failure to perform a monthly CHANNEL CHECK on PC004 and PC005 within the required time interval is a violation of Technical Specification 4.3.3.6 (454/86002-01a(DRP)).
l A CHANNEL CALIBRATION was performed on PC004 and PC005 on August 22 and 23, 1983; however, these channels were not recognized as being Technical Specification related and were placed on a 48 month {
calibration schedule. On July 7 and 8, 1985 the 18 month time intervals plus 25% extension were exceeded for PC004 and PC005, respectively. The failure to perform an 18 month CHANNEL CALIBRATION on PC004 and PC005 within the required time interval is a violation of Technical Specification 4.3.3.6 (454/86002-01b(DRP)).
The required calibration wss subsequently performed on December 9, 198 Technical Specificaticn 4.0.3 states, in part: " Failure to perform a Surveillance Requirement within the specified time interval shall constitute a failure to meet the OPERABILITY requirements for a Limiting Condition for Operation...." Technical Specification 3. and Table 3.3-10 require a minimum of one Containment Pressure channel to be OPERABLE, while in Modes 1, 2, 3, and 4. Technical Specification 3.3.3.6.b states, in part: "With the number of OPERABLE accident monitoring instrumentation channels...less than the Minimum Channels OPERABLE requirements of Table 3.3-10, restore theinoperablechannel(s)toOPERABLEstatuswithin48hnurs; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />." With both channels PC004 and PC005 inoperable for greater than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> the licensee
__ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . ___
,
_ ~-. _- .. . . _ ~._..__ _ _ __ ,. -
p
-.
! .
<.
failed to place the unit in at'least HOT STANDBY within the next 6-3- hours and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The failure *
' to take these actions within the-required time is a violation of y Technical Specification 3.3.3.6(454/86002-01c(DRP)). 4
,
[
.
As corrective action the licensee has written a new procedure 1 BIS 3.3.6-214, " Surveillance Calibration of Containment Pressure Loops"
,
to perform the 18 month CHANNEL CALIBRATION and is preparing a
, revision to 1805 3.3.6-1 to specify channels PC004 and PC005 for
- containment pressure. This revision is being tracked by Action Item
! Record AIR 6-85-414. Based on these corrective actions the
! inspector has no further concerns regarding this matter and this j item is considered clcsed; consequently, no reply is required.
j i (Closed)LER(454/85097-LL): This LER described an event on 1985, while in Mode 5. This event involved an
] December inadvertent 12, Safety Injection (SI) actuation occurrenc At 0220 a licensed operator was performing Byron Operating I Surveillance 180S 3.1.1-20, " Train A Solid State Protection System (SSPS) Bi-Monthly Surveillance". Paragraph F.45 states: "At the
logic test panel, PLACE the INPUT ~ ERROR INHIBIT switch to the-I INHIBIT position.", and requires " INDEPENDENT VERIFICATION" of this
} step. Instead, the operator placed the MULTIPLEXER TEST switch in
'
the INHIBIT position and when Paragraph F.46 was performed next, a SI occurred. The MULTIPLEXER TEST switch is located' adjacent to the~ i IhPUT ERROR INHIBIT switch on the logic test panel of SSPS. The SSPS
.
i i memory circuits must be reset by activating the blocking switches at
the main control board prior to placing both the INPUT ERROR INHIBIT j and the MODE SELECTOR switches in the OPERATE position. Since this '
j was not done the valid Low Steamline Pressure and Low Pressurizer '
i Pressure SI signals were not blocked and a SI actuation occurre An independent verification of the position of the INPUT ERROR
}
i INHIBIT switch was not performed prior to the performance of Paragraph F.46. 10 CFR 50, Appendix B, Criterion V states, in part: " Activities i
,
affecting quality shall be prescribed by documented instructions, l
procedures, or drawings, of a type appropriate to the circumstances ;
i and shall be accomplished in accordance with these instructions, j
procedures, or drawings...." The failure to place the INPUT ERROR 4 INHIBIT switch in the INHIBIT position as required by Paragraph F.45 is a violation of 10 CFR 50, Appendix B, Criterion V (454/86002-02a(DRP)).
.
Byron Administrative Procedure BAP 100-13. " Guidelines for Performance of Independent Verification of Proper Equipment
.
i Alignment", Paragraph C.1 states, in part: "All Components tha i
,
"
provide a safety function should be independently verified when alignment changes have been made."' BAP 100-13 Paragraph states: " Independent verification may also be satisfied by a visua i
'
verification, apart in time, and documentation of equipment alignment by a second qualified person." The operator performing }
- the independent verification in the surveillance would verify the i switch positions for several steps at once, rather than after each ,
!
step which required independent verification. This was done to meet '
i
[
i
_ _ _ _ _ _ _
.
.
the operator's understanding of the " apart in time" requirement of BAP 100-1 Other departments at Byron, such as the Instrument Maintenance department, did not subscribe to this understanding, but would perform an independent verification after each step in which it was required. The failure of licensee management to ensure that the Independent Verification program was effectively implemented during the performance of 180S 3.1.1-20 is a violation of 10 CFR 50, Appendix B, Criterion V (454/86002-02b(DRP)). The safety significance of this event is of more than minor significance due to management involvement and the potential for this event to have occurred in Modes 1, 2, and d. (Closed) LER (454/85101-LL): This LER described an event on December 27, 1985, while in Mode 1. This event involves a Reactor Trip due to an incorrectly positioned control switch in the IB Steam Generator Feedwater Regulating Valve (FRV) control circui CFR 50, Appendix B, Criterion XVI states, in part: " Measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected. In the case of significant conditions adverse to quality, the measures shall assure that the cause of the condition is determined and corrcctive action taken to preclude repetition..."
ANSI N18.7-1976/ANS-3.2, Section 5.2.11 states: "
...In the case of significant conditions adverse to safety, the measures shall assure that the cause of the condition is determined and corrective action taken..." '
At 1230 on December 27, 1985 an instrument mechanic (IM) was performing maintenance on Steam Flow Channel 522 for the IB Steam Generator (SG). The control circuit for the 1B SG Feedwater Regulating Valve (FRV) has three inputs of two channels e'ach: steam flow, feedwater flow, and SG level. The control switch for feed flow was selected to channel 520. The licensed operator who gave permission to the IM to work on channel 522 verified that channel 522 was not selected to control the FRV, as this was the only work to be done on the FRV control circuit. However, Byron Instrument Surveillance 1 BIS 3.2.1-200, " Surveillance Calibration of the Steam Generator Steam Flow / Feed Flow Mismatch Protection Set I" which performs the calibratior, of channel 522, directs the IM to place channels 520 and 522 and 524 (SG level) in test. When this was done the FRV control circuit perceived a large mismatch between steam flow and feedwater flow ar.d caused the FRV to go full open. Even though the operator took manual control of the FRV, SG level rose to the High-High icvel trip setpoint and a turbine trip and subsequent reactor trip occurred. On June 26, 1985 an identical event occurred, except that the operator was able to take manual control in time to prevent the reactor trip. This event was described in Deviation Report DVR 6-1-85-194. The corrective actions taken in response to this DVR was to affix a cover sheet to surveillance packages to specify the correct switch position; however, this was not done for maintenance packages, even though they used the same BI The failure of licensee management to take timely and effective corrective action for a significant condition which was
. _ __ _
.
,
/
.
adverse to safety is,a violation of 10 CFR 50, Appendix B, Criterion XVI and ANSI N18.7-1976/ANS-3.2, Section 5.2.11 (454/86002-03(DRP)).
e. (Closed) LER (454/85102-LL): This LER described an event during the period of December 1Y to 31, 1985, while in Modes 1, 2, 3 and This event involves the failure to perform a stroke time test on containment isolation valve 1FW039D, "1D Feedwater Preheater Bypass Valve" prior to its return to service following maintenance. This event was identified by the licensee on December 31, 1985, when the System Engineer was reviewing the work package for 1FWO39D prior to performing a stroke time test on the valve. The valve was then satisfactorily tested on Cecember 31, 198 Technical Specification 4.6.3.1 requires that containment isolation valve 1FWO39D shall be demonstrated OPERABLE prior to returning the valve to service after maintenance work is performed on the valve by performance'of a cycling test and verification of isolation tim The failure to perform an isolation time surveillance on 1FWO390 prior to returning it to service is a violation of Technical Specification 4.6.3.1(454/86002-04a(DRP)).
Technical Specification 3.6.3 requires that with containment isolation valve 1FWO39D not OPERABLE action be taken within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to restore the valve to OPERABLE status or secure the valve in the isolation position; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SilVTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
4 With the containment isolation valve 1FWO39D inoperable for greater than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, the failure to place the unit in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />
'
is a violation of Technical Specification 3. (454/86002-04b(DRP)).
The licensee's investigation identified a deficiency in the outage out of service program. During an outage from October 25 to December 13, 1985, the entire feedwater system was taken out of i
service under a " blanket" out of' service, i.e. every component in the system was declared out of service. With the whole system out of service, work could be done freely without additional out of services being processed. During the outage only work on the c$mputerized outage list was to be performed under the blanket out of service. The computerized system was to track work to be performed and testing required prior to unit start-up. This valve, 1FWO390, was not on the outage list. There was no program in place to explicitly track Technical Specification / Mode change required work if it did not appear on the outage list but was under the blanket out of servic The licensee's corrective actions-included revising the computerized outage tracking program to include all work performed during an outage. Additionally, Byron Administration Procedure BAP 300-18,
! " Removing and Returning Equipment Out of Service" will be revised to
'
ensure that no work can be performed on a piece of safety related equipment unless it has been specifically taken out of servic This revision is.being tracked by Action Item Reccrd AIR 6-86-00 t
> - ,
. . .
.
.
5. Design Changes and Modifications Review (37700)
The inspector evaluated the below listed Design Changes / Modifications to verify that they had been reviewed and approved in accordance with Technical Specification and Quality Assurance requirement Incluhd in this evaluation were: 1) a review of post-modification test records, results evaluation, deviations and deviation resolution; 2) a verification that operating and surveillance procedure changes required by the design change / modification were made and approved in accordance with Technical Specifications; 3) a verification that training programs were revised to reflect the design change / modification; 4) a verification that as-built drawings were revised and that control room drawings were updated prior to system startup; and 5) a review of the 10 CFR 50.59(b)
annual report to the NRC to verify that it listed those design changes /
modifications which had been performed without prior NRC approva Modification M6-1-84-113 M6-1-84-181 M6-1-84-185 M6-1-85-106 The inspector reviewed the outstanding safety-related Facility Change Requests (FCR) to determine that an excessive backlog of FCRs did not exis The inspector reviewed the licensee's program for temporary modifications, lifted leads and jumpers to verify that: 1) tempcary modifications were reviewed and approved in accordance with Technical Specifications and 10 CFR 50.59; 2) formal records maintained the status of temporary modifications, lifted leads, jumpers and temporary trip setpoints; 3) independent verification and functional testing following the installation or removal of temporary modifications was accomplished; and 4) periodic reviews of the lifted lead and jumper log were conducte No violations or deviations were identifie . Monthly Surveillance Observation (61726)
The inspector observed Technical Specifications required surveillance testing on the Axial Flux Deviation and verified that testing was performed in accordance with adequate procedures, that test instrumentation was calibrated, that . limiting conditions for operation were met, that removal and restoration of the affected components were accomplished, that test results conformed with Technical Specifications and procedure requirements and were reviewed by personnel other than the individual directing the test, and that any deficiencies identified during the testing were properly reviewed and resolved by appropriate management personne .
.
The inspector also witnessed portions of the following test activities:
SPP 86-06 Split Feed Flow No violations or deviations were identifie . Monthly Maintenance Observation (62703)
Station maintenance activities of safety related systems and components listed below were observed / reviewed to ascertain that they were conducted in accordance with approved procedures, regulatory guides and industry codes or standards and in conformance with Technical Specification The following items were considered during this review: the limiting conditions for operation were met while components or systems were removed from service; approvals were obtained prior to initiating the work; activities were accomplished using approved procedures and were inspected as applicable; functional testing and/or calibrations were performed prior to returning components or systems to service; quality
, control records were maintained; activities were accomplished by qualified personnel; parts and materials used were properly certified; radiological controls were implemented; and fire prevention controls were
! implemented. Work requests were reviewed.to determine status of outstanding jobs and to assure that priority is assigned to safety related equipment maintenance which may affect system performanc The following maintenance activiti- .<ere observed / reviewed:
SI Accumulator Hi/ Low Level Alarm 1MS001A Main Steam Isolation Valve Repair Following completion of maintenance on the SI Accumulator Alarm and 1MS001A the inspectors verified that these systems had been returned to service properly.
,
No violations or deviations were identifie . Operational Safety Verification (71707)
The inspectors observed control room operation, reviewed applicable logs and conducted discussions with control room operators during the month o January. During these discussions and observations, the inspectors ascertained that the operators were alert, cognizant of plant conditions, attentive to changes in those conditions, and took prompt action when appropriate. The inspectors verified the operability of selected ,
emergency systems, reviewed tagout records and verified proper return to service of affected components. Tours of the auxiliary, turbine and rad-waste buildings were conducted to observe plant equipment conditions, including potential fire hazards, fluid leaks.and excessive vibration and to verify that maintenance requests had been initiated for equipment in need of maintenanc .
.
The inspectors by observation and direct interviews verified that the physical security plan was being implemented in accordance with the station security pla The inspectors observed plant housekeeping / cleanliness conditions and verified implementation of radiation protection controls. During the month of January, the inspectors walked down the accessible portions of the Containment Spray and Combustible Gas Control systems to verify operability. The inspectors also witnessed portions of the radioactive waste system controls associated with radwaste shipments and barrelin These reviews and observations were conducted to verify that facility operations were in accordance with the requirements established under Technical Specifications, 10 CFR and administrative procedure No violations or deviations were identifie . Onsite Followup of Events at Operating Reactors (93702) General The inspector performed onsite followup activities for events which occurred during January 1986. This followup included reviews of operating logs, procedures, Deviation Reports, Licensee Event Reports (where available) and interviews with licensee personne For each event, the inspector developed a chronology, reviewed the functioning of safety systems required by plant conditions, reviewed licensee actions to verify consistency with procedures, license conditions and the nature of the event. Additionally the inspector verified that licensee investigation had identified root causes of equipment malfunctions and/or personnel error and had taken appropriate corrective actions prior to plant restart. Details of the events and licensee corrective actions developed through inspector followup are provided in Paragraphs b through e belo Manual Turbine Runback on January 13, 1986 -
While in Mode 1, with reactor power at 96% a manual turbine runback to 55% power was initiated when the 1B Circulating Water (CW) pump tripped. The 1B CW pump tripped on loss of excitation to its synchronous motor. The excitation was lost when the supply feeder breaker to motor control center MCC 134U1 opened on a fault. A temporary modification was powered from a breaker at MCC 134U1; however, when the modification was installed the insulation on one of the cables was damaged, resulting in a phase-to-ground faul This fault was not identified prior to energizing the circuit and when the circuit was energized the MCC circuit breaker and the MCC feeder breaker both opened. The licensee is still investigating this and the deviation investigation report will be reviewed when it is issue l Reactor Trip on January 16, 1985 ;
While in Mode 1 with Reactor Power at 98%, the reactor tripped when l the A Reactor Trip Breaker was inadvertently opened during the - 1 performance of Byron Operating Surveillance 1BOS 3.1.1-11, j
.
.
"Bi-Monthly, Staggered Basis, Reactor Trip Breaker Short and Independence Test - Train B". At 0449 a Temporary Undervoltage Procedure thange Trip (85-1-925) to 180S 3.1.1-11 was being perforned for the first time. When paragraph F.10 of the procedure was performed the Train A Test push button was depressed instead of Train B push button which caused the A Reactor Trip breaker to open. Reactor Trip Bypass Breaker A was open at this time consequently a reactor trip occurred. The test push buttons are located in two different cabinets at switchgear 1RD05E; however, this was not indicated in the Temporary Change; additionally, the test buttons were not labeled to indicate that one was Train A and the other was Train B.
"
The inadequate procedure and inadequate labeling of plant test equipment were the causes of this reactor trip. All systems responded normally during the reactor trip. As corrective action the licensee has revised the procedure to indicate in which cabinet of 1RD05E Train A and Train B are located and has installed labels on switchgear 1RD05E indicating which test button is Train A and which is Train b. During the restart banging noises were heard in the main condenser at approximately 35% power and the unit was shutdown to Mode 2 to inspect the main condenser. No problems or damage could be identified. The Main Steam Isolation Valves (MSIVs)
were shut to provide isolation for the condenser inspection; when the operators attempted to open the 1A MSIV it failed to do so. The valve was repaired and when functionally tested failed to close within the required time interval; consequently, the valve was declared inoperable. Additional repairs were performed and the valve tested satisfactorily. The unit was returned to service on January 18, 1985. This event will be reviewed in a subsequent report when the LER is issue Reactor Trip on Low-Low Steam Generator (SG) Level on January 29, 1986 While in Mode 1, with reactor power at 98%, the reactor tripped on Low-Low Level in the 1A SG when the 1A MSIV inadvertently closed. A ground was present on the negative side of a standby test closure relay, which is powered frcm 125 VDC Bus 112. This relay is used to perform a fast closure surveillance test, approximately two seconds to close, on the MSIVs. At 0006 the trip coil for ventilation fan OVA 03CE shorted out, and caused a positive ground on Bus 112. As a result of the positive and negative grounds on Bus 112 a current path was producca in the test relay causing it to energize. When the MSIV closed rapidly SG level shrank to the Low-Low Reactor Trip setpoint. The licensee replaced the test relay and the unit was returned to service on January 30, 1986. This event will be reviewed in a subsequent report when the LER is issue No violations or deviations were identifie r:. a
i
. . \
..
I 1 Exit Interview (30703)
The. inspectors met with' licensee representatives denoted in Paragraph 1 at the conclusion of the inspection on January 31, 1986. The inspectors summarized the purpose and scope.of the inspection and the findings. The inspectors also discussed the likely informational content of the inspection report with regard to documents or processes reviewed by the inspectors during the inspection.- The licensee did not identify any such .