o U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-454/86022(DRSS)
Docket No. 50-454 License No. NPF-37
_
Licensee:
Commonwealth Edison Company Post Office box 767 Chicago, Illinois 60690 Facility Name:
Byron Nuclear Power Station, Unit 1 Inspection At:
Byron Nuclear Power Station, Byron, Illinois Inspection Conducted:
June 19 - 26, 1986 Date of Last Physical Security Inspection:
April 7 - 9, 1986 Type of Inspection:
Unannounced, Special Physical Security Inspection h-1 - M T
Inspector:
J. L. Belang akn Physical Security Inspector Date Approved By:
d C'hief
Safeguards Section Date
Inspection Summary Inspection on June 19 - 26, 1986 (Report No. 50-454/86022(DRSS))
Areas Inspected:
Included a review of allegations received by the NRC Resident Inspector Office at the Byron Station of perceived security violation cover-up.
The inspection began during the day shift and some off-shift inspection activities were performed.
Results: The licensee was found to be in compliance with NRC requirements within the areas examined during this inspection.
The allegations were not substantiated.
Enclosure contains 123 e60722 sgg72$ Dock 0500$$f Upon separation this a