IR 05000454/1986022

From kanterella
Jump to navigation Jump to search
Partially Withheld Safeguards Insp Rept 50-454/86-22 on 860619-22 (Ref 10CFR73.21).No Noncompliance Noted.Major Areas Inspected:Review of Allegations,Including Security Violation cover-up
ML20212A143
Person / Time
Site: Byron Constellation icon.png
Issue date: 07/22/1986
From: Belanger J, Creed J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20212A122 List:
References
50-454-86-22, NUDOCS 8607280123
Download: ML20212A143 (1)


Text

. o U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-454/86022(DRSS)

Docket No. 50-454 License No. NPF-37 _

Licensee: Commonwealth Edison Company Post Office box 767 Chicago, Illinois 60690 Facility Name: Byron Nuclear Power Station, Unit 1 Inspection At: Byron Nuclear Power Station, Byron, Illinois Inspection Conducted: June 19 - 26, 1986 Date of Last Physical Security Inspection: April 7 - 9, 1986 Type of Inspection: Unannounced, Special Physical Security Inspection Inspector:

h-1 - M J. L. Belang T

akn Physical Security Inspector Date

  1. #

Approved By: d C'hief Safeguards Section Date

Inspection Summary Inspection on June 19 - 26, 1986 (Report No. 50-454/86022(DRSS))

Areas Inspected: Included a review of allegations received by the NRC Resident Inspector Office at the Byron Station of perceived security violation cover-u The inspection began during the day shift and some off-shift inspection  ;

activities were performe Results: The licensee was found to be in compliance with NRC requirements l within the areas examined during this inspection. The allegations were not substantiate l

!

Enclosure contains 123 e60722 sgg72$ Dock 0500$$f Upon separation this a page is Decontrolled

_ . _ _ ._ - - . _, _. _