Forwards Notice of Violation Inadvertently Omitted from Forwarding Insp Rept 50-454/86-10
ML20197J507
Person / Time
Site: Byron Constellation icon.png
Issue date: 05/14/1986
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8605200060
Download: ML20197J507 (1)


Text

r~

.

km6

.~

d'

MAY 141986 Docket No. 50-454 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

Enclosed is a copy of the Notice of Violation inadvertently omitted from our letter of April 18, 1786, which forwarded Inspection Report N /454-86010 (DRP).

"Orlsipi cle:cd I;7 0. F. ilarnick" R. F. Warnick, Chief Reactor Projects Branch 1 Enclosure: Notice of Violation cc w/ enclosure:

D. L. Farrar, Director of Nuclear Licensing V. I. Schlosser, Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Byron Resident Inspector, RIII Braidwood Phyllis Dunton, Attorney General's Office, Environmental Control Division D. W. Cassel, Jr., Es Diane Chavez, DAARE/ SAFE Steve Lewis, ELD L. Olshan, NRR LPM H. S. Taylor, Quality Assurance Division

%52 y$

G ]

! II u RIII rnef/ d Wa n 05//3/86 05//#/86 k

g4-A '

}[ ,

NOTICE OF VIOLATION

,

-

Commonwealth Edison Company Docket No. 50-454

,

..

'

As a result of the inspection conducted on March 1-31, 1986, and in accordance with the " General Policy and Procedures for NRCrEnforcement Actions," 10 CFR Part 2, Appendix C (1985),' the following violation was identified:

Technical Specification 3.3.3.9 requires that the Station Blowdown Line Radioactive Liquid Effluent Monitor (0RE-PR010) be operable at all times or else follow Action Statement 32 of Table 3.3-1 Actior.-Statement 32 of Table 3.3-12 requires that, with ORE-PR010 inoperable, effluent releases may continue provided grab samples are obtained from the Circulating Water (CW) line and analyzed at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Effluent releases witn monitoring of CW blowdown via grab samples may continue for up to 30 day Contrary to the above, from 1508 on January 29, 1986 to 0715 on January 30, 1986, CW blowdown was in progress for more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, with ORE-PR010 inoperable and without a grab sample being taken and analyzed. A grab sample was taken 6nd analyzed after approximately 13.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> of CW blowdow Th'is is a Severity Level V violation (Supplement I). (454/86010-03(DRP))

The inspection showed,that Ntion had been taken to correct the identified violation and to prevent recurrence. Consequently, no reply to the violation

< is required and we huve no further questions regarding this matte .

lAPR 181986 Dated jpp/2)M

, R. F. Warnick, Chief

,