IR 05000400-12-201, on 02/17/2012, Shearon Harris Nuclear Power Plant - NRC Security Inspection
ML12067A082
Person / Time
Site: Harris Duke energy icon.png
Issue date: 04/03/2012
From: Rachel Johnson
NRC/NSIR/DSO/DDSO/SPEB
To: Burton C
Carolina Power & Light Co
References
IR-12-201
Download: ML12067A082 (2)


Text

ril 3, 2012

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NRC SECURITY INSPECTION 05000400/2012201

Dear Mr. Burton:

On February 17, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Shearon Harris Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 23, 2012, with you and members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Two NRC identified findings of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) were identified during this inspection.

The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the area. Both of these findings were determined to involve a violation of NRC requirements.

The findings had cross-cutting aspects of Human Performance (H.1(b)) for failing to use conservative assumptions in decision making; and in Problem Identification and Resolution (P.1(a)) for failing to implement a corrective action program with a low threshold for identifying issues.

If you contest any non-cited violation in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Director, Office of Nuclear Security and Incident Response (NSIR); Director, Office of Enforcement, and the Branch Chief, Security Performance Evaluation Branch, NSIR.

Enclosure contains Safeguards Information. Upon separation, this letter is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Otherwise, if security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 50-400 License No. NPF-63 Nonpublic Enclosure: Inspection Report 05000400/2012201 w/ Attachments: Supplemental Information cc w/encl: T. Slake, Shearon Harris Nuclear Power Plant cc w/o encl: J. Scarola, Progress Energy, Inc.