Site: Harris 
Issue date: 09/11/2006
From: Casto C
Division Reactor Projects II
To: Gannon C
Carolina Power & Light Co
References
EA-06-216, IR-06-003
Download: ML062550315 (6)


Text

September 11, 2006

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NRC INTEGRATED INSPECTION REPORT 05000400/2006003; PRELIMINARY WHITE FINDING

Dear Mr. Gannon:

On June 30, 2006, the NRC completed an inspection at your Shearon Harris facility. The inspection findings were documented in NRC inspection report 05000400/2006003, dated July 28, 2006. Section 1R15 of the report identified an apparent violation (AV)05000400/2006003-02, Failure to Maintain Adequate Procedures Such That a Required Torque Was Not Provided for a Threaded Fastener on an Essential Services Chilled Water (ESCW) System Chiller. This AV was identified as having potential safety significance greater than very low, pending further NRC review.

The AV of Harris Technical Specification (TS) 6.8.1 involved maintenance procedures that did not adequately address torque requirements for the train A ESCW chiller pre-rotational vane shaft to actuator linkage fastener, leading to the train A ESCW chiller being inoperable for a period of time in excess of that permitted by TS 3.7.13. An in-office review of the AV was conducted which preliminarily determined the significance of the AV to be White (i.e., issue of low to moderate safety significance and will most likely result in additional inspections by the NRC) as indicated in the enclosed Significant Determination Process (SDP) phase III analysis.

This determination was based on the best available information, including influential assumptions, using the applicable SDP. One critical assumption that differs from your analysis of this deficiency is the viability of alternate high head injection/charging pump cooling via the portable fan upon loss of the A ESCW chiller. At present we do not have sufficient confidence to credit this operation.

PROPRIETARY INFORMATION CP&L

DOCUMENT CONTAINED HEREWITH CONTAINS PROPRIETARY INFORMATION. WHEN SEPARATED FROM THE ENCLOSURE, THIS DOCUMENT IS DECONTROLLED.

The finding does not represent a current safety concern since your staff took prompt actions to investigate and repair the problem. Further, the A ESCW chiller was subsequently tested successfully.

The AV involving requirements specified in TS 6.8.1 and TS 3.7.13 is being considered for escalated enforcement action in accordance with the NRC Enforcement Policy. The current Enforcement Policy is included on the NRCs Web site at http://www.nrc.gov/what-we-do/regulatory/enforcement/enforce-pol.html.

In accordance with Inspection Manual Chapter (IMC) 0609, we intend to complete our evaluation using the best available information and issue our final determination of safety significance within 90 days from such initial communication on July 28 2006.

The significance determination process encourages an open dialog between the staff and the licensee; however, the dialogue should not impact the timeliness of the staffs final determination. Before we make a final decision on this matter, we are providing you an opportunity (1) to present to the NRC, your perspectives on the facts and assumptions used by the NRC to arrive at the finding and its significance, at a Regulatory Conference or (2) submit your position on the finding to the NRC in writing. If you request a Regulatory Conference, it should be held within 30 days of the receipt of this letter and we encourage you to submit supporting documentation at least one week prior to the conference in an effort to make the conference more efficient and effective. If a Regulatory Conference is held, it will be open for public observation and the NRC will issue a press release to announce the conference. If you decide to submit only a written response, such submittal should be sent to the NRC within 30 days of the receipt of this letter.

Please contact Mr. Binoy Desai at (404) 562-4519 within 10 business days of the date of the receipt of this letter to notify the NRC of your intentions regarding the regulatory conference for the preliminary White finding. If we have not heard from you within 10 days, we will continue with our significance determination and associated enforcement processes on this finding, and you will be advised by separate correspondence of the results of our deliberations on this matter.

Since the NRC has not made a final determination in this matter, no Notice of Violation is being issued for the inspection finding at this time. In addition, please be advised that the number and characterization of the AV described in the NRC Inspection Report 05000400/2006003 may change as a result of further NRC review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). However, the NRC is continuing to review the appropriate classification of the attached SDP Phase 3 Risk Analysis within our records management program, considering changes in our practices following the events of September 11, 2001.

The Enclosure and its Attachments contains Sensitive Unclassified Information and its

PROPRIETARY INFORMATION CP&L

DOCUMENT CONTAINED HEREWITH CONTAINS PROPRIETARY INFORMATION. WHEN SEPARATED FROM THE ENCLOSURE, THIS DOCUMENT IS DECONTROLLED.

disclosure to unauthorized individuals could present a security vulnerability. Therefore, in accordance with 10 CFR 2.390(d)(1), the Enclosure and its Attachment will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will inform you if the classification of this document changes as a result of our ongoing assessments. ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Charles A. Casto, Director Division of Reactor Projects Docket No. 50-400 License No. NPF-63 Enclosure:

Phase 3 SDP Risk Analysis and Related Attachments

cc w/encl: (See page 4)

PROPRIETARY INFORMATION CP&L

DOCUMENT CONTAINED HEREWITH CONTAINS PROPRIETARY INFORMATION. WHEN SEPARATED FROM THE ENCLOSURE, THIS DOCUMENT IS DECONTROLLED.

disclosure to unauthorized individuals could present a security vulnerability. Therefore, in accordance with 10 CFR 2.390(d)(1), the Enclosure and its Attachment will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will inform you if the classification of this document changes as a result of our ongoing assessments. ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Charles A. Casto, Director Division of Reactor Projects Docket No. 50-400 License No. NPF-63 Enclosure:

Phase 3 SDP Risk Analysis and Related Attachments

cc w/encl: (See page 4)

X PUBLICLY AVAILABLE

G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML062550315 OFFICE RII:DRP RII:DRP RII:DRP RII:EICS RII:ORA RII:ORA SIGNATURE SON /RA/

BBD /RA/

RXM via email CFE /RA/

WGR /RA/

NAME SNinh BDesai RMusser Cevans WRogers DATE 09/11/2006 09/11/2006 09/11/2006 09/11/2006 09/7/2006 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

PROPRIETARY INFORMATION CP&L

DOCUMENT CONTAINED HEREWITH CONTAINS PROPRIETARY INFORMATION. WHEN SEPARATED FROM THE ENCLOSURE, THIS DOCUMENT IS DECONTROLLED.

OFFICIAL RECORD COPY DOCUMENT NAME: E:\\Filenet\\ML062550315.WPD cc w/encl:

Chris L. Burton, Manager Performance Evaluation and Regulatory Affairs CPB 9 Carolina Power & Light Company Electronic Mail Distribution cc w/o encl:

Robert J. Duncan II Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Eric McCartney Plant General Manager--Harris Plant Progress Energy Carolinas, Inc.

Shearon Harris Nuclear Power Plant Electronic Mail Distribution J. Wayne Gurganious Training Manager-Harris Plant Progress Energy Carolinas, Inc.

Harris Energy & Environmental Center Electronic Mail Distribution Christos Kamilaris, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution David H. Corlett, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution David T. Conley Associate General Counsel - Legal Department Progress Energy Service Company, LLC Electronic Mail Distribution John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, NC 27602 Tommy Emerson, Chair Board of County Commissioners of Chatham County Electronic Mail Distribution Distribution w/encl: (See page 5)

PROPRIETARY INFORMATION CP&L

DOCUMENT CONTAINED HEREWITH CONTAINS PROPRIETARY INFORMATION. WHEN SEPARATED FROM THE ENCLOSURE, THIS DOCUMENT IS DECONTROLLED.

Letter to Mr. C. J. Gannon, Jr. from Charles A. Casto dated September 11, 2006 SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NRC INTEGRATED INSPECTION REPORT 05000400/2006003; PRELIMINARY WHITE FINDING Distribution w/o encl:

C. Patel, NRR C. Evans L. Trocine, OE S. Sparks, RII L. Slack, RII OEMAIL RIDSNRRDIRS PUBLIC