IR 05000400/2012404

From kanterella
Jump to navigation Jump to search
IR 05000400-12-404, on 12/03/2012, Shearon Harris Nuclear Power Plant - U.S. Nuclear Regulatory Commission Security Inspection, OUO Removed
ML13004A449
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/02/2013
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Hamrick G
Carolina Power & Light Co
References
IR-12-404
Download: ML13004A449 (4)


Text

January 2, 2013

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000400/2012404

Dear Mr. Hamrick:

On December 3, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Shearon Harris Nuclear Power Plant, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with you and other members of your staff.

This inspection examined activities conducted under your license as they relate to security, and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. There were no findings identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy A. Desai, Chief Plant Support Branch 2 Division of Reactor Safety

Docket No.

50-400 License No. NPF-63

Enclosure:

Inspection Report 05000400/2012404 w/Attachment Supp. Info. (OUO)

cc w/encl: (See page 3)

ML13004A449 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS RI: DRS RII: DRS RII: DRP

SIGNATURE RA/JHW2 RA/GES -Email RA/BBD RA/RXM1

NAME J. Wallo G. Smith B. Desai R. Musser

DATE 12/21/2012 12/27/2012 12/26/2012 12/26/2012

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO cc w/Encl:

George Vice President Carolina Power and Light Company Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

Ernest J. Kapopoulos Jr.

Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562

R. Keith Holbrook Manager, Support Services Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562

David H. Corlett Supervisor Licensing/Regulatory Programs Progress Energy P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

Joseph W. Donahue Vice President Nuclear Oversight Progress Energy TPP-15 100 E. Davie Street Raleigh, NC 27601

Edward T. O'Neil Director Nuclear Protective Serv and Emergency Preparedness Progress Energy TPP-15 100 East Davie Street Raleigh, NC 27601

Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562